  396   Thursday, July 04, 2013, 11:37 David WangITWStandard OperationTM1UCxI reconnected TM1 to ITW. I  reconnected TM1 to ITW on
02 July.The pumping down is good so far.
TM1 water interlock check is good also.
  
  567   Wednesday, December 04, 2013, 11:05 David WangITWStandard OperationTM4Ta41#I disconnected TM4 in ITWI disconnected TM4 in ITW .The job took
about 20minutes and I got 0.11 msv dose.
  
  896   Thursday, April 23, 2015, 09:08 David WangConditioning StationMaintenanceTM1UCx12Huge Leak on TM1 contaiment box window.There is a huge leak on TM1 containment
box window. I did a 70 psi helium pressure
test on all TM1 water circuits this morning.
 006.JPG008.JPG011.JPG009.JPGTM1_leak_check_at_CS_2015-04-23.pdf 
  850   Friday, February 27, 2015, 09:34 chad fisherSouth Hot-CellMaintenance  Hot cell Entry February 25 2015See attached report.
Summary:
Radio problems just before entry
 ISAC_South_Hot_Cell_Entry.pdf 
  980   Friday, July 03, 2015, 13:29 chad fisherSouth Hot-CellRepairTM2 Hot Cell/ Module FieldsField measured at block "R" through
tool port with pole monitor is 6.65 mSv/H.
There are three air hoods and two
  
  855   Monday, March 09, 2015, 09:42 chad fisherSouth Hot-CellDevelopment  Hot Cell Table Swiping3 swipes of the south hot cell table were
taken from the target hall through the roof
hatch (2 standard, 1 alpha).
  
  166   Friday, August 31, 2012, 12:10 chad fisherSouth Hot-CellMaintenance  Hot Cell MaitenanceEntered south hot cell Wednesday and replaced
the pre-filter air filter as well as the
front two light bulbs. Also removed two bags
  
  1449   Tuesday, March 14, 2017, 07:34 chad fisherSouth Hot-CellMaintenance  Hot Cell FieldsI have re-measured the fields in the hot
cell. Fields at shield door Al cover are
101 uSv\h, in cell at the east manipulator
  
  2073   Thursday, February 27, 2020, 16:08 Anders MjosNorth Hot-CellMaintenance  Hot Cell EntryChad entered the NHC today to tighten set-screws
on both slave side manipulators and re-align
the West side slave. Work took place using
 NHC_2020-02-27.pdf 
  2215   Monday, May 03, 2021, 15:14 Frank SongITEMaintenance  High voltage test in ITE Anders and I prepared ITE high voltage
test in April 30 ( Friday morning), The MAA
is locked for this.
  
  2183   Wednesday, January 27, 2021, 14:30 David WangCoolingDevelopment  High active water system purgingHigh active water are purged to holding
tank at B2  level. There should be around
48 gallons are purged out of system. No purging
  
  85   Monday, April 16, 2012, 16:17 Bevan MossConditioning StationStandard OperationTM1No TargetHigh Voltage Test A high voltage test was completed
on a target free TM1 in the conditioning
station. Only the turbo pumps on the target
  
  764   Tuesday, October 14, 2014, 17:19 Anders MjosConditioning StationStandard OperationTM3No targetHigh Voltage ConditioningWednesday, October 14, 2014
 The BIAS voltage was brought
up between 1:30pm and 5pm. Sparks tripped
 TCS_TM3.docx 
  829   Wednesday, January 07, 2015, 09:31 Anders MjosConditioning StationDevelopmentTM2 High Voltage ConditioningNo Source Tray installed. Loop on cooling
circuit D. All other circuits blanked off.
Voltages stated below are set point
  
  47   Wednesday, November 02, 2011, 13:12 Bevan MossConditioning StationStandard OperationTM4SiC#26 High PoweredHigh Voltage (HV) testing The silicon carbide targets voltage
was raised to 42 kV today before continuous
current draw was observed. It took roughly
  
  59   Friday, November 18, 2011, 16:29 Bevan MossConditioning StationStandard OperationTM1N/AHigh Voltage (HV) testing TM1 was high voltage tested without
a target on November 16, 2011 with Don Jackson,
Pierre Bricault, and Bevan Moss. The module
 TM1_High_Voltage_Test_Nov_16_2011.JPG 
  1200   Friday, April 08, 2016, 08:13 Anders MjosITE/ITW CoolingMaintenance  High Active Water ResistivityThe high active water resistivity took
a long time to recover after the upgrade
to the water cooling circuit. The system
 2016-04-08_ISAC_High_Active_Water_Resistivity.png 
  2048   Tuesday, January 14, 2020, 10:12 David WangConditioning StationStandard OperationTM3 Helium spray leak check on TCS.Using a long pole with a probe to spray
helium on TCS vacuum seals and joints which
are installed in  TCS service pit. No
  
  1301   Wednesday, August 03, 2016, 09:45 David WangConditioning StationStandard OperationTM4UC#17Helium pressure test on TM4 HS line at TCS Helium pressure test on TM4 HS line at
TCS  is done.Leak detector 0.0X E-9atm.cc/sec. 
5minutes, 70psi helium.   
  
  1390   Thursday, November 03, 2016, 08:57 David WangConditioning StationStandard OperationTM4 Helium pressure test on TM4 HS line at TCS70 psi helium ,2minutes to  TM4 HS
line. LD base leak rate 0.0xE-9 atm.cc/sec.
No leak.
  