Message ID: 1635     Entry time: Friday, October 06, 2017, 11:12
Author: Isaac Earle 
Category: North Hot-Cell 
Type: Development 
Module:  
Target/Number:  
Subject: NHC module port shield block and TCS vessel shield block installed 

 The NHC module port shield block (IRH1645) and the TCS vessel shield block (IRH1646) were installed yesterday in the target hall according to assembly drawing IRH1652.  No issues were encountered during installation.  Vacuum was pulled on the TCS and a leak check was performed on the shield: no leaks found.

 

IMG_0472.jpg

 

IMG_0476.jpg

 

IMG_0479.jpg

 

IMG_0481.jpg

 

IMG_0486.jpg