Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 116 of 140  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Category Type Moduledown Target/Number Subject
  1582   Wednesday, July 12, 2017, 11:05 Anders MjosConditioning StationMaintenance  Testing of new high voltage cable

The target hall has been locked-out as per Document-70039.

Forced IG1, IG1S and IG2 to switch on BIAS power supply

Wednesday, July 12, 2017, 11:53: 70 kV at 0.16 mA

2 sparks observed shortly after 70 kV was reached

Wednesday, July 12, 2017, 12:59: No sparks for the last hour.

BIAS power supply off. Forces removed.

Attachment 1: 2017-07-12_HV_Cable_Test.xlsx
  1586   Tuesday, July 18, 2017, 15:04 Travis CaveCraneMaintenance  Failure of the ISAC TH Crane Rotate.

 Earlier in the day it was noted that the rotate function of the crane had creased operation. After David has finished the block moves. Don and I checked the Crane's control unit in the ISAC crane control room and found the breaker tripped for the rotation. The breaker was reset and the crane's rotation is now operational. If this occurs in the future only Travis Cave, Don Jackson or a TRIUMF Electrician are allowed in that control box as it is a 480Volt system. Don or I because we know what we are looking for and the Electrician because they are allowed to touch with and deal 480 V systems. 

  1592   Wednesday, August 02, 2017, 15:41 Keith C NgAssembly/Bench TestDevelopment  spare source tray build

After re zeroing alignment telescope to master jig and adjusted parts into place:

 

Orientation: X = Left -, Right+; Y = Up +, Down -

 

Front wire target

X = 0.000, Y = 0.000

 

Rear wire target

X = 0.000, Y = +.008" (high)

 

All fasteners torqued to specification, steerer housing and assembly not installed yet. Weight of steerer assembly might cause rear to sag into place. Otherwise may attempt to split difference between the front and rear elements (alignment is on an angle in the horizontal vertical plane.)

Attachment 1: 20170802_sourcetray_RHB_8264.JPG
20170802_sourcetray_RHB_8264.JPG
Attachment 2: 20170802_sourcetray_RHB_8266.JPG
20170802_sourcetray_RHB_8266.JPG
  1593   Thursday, August 03, 2017, 15:02 Travis CaveSpent Target VaultStandard Operation SiC#36Spent Target Move

 The spent SiC#36 has been moved from the south hot cell to the spent target vault.

Attachment 1: Vault_Storage_August_3_2017.pdf
Vault_Storage_August_3_2017.pdf Vault_Storage_August_3_2017.pdf Vault_Storage_August_3_2017.pdf Vault_Storage_August_3_2017.pdf
  1596   Wednesday, August 09, 2017, 16:39 Isaac EarleNorth Hot-CellDevelopment  NHC drain line into sump identified

 The NHC drain line was tested by pouring approximately 10 gallons of water through the drain grate at the base of the NHC partition wall.  Water was seen a few minutes later pouring into the sump labeled "ACTIVE SUMP" from the light coloured pipe on the west side of the inside of the sump.  Rob Walker had previously said that the hot cells drain into the sump next to this one which is labeled "SANITARY SUMP", which appears to be incorrect.

  1599   Tuesday, August 15, 2017, 12:10 Isaac EarleNorth Hot-CellDevelopment  ISAC Active Sump low water level measured

The ISAC active sump in the Active Service Room (#002 on B2 level) was pumped out yesterday using the standard procedure (Section 5.5.2 of the ISAC Operators' Manual, V1.0).  The procedure makes use of the auto stop feature of the pump-out system which stops when a low level float switch is triggered.  The water level was measured after pumping stopped, and was found to be approximately 21" above the base of the sump.  A new section of pipe will be added to the 4" drain line in the sump to move the drain opening below the low level water line so that air in the sump is not pulled into the drain network (which could end up in the NHC or TCS space).

  1600   Thursday, August 17, 2017, 14:38 Isaac EarleNorth Hot-CellDevelopment  4/6 NHC roof blocks installed

 Roof blocks IRH1641, IRH1642, IRH1643, and IRH1644 have been fully assembled, labeled, and installed as per drawing IRH1652.  Fabrication of TCS shield block (IRH1646) and NHC module port block (IRH1645) is still in progress.

 IMG_0381.jpg

 

IMG_0369.jpg

 

IMG_0368.jpg

 

IMG_0364.jpg

 

IMG_0362.jpg

 

IMG_0340.jpg

Attachment 1: IMG_0381.jpg
IMG_0381.jpg
  1601   Friday, August 25, 2017, 16:33 Anders MjosConditioning StationRepair  Testing HV after cooling line repair

 The BIAS voltage was brought up to 70 kV today and held there for 1h. No sparking observed.

Attachment 1: 2017-08-25_HV_Water_Line_Test.xlsx
  1608   Wednesday, August 30, 2017, 11:37 Travis CaveSpent Target VaultStandard Operation Ta#52Spent Target move

The spent Ta#52 target has been moved from the south hot cell to the spent target vault. See attached PDF for details.

Attachment 1: Vault_Storage_August_30_2017.pdf
Vault_Storage_August_30_2017.pdf Vault_Storage_August_30_2017.pdf Vault_Storage_August_30_2017.pdf Vault_Storage_August_30_2017.pdf
  1617   Tuesday, September 19, 2017, 10:40 chad fisherSouth Hot-CellMaintenance  South East Manipulator Maintenence

Entered hot cell to preform replacement of slave tong cable. Existing cable shows no signs of wear so it has been re-installed. A spare tong cable has been loaded into a spare tong while in the hot cell in preparation for next time this cable needs to be replaced.

  1630   Thursday, September 28, 2017, 11:59 Travis CaveSpent Target VaultStandard Operation Ta#53Spent Target move

The spent Ta#53 has been moved to the spent target vault. See attached file for details.

Attachment 1: Vault_Storage_September_28_2017.pdf
Vault_Storage_September_28_2017.pdf Vault_Storage_September_28_2017.pdf Vault_Storage_September_28_2017.pdf Vault_Storage_September_28_2017.pdf
  1634   Thursday, October 05, 2017, 11:04 Anders MjosITWMaintenance  Installation of new valve for module move ventilation

David installed the new ball valve and connections for the SAS project module move ventilation. SASP0482. Drawing reference ISK5029B.

  1635   Friday, October 06, 2017, 11:12 Isaac EarleNorth Hot-CellDevelopment  NHC module port shield block and TCS vessel shield block installed

 The NHC module port shield block (IRH1645) and the TCS vessel shield block (IRH1646) were installed yesterday in the target hall according to assembly drawing IRH1652.  No issues were encountered during installation.  Vacuum was pulled on the TCS and a leak check was performed on the shield: no leaks found.

 

IMG_0472.jpg

 

IMG_0476.jpg

 

IMG_0479.jpg

 

IMG_0481.jpg

 

IMG_0486.jpg

  1636   Friday, October 06, 2017, 11:21 Isaac EarleNorth Hot-CellDevelopment  ISAC-1 active sump drain pipe modified

The 4" PVC drain line in the ISAC-1 active sump was modified so that the drain pipe terminates below the low level water line of the automatic pump-out system.  This will prevent backflow of sump gasses into the SHC, NHC, or TCS space if the air pressure in any of those rooms are lower than the sump air pressure.  The details of the modification were specified by Mechanical Services Group, and the work was done by Paul Jensen.  This system is defined in drawing IAM19183.

 

IMG_0513.jpg

 

IMG_0516.jpg

 

IMG_0517.jpg

  1637   Friday, October 06, 2017, 13:25 Anders MjosConditioning StationRepair  HV Test

 HV was brought up to 70 kV for 1 h without sparks to test the new water installation.

Attachment 1: 2017-10-06_HV_Water_Line_Test.xlsx
  1638   Tuesday, October 10, 2017, 10:38 David WangITWStandard Operation   5 shielding blocks have been transferred from ITE to ITW .

ITW is configured to take proton beam.

  1639   Tuesday, October 10, 2017, 10:45 David WangConditioning StationRepair  Re-route TCS water lines.

TCS  cooling polyurethane lines have been re-routed to solve to HV sparking issue on old configuration between lines and bais plate.  New re-routed system is tested to 70KV without spark. No leak has been found on new lines after the test.

ECO 4369, drawings and models IRH1715, IRH1716 have been issued and released for this job. Drawings and Models are located in PDM-ISAC1 -TCS polyurethane water lines re-route folder.

Attachment 1: TCS_re-route_001.JPG
TCS_re-route_001.JPG
Attachment 2: TCS_re-route_002.JPG
TCS_re-route_002.JPG
Attachment 3: TCS_re-route_003.JPG
TCS_re-route_003.JPG
Attachment 4: TCS_re-route_004.JPG
TCS_re-route_004.JPG
Attachment 5: TCS_re-route_005.JPG
TCS_re-route_005.JPG
Attachment 6: TCS_re-route_006.JPG
TCS_re-route_006.JPG
Attachment 7: TCS_re-route_007.JPG
TCS_re-route_007.JPG
Attachment 8: TCS_re-route_008.JPG
TCS_re-route_008.JPG
  1640   Wednesday, October 11, 2017, 15:50 Keith C NgAssembly/Bench TestStandard Operation  spare source tray build alignment

 

 

Spare source tray build continued.

 

Initial alignment check in the morning:

 

- Target mounting plate target: Horizontal: .002, Vertical: -.002

- Ground electrode (bore) target, with un-clamped target: H 0.0 V -.003

- Ground electrode target (with target clamped): H: 0.0, V: .010

 

 

@14:10: sighting Master target position WRT sighting axis, calculated using the edges of the brunson target center circle edges calculated to center. Target circle is .02" in diameter.

 

- Master target mounted with slight finger torque.

- Front of master target, H .002 V -.002

- Rear of master target, H: 0.0 V: .005 (circle target is .020" in diameter)

- Rear of ground electrode target, H: .002, V: 0.011

 

 

@14:49: Replace mount plate target.

 

- Target mounting plate target: H -.001, V .001

- Ground electrode target: H .002, V .011 (rear target was rotated 90 deg from in the morning as a check)

 

 

@15:21 Steerer cone re-alignment.

 

- Undid the six screws holding the steerer cone and steerers to the aluminum flange and adjusted cone tip to RIB axis. The ground electrode bore was deemed not to be adjustable to the RIB axis with the current build order.

*Steerer cone assembly torque is 23 in-lbs

- Steerer cone target, H: .001, V: 0.0

- Steerer cone target, H: .002, V: .002 (after rotating target 180 degrees)

 

 

@15:30 Replaced target mounting plate target.

 

- Mounting plate target, H: .001, V: -0.001


Will go ahead and finish mounting components to mounting plate and final check the alignment after.

  1641   Thursday, October 12, 2017, 08:48 Travis CaveSpent Target VaultStandard Operation  Field measurements of the old source trays

 Field measurements were taken of the old source trays. The old TM#2 source tray had a minimum field value of 0.50 mSv/hr and a maximum of 1.18 mSv/hr through 360 deg of rotation. The box was rotated around three times and put back in the vault. TM#1 old source tray was also removed and measured as well the field values for it were a minimum of 0.52 mSv/hr and a maximum of 1.15 mSv/hr through 360 deg of rotation. The box was rotated around three times and placed back in the vault. In both cases the box was roughly one metre from the radiation monitor.   

  1642   Friday, October 13, 2017, 11:14 Keith C NgAssembly/Bench TestStandard Operation  source tray alignment/build

Source tray is complete for brazing, gas line bracket is currently missing but can be made in parallel with tube bending operations.

Source tray water lines to be fabricated according to ITA6144 drawing set.

- Alignment between target mounting plate and steerer cone is holding within .002"

- Aluminum soldering jigs are installed in place of the ceramics with fasteners only torqued just past "finger tight".

Attachment 1: 20171013_sourcetray_P1030815.JPG
20171013_sourcetray_P1030815.JPG
Attachment 2: 20171013_sourcetray_P1030816.JPG
20171013_sourcetray_P1030816.JPG
Attachment 3: 20171013_sourcetray_P1030817.JPG
20171013_sourcetray_P1030817.JPG
Attachment 4: 20171013_sourcetray_P1030818.JPG
20171013_sourcetray_P1030818.JPG
ELOG V2.9.2-2455