1808
|
Tuesday, October 23, 2018, 11:32 |
David Wang | South Hot-Cell | Maintenance | | | ITW RV4S leak check. | ITW RV4S (A and B) are leak checked. They
are good. |
|
1809
|
Thursday, October 25, 2018, 11:03 |
chad fisher | South Hot-Cell | Repair | | | Exit 2 West | Actuator arms, lemos, lemos and banana
plug block have been disconnected in preparation
for raising of the service tray. Aaron has |
8x |
1810
|
Friday, October 26, 2018, 09:44 |
Travis Cave | Conditioning Station | Standard Operation | | | Exit Module moved | The west exit #2 module has been moved from
the south hot cell to the conditioning station. |
|
1811
|
Monday, October 29, 2018, 10:43 |
David Wang | Conditioning Station | Repair | | | ITW exit 2 leak check at TCS. | I did a leak check this morning on exit
2 module at TCS. LD base leak rate
is 4.00XE-9atm.cc/sec, Base pressure is 0.00 |
|
1820
|
Thursday, November 08, 2018, 09:27 |
chad fisher | South Hot-Cell | Maintenance | | | South East Manipulator cable replacement | The handle cable on the east manipulator
of the south hot cell has been replaced.
Old cable showed signs of wear but had no |
|
1825
|
Thursday, November 22, 2018, 14:38 |
Isaac Earle | North Hot-Cell | Development | | | NHC design approved by High Voltage Engineer | To satisfy RS 101 from the NHC requirements
specification (Document-131915) Tomislav
Hurskovec was consulted regarding high voltage |
|
1826
|
Monday, November 26, 2018, 12:19 |
chad fisher | North Hot-Cell | Repair | | | East Manipulator | In preparation for removing the slave for
replacement I discovered that the timing
screw in the handle cable drum (master side) |
 |
1829
|
Wednesday, November 28, 2018, 06:39 |
David Wang | Conditioning Station | Standard Operation | | | Disconnection checklist LpTa #56 | TM4 was disconnected in ITE. Checklist
list in attachment. |
|
1833
|
Thursday, November 29, 2018, 06:38 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | Leak check TM4 UCx 26 at SHC. | Chad and I did a leak check on TM4 HS line
with UCx 26# installed . Base LR 0.0X E-9
atm.cc/sec. Base pressure 0.0XE-4 torr. |
|
1837
|
Friday, December 07, 2018, 08:47 |
chad fisher | North Hot-Cell | Repair | | | North hot cell spare slave repair | The tong cable on the spare north hot cell
slave has been repaired. Slave came from
the factory with the tong cables straddling |
|
1838
|
Friday, December 07, 2018, 10:37 |
chad fisher | North Hot-Cell | Repair | | | Ariel connector test | Completed testing of connectors for Ariel
using the north hot cell.
Video can be found on docushare; |
|
1839
|
Monday, December 10, 2018, 15:31 |
Isaac Earle | North Hot-Cell | Development | | | NHC remote connection testing with manipulators | The following tests have been successfully
completed using the NHC manipulators:
Ventilation pre-filter |
|
1841
|
Tuesday, December 18, 2018, 11:13 |
Isaac Earle | North Hot-Cell | Development | | | NHC manipulator slave-end swap, RH test, and various other work | The following
North Hot Cell work was completed over the
last week under work permit I2018-12-12-1: |
|
1843
|
Wednesday, January 02, 2019, 10:26 |
Anders Mjos | Conditioning Station | Standard Operation | | | Restarrted TP1S | Found pumps off after the holidays. Restarted
roughing pump and TP1S |
|
1844
|
Thursday, January 03, 2019, 13:30 |
David Wang | ITW | Repair | | | ITH:MP1 | ITH:MP1 inlet pressure showed 10torr after
power outage during holiday. All ITE/W turbo-pumps
were tripped because of it. Removed one shielding |
|
1845
|
Thursday, January 03, 2019, 13:41 |
David Wang | Crane | Repair | | | Target hall crane PLC issue. | Target hall crane did not work properly
after power outage during Christmas time.
The only movement could be operated is crane |
|
1846
|
Friday, January 04, 2019, 08:48 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been disconnected in ITW. | TP1, TP2 are still connected for next week
leak check. All water lines in TM2 are purged
with 80 psi air, each for 5 minutes. |
|
1847
|
Friday, January 04, 2019, 14:38 |
Isaac Earle | North Hot-Cell | Development | | | NHC cameras tested | The NHC module support flange cameras (4
total) as well as the NHCSA camera were tested
today and confirmed to be working properly. |
  |
1848
|
Tuesday, January 08, 2019, 08:49 |
David Wang | ITW | Standard Operation | TM2 | | TP1 TP1 have been disconnected in ITW | Started argon venting of ITW now. |
|
1849
|
Wednesday, January 09, 2019, 06:26 |
David Wang | Conditioning Station | Standard Operation | | | TCS vacuum pumps have been stopped. | The tCS will be vented soon for TM2 move
later this week. |
|