  727   Thursday, August 07, 2014, 17:07 David WangConditioning StationStandard OperationTM4UCx #10TM4 is connected in CS.

TM4 is connected at CS. All turbo pumps are started. The pumping down is good so far.

  728   Friday, August 08, 2014, 08:47 David WangConditioning StationStandard OperationTM4UCx #10helium pressure test on TM4 HS water line at CS.

Helium pressure test on TM4 HS water line at CS is finished. 80psi helium no leak. 

  729   Monday, August 11, 2014, 10:34 Travis CaveConditioning StationStandard OperationTM4UC#10module move

TM#4 with UC#10 has been moved from the conditioning station to the east target station.

  731   Monday, August 11, 2014, 14:27 David WangConditioning StationStandard OperationTM4 TM4 are vented with argon and disconnected at CS.

TM4 are vented with argon and disconnected at CS this morning.

  738   Thursday, September 04, 2014, 09:45 Travis CaveConditioning StationStandard OperationTM1ZrC#6module move

TM#1 with ZrC#6 has been moved from the south hot cell to the conditioning station.

  740   Thursday, September 04, 2014, 11:19 David WangConditioning StationStandard OperationTM1 TM1 is connected in CS.

TM1 is connected in CS. All turbo pumps are started.

  741   Friday, September 05, 2014, 07:15 David WangConditioning StationStandard OperationTM1 helium pressure test on TM1 HS water line at CS.

Helium pressure test on TM1 HS water line at CS is done. 80psi helium with LD 0.0xE-9 atm.cc/sec. 3 minutes test and no response on LD. The line is leak tight.

  743   Monday, September 08, 2014, 13:44 David WangConditioning StationStandard OperationTM1ZrC#6TM1 is disconnected at CS.

Stopped TM1 and CS turbo pumps. Disconnected TM1 at CS. The CS and TM1 are under vacuum and naturally leak up. I will vent it on Wednesday morning.

  758   Wednesday, October 08, 2014, 09:39 Travis CaveConditioning StationStandard OperationTM3no targetmodule move

TM#3 has been moved from the North West Silo to the conditioning station.

  759   Friday, October 10, 2014, 10:47 David WangConditioning StationDevelopmentTM3 TM3 has been connected in CS

TM3 has been connected in CS. All water supplies are bypassed theTM3 on the top of the service cap. TM3 TP2 was difficult to start. It is started finally after couple of time try.The pump runs fine now. 

  764   Tuesday, October 14, 2014, 17:19 Anders MjosConditioning StationStandard OperationTM3No targetHigh Voltage Conditioning

Wednesday, October 14, 2014

 The BIAS voltage was brought up between 1:30pm and 5pm. Sparks tripped the BIAS power supply at voltages between 20 - 24 kV. Multiple attempts were made. The current was about 50-60 uA.


Wednesday, October 15, 2014

Temperature in the cooling circuit is too hight to do a HV test. The cooling circuit was started, but shuts off after ~10 m


Thursday, October 16, 2014

David and I found that the fans on the cooling unit on the roof did not run and that the compressors get hot and likely trip on over temperature protection (hot to the touch). We found the manual in the control panel of the unit.

10am: HV to 20kV before a spark tripped the PS. Current at 40 uA - resistivity at 11.9 Mohm

5pm: HV to 20kV before fluctuations in current, then a spark tripped the PS. Current around 40 uA. Resistivity 12.6 Mohm


Friday, October 17, 2014

8am: Staging did not start over night. TS5 temp is 31 deg C, which would have tripped power supplies. Reset and enabled staging.
The system increased staging until all 3 compressors were running.
9am: Cooling supply temperature reached ~3 deg C. Disabled staging and switched off all pumps
2pm: Switched off water circulation for the weekend.

 

  766   Thursday, October 16, 2014, 15:40 Anders MjosConditioning StationMaintenance  Chiller unit

NOTE: If there is a problem with the chiller unit (ie Fault 1 or Fault 2), a power cycle may reset the VFDs for the fans and clear the problem. To do so it is necessary to wait long enough for the VFDs to power off completely. The display will first start to flash before going dark. Wait another few seconds before powering the system back up. The chiller unit is located on the ISAC I Penthouse Roof.

A service tech from Daikine was on site today and has cleaned the chiller unit. In the process he also cycled the power which returned the operation back to normal. The tech provided us with manuals for the VFDs. These can be consulted on DocuSharefor looking up error codes.

Fault 1 refers to unit 1 and Fault 2 to unit 2.

  767   Friday, October 17, 2014, 13:36 Anders MjosConditioning StationMaintenance  TCS:Chil staging not operational

NOTE: If cooling is required, the compressors will have to be run manually. Make sure to switch it off again when the water has reached an acceptable temperature.

The staging did not work properly this morning. Dave Morris have been contacted and will look into it.

  768   Monday, October 20, 2014, 08:59 David WangConditioning StationDevelopmentTM3 Started TCS water system.

I started TCS water system this morning to check if the chillers work properly.

  769   Monday, October 20, 2014, 09:13 David WangConditioning StationDevelopmentTM3 TM3 TP2 failed

TM3 TP2 stopped working this morning at 4:00 AM. I tried to start it but failed. On normal start mode , It could not pass 6K RPM. On soft start mode , the pump cant pass 17KRPM. Talked with Anders, We are not going to replace this pump since we are not going to run this module for a while. I will stopped all   vacumm pumps on CS and TM3 this morning.

  773   Wednesday, October 22, 2014, 09:41 David WangConditioning StationDevelopmentTM3 TM3 has been disconnected at CS.

TM3 has been disconnected at CS. It is vented and ready to move.

  774   Wednesday, October 22, 2014, 13:05 Anders MjosConditioning StationMaintenance  Controls upgrade on TCS

 See work permit for details

  781   Wednesday, November 05, 2014, 14:21 Anders MjosConditioning StationDevelopment  Jumper installed on TGHT, TBHT and COIL

 A copper bar jumper (ITD0488) was installed on the TGHT, TBHT and COIL conductors on the taregt hall side for TCS testing.

  784   Thursday, November 06, 2014, 13:43 David WangConditioning StationDevelopmentTM3 CS vacuum system has been connected to TM3.

CS  vacuum system has been connected to TM3 for control system test(Dave.Morris).

  788   Monday, November 17, 2014, 11:38 Travis CaveConditioning StationStandard OperationTM3no targetmodule move

TM#3 with no target has been moved from the conditioning station to the north west silo.