  1201   Friday, April 08, 2016, 08:48 David WangITWStandard Operation  ITW water signal interlock check.I did a ITW water signals interlock check
with ISAC opp. They are checked once a year
before first beam on.
  
  1202   Friday, April 08, 2016, 13:16 David WangConditioning StationStandard Operation  2016 Winter Shut Down Target Hall ScheduleUpdate schedule weekly .see attachment
1,2
 2016_winter_shut_down__target_hall_schedule.mpp2016_winter_shut_down__target_hall_schedule.pdf 
  1204   Monday, April 11, 2016, 10:07 Travis CaveSpent Target VaultStandard Operation UC#14Spent Target moveThe spent UC#14 target has been moved into
the ISAC spent target vault. See the attached
PDF for the details.
 Vault_Storage_April_11_2016.pdf 
  1215   Monday, April 25, 2016, 12:18 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Sep)Post MS project and Excel   
target hall schedule for beam schedule 130
see attachments 1,2
 7x 
  1221   Wednesday, May 04, 2016, 11:14 Isaac EarleNorth Hot-CellDevelopment  North Hot Cell Scope DecisionA meeting was held on May 4, 2016 to determine
the scope of the North Hot Cell project.
 The following was agreed upon by those
  
  1222   Wednesday, May 04, 2016, 12:01 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Sep)Update schedule weekly. See attachment
1,2,3.
 Target_Hall_shedule_130_Apr_to_Sep_2016.pdfTarget_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf 
  1233   Monday, May 16, 2016, 10:48 Anders MjosConditioning StationMaintenance  Topped up water in TCS:TK2 Filled from 15 to 25 in   
  1244   Tuesday, May 24, 2016, 10:52 Travis CaveSpent Target VaultStandard Operation UC#15Spent Target moveSpent UC#15 has been moved from the south
hot cell to the spent target storage. It
was placed in pail number 136, and placed
 Vault_Storage_May_24_2016.pdf 
  1262   Thursday, June 09, 2016, 10:04 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Sep)Weekly update .  Target_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf 
  1266   Wednesday, June 15, 2016, 09:39 Travis CaveSpent Target VaultStandard Operation Ta#47Spent Target moveThe spent Ta#47 target has been moved from
the south hot cell to the spent target vault.
It was placed in pail #137 in spot 4C of
 Vault_Storage_June_15_2016.pdf 
  1267   Tuesday, June 21, 2016, 13:47 Travis Cave/ Dan McDonaldSpent Target VaultRepair  Spent Target Vault DoorThe spent target vault door does not open
or close. The emergency door closing did
have to be used to close the door as it was
  
  1268   Monday, June 27, 2016, 13:45 David WangITEStandard Operation  5 Shielding blocks have been transferred from ITW to ITE.ITE is configured to take proton beam.   
  1269   Tuesday, June 28, 2016, 14:42 Travis CaveSpent Target VaultStandard Operation ManySpent target assay.The spent target assay were finally started
or re-started today. Four targets were done
today.
 Vault_Storage_June_30_2016.pdfMini_Vault_Storage_June_30_2015.pdf 
  1270   Thursday, June 30, 2016, 13:33 Dan McDonaldSpent Target VaultMaintenance  F308'sThe five spent target F308  flasks
where gone through in accordance with Nordion
guidelines, the sixth spare is remains in
  
  1272   Wednesday, July 06, 2016, 07:06 David WangConditioning StationStandard Operation  venting TCS with argon.I switched off the vacuum pumps and vented
TCS with argon. The TCS will be ready to
accept TM2 this afternoon.
  
  1279   Friday, July 08, 2016, 16:56 Anders MjosConditioning StationRepair  VFD21 OL1 fault on ChillerPlant Services group (Tony) will contact
a service tech on Monday.
Water system will be switched off
  
  1280   Monday, July 11, 2016, 10:59 Travis CaveSpent Target VaultStandard Operation Ta#48Spent Target moveThe spent Ta#48 was moved from the south
hot cell to the spent target vault. I was
placed in pail 139 and is in spot 6C in the
 Vault_Storage_July_11_2016.pdf 
  1283   Tuesday, July 12, 2016, 12:42 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Sep)Update schedule weekly.Attachment 1,2  Target_Hall_shedule_130_Apr_to_Sep.pdfTarget_Hall_shedule_130_Apr_to_Sep.mpp 
  1286   Thursday, July 14, 2016, 13:25 Anders MjosConditioning StationRepair  VFD21 OL1 fault on Chiller

    

       
            
  
  1292   Tuesday, July 26, 2016, 11:22 chad fisherSouth Hot-CellMaintenance  Soth Hot Cell Waste Storage Vault TunnelThe two 45 gal (m) drums of waste removed
from the south hot cell in December 2015
and January 2016 were transferred from the
  