1268
|
Monday, June 27, 2016, 13:45 |
David Wang | ITE | Standard Operation | | | 5 Shielding blocks have been transferred from ITW to ITE. | ITE is configured to take proton beam. |
|
1269
|
Tuesday, June 28, 2016, 14:42 |
Travis Cave | Spent Target Vault | Standard Operation | | Many | Spent target assay. | The spent target assay were finally started
or re-started today. Four targets were done
today. |
|
1270
|
Thursday, June 30, 2016, 13:33 |
Dan McDonald | Spent Target Vault | Maintenance | | | F308's | The five spent target F308 flasks
where gone through in accordance with Nordion
guidelines, the sixth spare is remains in |
|
1272
|
Wednesday, July 06, 2016, 07:06 |
David Wang | Conditioning Station | Standard Operation | | | venting TCS with argon. | I switched off the vacuum pumps and vented
TCS with argon. The TCS will be ready to
accept TM2 this afternoon. |
|
1279
|
Friday, July 08, 2016, 16:56 |
Anders Mjos | Conditioning Station | Repair | | | VFD21 OL1 fault on Chiller | Plant Services group (Tony) will contact
a service tech on Monday.
Water system will be switched off |
|
1280
|
Monday, July 11, 2016, 10:59 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#48 | Spent Target move | The spent Ta#48 was moved from the south
hot cell to the spent target vault. I was
placed in pail 139 and is in spot 6C in the |
|
1283
|
Tuesday, July 12, 2016, 12:42 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule for beam schedule 130 (Apr- Sep) | Update schedule weekly.Attachment 1,2 |
|
1286
|
Thursday, July 14, 2016, 13:25 |
Anders Mjos | Conditioning Station | Repair | | | VFD21 OL1 fault on Chiller |
|
|
1292
|
Tuesday, July 26, 2016, 11:22 |
chad fisher | South Hot-Cell | Maintenance | | | Soth Hot Cell Waste Storage Vault Tunnel | The two 45 gal (m) drums of waste removed
from the south hot cell in December 2015
and January 2016 were transferred from the |
|
1294
|
Friday, July 29, 2016, 14:27 |
Isaac Earle | North Hot-Cell | Development | | | North Hot Cell Measurements & Cleanup | The North
Hot Cell was accessed today via the Ante |
|
1300
|
Wednesday, August 03, 2016, 09:15 |
chad fisher | South Hot-Cell | Repair | | | Manipulator | East manipulator on the south hot cell
is showing signs of eminent wrist/tong cable
failure. Some slight slippage was noted yesterday |
|
1303
|
Wednesday, August 03, 2016, 09:56 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule for beam schedule 130 (Apr- Oct, 2016) | Update schedule weekly. See attachments
1,2 |
|
1305
|
Thursday, August 04, 2016, 08:56 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#16 | Spent Target move | The spent UC #16 have been moved from the
south hot cell to the storage vault see attached
PDF for details. |
|
1306
|
Friday, August 05, 2016, 13:50 |
chad fisher | South Hot-Cell | Maintenance | | | Anteroom clean out | Some items have been removed from the anteroom
in preparation for painting. Items have been
placed on plastic in the south hot cell service |
|
1307
|
Friday, August 05, 2016, 14:13 |
Isaac Earle | North Hot-Cell | Development | | | Preparations for NHC Ventilation Test | A hole was drilled in the NHC exhaust duct
in the east end of the target hall above
the hatch to the Ante Room. This will |
|
1308
|
Monday, August 08, 2016, 11:24 |
chad fisher | South Hot-Cell | Maintenance | | | Anteroom Clean-up - Waveguide | The wave guide from TM3 has been surveyed,
swiped and removed from the anteroom and
transported to rad waste for disposal. The |
|
1311
|
Tuesday, August 09, 2016, 11:36 |
Anders Mjos | Conditioning Station | Maintenance | | | RGA and CG1S moved | The locations (ports) for the RGA
and CG1S was swapped today by Anders and
Isaac to provide clearance for the North |
|
1314
|
Wednesday, August 10, 2016, 12:18 |
chad fisher | South Hot-Cell | Maintenance | | | Anteroom clearing | Black "radio active" materials
cabinet has been emptied, items bagged and
removed from the anteroom. Cabinet itself |
|
1315
|
Wednesday, August 10, 2016, 14:38 |
Isaac Earle | North Hot-Cell | Development | | | North Hot Cell Ventilation Test Results | Testing was performed on August 9th on
the ISAC nuclear ventilation system to determine
if the existing ventilation system can achieve |
|
1317
|
Friday, August 12, 2016, 09:58 |
chad fisher | South Hot-Cell | Maintenance | | | Manipulator Maitenance | Disassembled the master side of the right
manipulator this morning to check the wrist
cable. The cable on the master side shows |
|