  596   Tuesday, February 11, 2014, 13:56 chad fisherSouth Hot-CellRepairTM2 waterblock cleaning

New cleaning and polishing pads have been inserted onto the hot cell as well as rubber bungs and a new blank off.

The inital waterblock cleaning with the "scotch bright" pads has been completed. See attached pictures...the first picture being before and the second after.

Tommorow the water block will have bungs put in and a leak check to check the block will take place. After that, the new blank off will be installed and tested.

 

Attachment 1: TM2_20140207_2.jpg
TM2_20140207_2.jpg
Attachment 2: TM2_20140211_2.jpg
TM2_20140211_2.jpg
  595   Friday, February 07, 2014, 10:29 chad fisherSouth Hot-CellRepairTM2 TM2 C.B. and circuit D

Containment box has been removed and the blank off from circuit D has been removed for inspection of both the blank off and water block sealing surface.

Attachment 1: TM2_20140207_1.jpg
TM2_20140207_1.jpg
Attachment 2: TM2_20140207_2.jpg
TM2_20140207_2.jpg
  594   Wednesday, February 05, 2014, 14:12 Travis CaveSpent Target VaultStandard Operation  Targets moved from mini storage to F-308s

All targets in the mini storage (4) have been moved from there and placed into the F-308s and those have been moved to the mech services room.

  593   Wednesday, February 05, 2014, 14:05 David WangSouth Hot-CellRepairTM2 Leak check TM2 tube heater (+) water line from inside service cap in TH.

Bevan and I did a leak check on TM2 tube heater+ from inside service cap in TH. The leak detector base leak rate 0.0xE-9 atm.cc/sec, base  pressure 0.0xE-4totrr. One of side panel on service cap was opened. Bevan sprayed the helium to the "D" line inside the blue insulator.The helium flow was checked , and he sprayed twice. No response has been found on leak detector.  See attachment pictures

Attachment 1: 005.JPG
005.JPG
Attachment 2: 008.JPG
008.JPG
Attachment 3: 005.JPG
005.JPG
  592   Tuesday, February 04, 2014, 09:42 David WangSouth Hot-CellRepairTM2 pressure test on TM2 tube heater +(D) water line.

Chad and I did a pressure test on TM2 tube Heater+(D) water line.I pressurized the D line with shop air from quick connectors(both ends) on service cap.chad applied bubble soap onto the D water block in SHC. The test started from 5psi,and increased 5psi each time to 40 psi. From 5 to 35 psi, no bubble has been found on water block. At 40 psi , bubble appeared from blind blank off seal , but not from soldering joints. Since the o-ring seal for the blank off is  vacuum seal , but not for pressurizing, It is understandable the seal could not hold 40 psi pressure air. No bubble had been found on the D water block soldering joints .See attachment pictures.

Attachment 1: 015.JPG
015.JPG
Attachment 2: 016.JPG
016.JPG
Attachment 3: 021.JPG
021.JPG
Attachment 4: 018.JPG
018.JPG
Attachment 5: 017.JPG
017.JPG
Attachment 6: 019.JPG
019.JPG
Attachment 7: 020.JPG
020.JPG
Attachment 8: 029.JPG
029.JPG
Attachment 9: 028.JPG
028.JPG
Attachment 10: 029.JPG
029.JPG
  591   Tuesday, February 04, 2014, 08:04 David WangSouth Hot-CellRepairTM2 Leak check TM2 tube heater (+) water line.

Chad and I leak checked TM2 tube heater(+) water line yesterday afternoon. The water line was difficult to pump down on base leak rate, but LD  base pressure was fine . The base pressure on leak detector was pumped to 0.0XE-4 torr quickly. The base leak rate only could be pumped  to  4.5 xE-8 atm.cc/sec after 1 hour waiting time. All vacuum connections to leak detector  in the target hall were leak checked and they were good. Chad checked helium flow in SHC. He sprayed helium twice on tube heater(+) water block soldering joints. I did not see any response on leak detector in TH.The base Leak rate and base pressure did not move up during the test.  See attachment pictures.

Attachment 1: IMG_0012.JPG
IMG_0012.JPG
Attachment 2: IMG_0013.JPG
IMG_0013.JPG
  590   Monday, February 03, 2014, 14:45 Travis CaveSpent Target VaultStandard Operation  Spent targets to mini storage and the F-308s to the Target Hall

Targets NiO#1(101), Nb#5(85), TaC#1(92), and ZrC#5(81) have been moved from the storage vault and placed in the mini storage. The F-308 flasks have also been moved in to the target hall as well. The attached are the current statuses of both vaults.

Attachment 1: Vault_Storage_February_3_2014.pdf
Vault_Storage_February_3_2014.pdf Vault_Storage_February_3_2014.pdf Vault_Storage_February_3_2014.pdf Vault_Storage_February_3_2014.pdf
Attachment 2: Mini_Vault_Storage_February_3_2014.pdf
Mini_Vault_Storage_February_3_2014.pdf Mini_Vault_Storage_February_3_2014.pdf Mini_Vault_Storage_February_3_2014.pdf Mini_Vault_Storage_February_3_2014.pdf
  589   Thursday, January 30, 2014, 13:46 Travis CaveConditioning StationStandard OperationTM2no targetmodule move

TM#2 has been moved from the conditioning station to the south hot cell.

  588   Wednesday, January 22, 2014, 15:20 Anders MjosSouth Hot-CellStandard Operation UC#8Target Inspection - post beam

The Target Assembly was inspected with Chad, Jens Henning and Anders today.

  • The Target Container was broken.
  • Material was deposited on the Heat Shield around the Target Center Block
  • Material was deposited on the IG-LIS source.
  • Electrical checks to ground (HS)
    • The Extraction Electrode passed the electrical check at 1000V
    • The Exit Electrode (c) held only 40V at 22 kOhm
    • The IG Electrode 1 (f) held 250V at 390 MOhm
    • The IG Electrode 2 (g) held only 40V at 22 kOhm
  • IG 1 and IG 2 both held 250V at 450 MOhm to Exit Electorde (c)
  • No spark marks were observed on the 9-pin connector

See photos of the inspection on DocuShare

  587   Wednesday, January 22, 2014, 15:00 Travis CaveSpent Target VaultStandard Operation UC#8Spent target move

UC#8 has been moved from the south hot cell to the vault storage. It was placed in pail 113 and placed in slot 8A of the vault. The field was 9.2mSv/hr upon removal from the south hot cell.

Attachment 1: Vault_Storage_January_22_2014.pdf
Vault_Storage_January_22_2014.pdf Vault_Storage_January_22_2014.pdf Vault_Storage_January_22_2014.pdf Vault_Storage_January_22_2014.pdf
  586   Wednesday, January 22, 2014, 10:51 David WangITERepair  Removed 4 shielding blocks located on top of preseperator in TH

Travis and I removed 4 shielding blocks located on top of pre-seperator  in TH. This is a job for ITE harp 9 re-installation after it  is repaired . The blocks move are successful.

  585   Tuesday, January 21, 2014, 14:32 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule move

TM#4 has been moved from the south hot cell to the north west silo.

  584   Monday, January 20, 2014, 14:37 Travis CaveITEStandard OperationTM4UC#8module move

TM#4 with UC#8 has been moved from the east target station to the south hot cell.

  583   Monday, January 20, 2014, 13:40 maicodallavalleSpent Target VaultMaintenance F-308Empty F-308s

Four empty F-308s just arrived back at Triumf. I moved them  from shipping to the Remote Handling Shop for service and inspection. I will work on them when not busy with my other shutdown work. ( Cyclotron work)

  582   Monday, January 20, 2014, 13:38 David WangITEStandard OperationTM4 DISCONNECTED TM4 IN ITE.

I DISCONNECTED TM4 IN ITE. ALL WATER LINES HAD BEEN PURGED OUT WITH PRESSURE AIR.

  581   Monday, January 20, 2014, 13:35 David WangITEStandard OperationTM4 5 shielding blocks had been moved out of ITE

5 SHIELDING BLOCKS HAD BEEN MOVED OUT OF ITE.AIR SAMPLE AND SWIPED FIRST BLOCK AND ITE PIT.NOTHING HAD BEEN FOUND ON ALPHA MONITOR AND OTHER TWO MONITORS.

  580   Thursday, January 16, 2014, 10:36 chad fisherSouth Hot-CellRepair  East Manipulator Repair

The repair/cable replacement on the east manipulator is now complete.

Yesterday's initail cable replacement went very well however, due to a minor glich, we were unable to test the tong movement until I was out of the hot cell. Tong did not fully close and felt like there was a "hard stop" at a repeatable spot in the  closing of the tong. Upon further investagation, I determined that the problem was definelty on the slave side.

I conducted a troublshooting exercise this morning to narrow down the problem. I quickly found that the new tong came from the manufacture with two incorrect fasteners (socket head cap screws) instead of set screws. As a result the tong was being kept from closing as the head of the socket head cap screws was interfering.

I replaced the SHCS was the set screws from the old tong. The tong now functions with full range of motion.

Jan. 15, 37 minutes in cell .26 mSv

Jan. 16, 16 minutes in cell (as I did some clean up of compressable waste) .05 mSv

Also, the inital repair utilized a prototype tool I designed (and with assistance from Maico, built). This tool made the repair much easier. I will be making small improvements to the design and issuing drawings to the vault and shop.

 

 

Attachment 1: Manip_repair_20140114.jpg
Manip_repair_20140114.jpg
Attachment 2: Manip_repair_20140115.jpg
Manip_repair_20140115.jpg
  579   Thursday, January 09, 2014, 11:07 chad fisherSouth Hot-CellMaintenance  Field Level

I have managed to reduce the field at the broken manipulator from 12 mSv/h to 400 uSv/h.

  578   Thursday, December 12, 2013, 11:14 Bevan MossConditioning StationStandard OperationTM2 HV Chase Electrical Test

While under vacuum Travis and I completed diagnostics of the HV chase. Majority of the lines showed OL at 1kV but there were the following "failures"

A to P @ 250V 716kOhm
A to Q @ 1kV 25.18MOhm
B to C with ohm meter 8Mohm @250V 830kOhm
B to D @ 1kV 15.57MOhm
C to D @1kV 16.18 MOhm
P to Q @1kV 1.069 GOhm
G to J with ohm meter dead short.

Ideally all of these values would be OL and they may improve or get worse when the source tray is installed depending on where the electrical contact is. I need to discuss with Friedhelm but I believe that as these values the module can still operate. Without changing the HV chase there is very little chance of improving these values.

  577   Monday, December 09, 2013, 14:47 David WangITEStandard OperationTM4 I moved 5 shielding blocks from block storage area to ITE.

I moved 5 shielding blocks to ITE. The ITE is configured to take proton beam.