Thursday, October 25, 2018, 11:03, chad fisher, South Hot-Cell, Repair, , , Exit 2 West 8x
|
Actuator arms, lemos, lemos and banana plug block have been disconnected in preparation for raising of the service tray. Aaron has pictures |
Tuesday, October 23, 2018, 10:53, chad fisher, South Hot-Cell, Repair, , , Exit 2 East
|
Cover 1 was removed from the exit module. Confirmed with David that the actuator rod that needed to be disconnected was the far left )as viewed by the hot cell operator). The fastener for this rod was un-accessible from this side. Cover 1 was re-installed (two bolts left loose) and cover 2 was removed. fastener holding the actuator together was removed and luckily it does have a remote start. |
Thursday, April 19, 2018, 10:27, Travis Cave, ITW, Maintenance, , , Entrance module move
|
The west entrance module has been moved from the west target station to the silo. |
Thursday, May 17, 2018, 13:17, Travis Cave, ITW, Standard Operation, , , Entrance module move
|
The west entrance module has been moved from the silo to the west target station. |
Tuesday, August 07, 2018, 10:44, Travis Cave, South Hot-Cell, Maintenance, , , Entrance module move
|
The west entrance module has been moved from the west target station to the south hot cell, for a bellows replacement. |
Wednesday, May 08, 2019, 10:29, Travis Cave, South Hot-Cell, Standard Operation, , , Entrance module move
|
The entrance module has been moved from the west station to the south hot cell. |
Monday, May 13, 2019, 09:55, Travis Cave, ITW, Standard Operation, , , Entrance module move
|
The West Entrance module has been moved from the south hot cell to the west target station. |
Wednesday, March 11, 2020, 10:39, Travis Cave, ITE, Maintenance, , , Entrance module move
|
The entrance module has been moved to the east station to the south hot cell for inspection from the turbo pump explosion. |
Friday, March 13, 2020, 09:24, Travis Cave, ITE, Standard Operation, , , Entrance module move
|
The east entrance module has been moved from the south hot cell back to the east target station. |
Monday, July 27, 2020, 10:00, Travis Cave, South Hot-Cell, Maintenance, , , Entrance module move
|
The West Entrance module has been moved from the west target station to the south hot cell for repairs. |
Wednesday, July 29, 2020, 09:20, Travis Cave, ITW, Maintenance, , , Entrance module move
|
The West Entrance module has been moved from the south hot cell back to the West Target Station. |
Tuesday, September 08, 2020, 10:37, Travis Cave, ITW, Standard Operation, , no target, Entrance module move
|
The West Entrance module has been moved to the south hot cell for repairs. |
Friday, March 12, 2021, 11:36, Travis Cave, South Hot-Cell, Maintenance, , East Entrance Module, Entrance module move
|
The East Entrance Module has been moved from the East Target Station to the South Hot Cell. |
Wednesday, March 17, 2021, 09:10, Travis Cave, ITE, Standard Operation, , , Entrance module move
|
The east entrance module is now back at the east target station. |
Monday, January 22, 2024, 09:56, David Wang, ITW, Standard Operation, , , Entrance module has been connected in ITW pit.
|
Entrance module has been connected in ITW pit per document 190510 " entrance module disconnection and removal procedure".
|
Friday, February 28, 2020, 09:36, David Wang, ITE, Repair, , , Entrance module TP1S broken piesces clean up.
|
Using the camera, Frank and I inspected the broken blades in vacuum duct bending section. We are pretty sure some of the broken parts are fallen into bottom of entrance module and vacuum vessel since the broken pars are over on the edge of bending section. The blades rotated at high speed. Basically, They were shoot to the duct opening when they were broken from the pump. Frank and I carefully swiped all broken parts from the edges back to center of duct first. Then, We use vacuum cleaner sucked all broken parts out of the entrance module. We can see lots aluminum dust during the clean up. This kind of aluminum dust also could fallen down to bottom of module and vessel. After clean up, We inspected duct with camera. We can see all broken pieces and dust are cleaned out. The removed broken pieces will be stored with broken pump when the vessel bottom clean up is done. |
Thursday, March 12, 2020, 13:48, David Wang, ITE, Repair, , , Entrance module TP1S broken piesces clean up.
|
The broken pieces in ITE entrance vacuum pit are vacuumed out. At SHC, There are 4 pieces on module collimator block top, wiring scanner top. Chad removed them out at SHC. Electrical check at module top is done by diagnostics group. Everything works fine. |
Monday, August 24, 2020, 10:11, Adam Newsome, ITW, Standard Operation, , , Entrance Module to ITW
|
Entrance Module was moved from South Hot Cell to ITW Station.
Note: weight of entrance module, as shown via overhead crane's load cell, is 14,900 lbs. |
Tuesday, July 28, 2020, 09:26, chad fisher, South Hot-Cell, Repair, , , Entrance Module Wire Scanner
|
Entrance module wire scanner has been replaced. Pictures to follow. |
Thursday, November 21, 2013, 12:12, Anders Mjos, South Hot-Cell, Standard Operation, TM3, NiO#2, End of beam target inspection - ANODE does not hold 250V
|
The target was inspected by Chad and Anders in the Hot Cell. Electrical megger tests were done during the assembly. It was found that Insulators No 3 (ITD0311) and No 2 (ITD0310) failed to hold voltage after the run.
|
[V] |
[kOhm] |
ANODE - HS |
40 |
21 |
ANODE - TGT |
100 |
55 |
HS - TGT |
100 |
55 |
Lid removed |
|
|
ANODE - HS |
40 |
21 |
ANODE - TGT |
90 |
41 |
HS - TGT |
100 |
55 |
Target removed |
|
|
ANODE - HS |
245 |
139 |
No 3 Ins - TBHT |
0 |
0 |
No 2 Ins |
110 |
64 |
No 2 Ins removed |
|
|
ANODE - HS |
540 |
OL |
EE to HS was measured OL at 1000 V.
Photos can be found on DocuShare
|
|