ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
 |
1564
|
Friday, June 23, 2017, 17:28 |
Isaac Earle | North Hot-Cell | Development | | | NHC module flange and cameras installed | The North Hot Cell module support
flange (IRH1152D) was installed on June 21,
2017 using 1/8" rubber sheet as a sealing |
    |
1574
|
Thursday, June 29, 2017, 11:55 |
David Wang | Conditioning Station | Repair | | | TCS HV cable and feed through installation | John Chow and I installed new TCS HV cable
and feed through with their mounting panel
back to TCS Faraday cage this Tuesday. ECO-4269 |
|
1575
|
Thursday, June 29, 2017, 14:42 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#20 | Spent Target Move | The spent UC#20 has been moved from
the south hot cell to the spent target vault.
It was placed in pail #150 and spot 1B in |
|
1577
|
Wednesday, July 05, 2017, 15:36 |
Isaac Earle | North Hot-Cell | Development | | | NHC and SHC nuclear ventilation flow sensors installed | Installation of new flow sensors
and transmitters for the NHC and SHC duct
lines was completed in the target hall today. |
 |
1578
|
Thursday, July 06, 2017, 14:23 |
Isaac Earle | North Hot-Cell | Repair | | | Slave side Z motion tape snapped on NHC right side manipulator | The NHC right side manipulator was evaluated
today to check if operation was normal through
all ranges of motion. The manipulator |
|
1579
|
Monday, July 10, 2017, 09:09 |
Dan McDonald | North Hot-Cell | Repair | | | manipulator cart repair | A hydraulic leak was found on the
manipulator install and repair cart,
upon further investigation the cause was |
|
1582
|
Wednesday, July 12, 2017, 11:05 |
Anders Mjos | Conditioning Station | Maintenance | | | Testing of new high voltage cable | The target hall has been locked-out as
per Document-70039.
Forced IG1, IG1S and IG2 to switch |
|
1586
|
Tuesday, July 18, 2017, 15:04 |
Travis Cave | Crane | Maintenance | | | Failure of the ISAC TH Crane Rotate. | Earlier in the day it was noted that
the rotate function of the crane had creased
operation. After David has finished the block |
|
1592
|
Wednesday, August 02, 2017, 15:41 |
Keith C Ng | Assembly/Bench Test | Development | | | spare source tray build | After re zeroing alignment telescope to
master jig and adjusted parts into place:
|
 |
1593
|
Thursday, August 03, 2017, 15:02 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#36 | Spent Target Move | The spent SiC#36 has been moved from
the south hot cell to the spent target vault. |
|
1596
|
Wednesday, August 09, 2017, 16:39 |
Isaac Earle | North Hot-Cell | Development | | | NHC drain line into sump identified | The NHC drain line was tested by
pouring approximately 10 gallons of water
through the drain grate at the base of the |
|
1599
|
Tuesday, August 15, 2017, 12:10 |
Isaac Earle | North Hot-Cell | Development | | | ISAC Active Sump low water level measured | The ISAC active sump in the Active Service
Room (#002 on B2 level) was pumped out yesterday
using the standard procedure (Section 5.5.2 |
|
1600
|
Thursday, August 17, 2017, 14:38 |
Isaac Earle | North Hot-Cell | Development | | | 4/6 NHC roof blocks installed | Roof blocks IRH1641, IRH1642, IRH1643,
and IRH1644 have been fully assembled, labeled,
and installed as per drawing IRH1652. Fabrication |
7x |
1601
|
Friday, August 25, 2017, 16:33 |
Anders Mjos | Conditioning Station | Repair | | | Testing HV after cooling line repair | The BIAS voltage was brought up to
70 kV today and held there for 1h. No sparking
observed. |
|
1608
|
Wednesday, August 30, 2017, 11:37 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#52 | Spent Target move | The spent Ta#52 target has been moved from
the south hot cell to the spent target vault.
See attached PDF for details. |
|
1617
|
Tuesday, September 19, 2017, 10:40 |
chad fisher | South Hot-Cell | Maintenance | | | South East Manipulator Maintenence | Entered hot cell to preform replacement
of slave tong cable. Existing cable shows
no signs of wear so it has been re-installed. |
|
1630
|
Thursday, September 28, 2017, 11:59 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#53 | Spent Target move | The spent Ta#53 has been moved to the spent
target vault. See attached file for details. |
|
1634
|
Thursday, October 05, 2017, 11:04 |
Anders Mjos | ITW | Maintenance | | | Installation of new valve for module move ventilation | David installed the new ball valve and
connections for the SAS project module move
ventilation. SASP0482. Drawing reference |
|
1635
|
Friday, October 06, 2017, 11:12 |
Isaac Earle | North Hot-Cell | Development | | | NHC module port shield block and TCS vessel shield block installed | The NHC module port shield block
(IRH1645) and the TCS vessel shield block
(IRH1646) were installed yesterday in the |
    |
1636
|
Friday, October 06, 2017, 11:21 |
Isaac Earle | North Hot-Cell | Development | | | ISAC-1 active sump drain pipe modified | The 4" PVC drain line in the ISAC-1
active sump was modified so that the drain
pipe terminates below the low level water |
  |