1740
|
Monday, June 25, 2018, 11:31 |
chad fisher | South Hot-Cell | Standard Operation | | | Fields at Al cover | The shield door has been opened and fields
measured at 77 uSv/h on contact at the AL.
panel. |
|
|
1741
|
Monday, June 25, 2018, 16:42 |
Anders Mjos | Conditioning Station | Development | | | Testing new high current connectors | Shorted TGHT with new high current connector
assembly and heated to 600 A. Temperature
measured on half way point on cable ~ 70 |
|
|
1742
|
Tuesday, June 26, 2018, 08:56 |
chad fisher | South Hot-Cell | Standard Operation | | | South Hot Cell Fields | hot items have been moved and shielded
as much as possible. Field at left manipulator
has been reduced from 560 uSv/h to 85 uSv/h. |
|
|
1744
|
Friday, June 29, 2018, 10:12 |
chad fisher | South Hot-Cell | Maintenance | | | Manipulator Tong Cable Replacement | Tuesday, June 26 the broken tong cable
was replaced on the west manipulator in the
south hot cell. Wednesday the tong cable |
|
|
1745
|
Friday, June 29, 2018, 10:15 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | | TM2 work and target install | On Thursday, June 29th the containment
box of TM2 was removed and the optics tray
re-installed and reconnected. The box was |
|
|
1746
|
Friday, June 29, 2018, 10:27 |
chad fisher | South Hot-Cell | Maintenance | | | South Hot Cell Filter Change | At the end of manipulator repair Thursday
the ventilation pre-filter in the hot cell
was changed. Old filter remains in the hot |
|
|
1749
|
Tuesday, July 03, 2018, 14:38 |
David Wang | ITW | Standard Operation | | | ITW water signals interlock check. | Annual ITW water signals interlock check
are done. Everything works good. |
|
|
1755
|
Thursday, July 19, 2018, 09:17 |
chad fisher | South Hot-Cell | Repair | TM4 | | New Optics Tray Modification | The waterline loop bracket has been installed
onto the new loop holding bracket and both
installed onto the new source tray. |
 |
|
1756
|
Thursday, July 19, 2018, 14:22 |
Isaac Earle | North Hot-Cell | Development | | | NHC diagnostic signals - connector and wiring details | Installation of the diagnostic connections
between the NHC hot and cold sides has been
completed. The cable bundle was prepared |
|
|
1761
|
Wednesday, August 01, 2018, 09:47 |
Isaac Earle | North Hot-Cell | Development | | | NHC diagnostic signals and control panel tested | On July 30th the NHC diagnostic
signals were tested:
- 9 pin CPC: a shorting plug was |
|
|
1764
|
Thursday, August 02, 2018, 07:57 |
David Wang | Conditioning Station | Standard Operation | | | Leak check on TM2 UCx #23 @ TCS and SHC. | I did a helium pressure test on TM2 HS
line at TCS. At 70psi helium, the leak rate
is 2.5 xE-7 atm.cc/sec. I think this is the |
|
|
1766
|
Tuesday, August 07, 2018, 10:44 |
Travis Cave | South Hot-Cell | Maintenance | | | Entrance module move | The west entrance module has been
moved from the west target station to the
south hot cell, for a bellows replacement. |
|
|
1771
|
Thursday, August 30, 2018, 07:42 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 has been connected to TCS. | TM4 has been connected to TCS. vacuum system
and water system are started. Everything
looks fine. |
|
|
1772
|
Thursday, August 30, 2018, 07:46 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 HS line leak check at TCS and SHC. | Chad and I leak checked TM4 HS line after
UCx 24 is installed. No leak at 5xE-9atm.cc/sec.
Today, I did helium pressure test on HS line |
|
|
1780
|
Wednesday, September 12, 2018, 15:22 |
Isaac Earle | North Hot-Cell | Development | | | NHC air and gas supply lines - test and leak check | Testing was completed today on the NHC
air and gas supply lines. For each
line a Staubli plug was installed on the |
|
|
1781
|
Wednesday, September 12, 2018, 15:30 |
Isaac Earle | North Hot-Cell | Development | | | Installation of NHC operator-level lighting completed | Installation of of operator-level
lighting in the NHC was completed today according
to drawing IRH1801. 2" x 2" |
  |
|
1782
|
Thursday, September 13, 2018, 16:57 |
Isaac Earle | North Hot-Cell | Development | | | NHC grounding and mili-ohm testing | The
following equipment has been connected to
the building ground located in the Target |
|
|
1792
|
Tuesday, September 25, 2018, 07:54 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 is connected for HV test at TCS. | water loops are by passed on top. All bias,
EE, and EL are tied together. Started
water system. |
|
|
1794
|
Tuesday, September 25, 2018, 08:48 |
chad fisher | South Hot-Cell | Maintenance | | | Window leak and torque | The south hot cell window has been found
to be leaking oil. Upon inspection yesterday
I found that the bolts compressing the gasket |
|
|
1795
|
Wednesday, September 26, 2018, 07:14 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 HV test at TCS. | I did a HV test on TM3 at TCS yesterday.
HV Ramp up speed: 1KV per 5 minutes when
below 30KV,1KV per 10 minutes from 30-36KV. |
|