ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
542
|
Wednesday, November 13, 2013, 10:01 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 leak check at conditioning station | I leak checked TM2 at conditioning station
this morning. All air to vacuum seals on
the top of the module are good. All water |
|
544
|
Friday, November 15, 2013, 16:48 |
Bevan Moss | Conditioning Station | Standard Operation | TM2 | | HV Testing | High voltage testing was started
on TM2 with no source tray today. The maximum
stable for 1 minute voltage reached was 47.5kV |
|
545
|
Monday, November 18, 2013, 11:54 |
Bevan Moss | Conditioning Station | Repair | TM2 | | Fault on TCS Chill | This morning when I went to start
HV conditioning CP2 and CP3 both had faults
and the temperature of the water was ~27C. |
|
546
|
Monday, November 18, 2013, 16:42 |
Bevan Moss | Conditioning Station | Standard Operation | TM2 | | HV Testing | The Glory of TM2 continues 100V at
a time. Today I brought the module to 46kV
and left it there for 1 hour. During this |
|
547
|
Monday, November 18, 2013, 16:44 |
Bevan Moss | Conditioning Station | Standard Operation | | | Testing of cooling package | I have tested all of the compressors
for TCS. All are operational and cycled as
they should. |
|
550
|
Tuesday, November 19, 2013, 16:55 |
Bevan Moss | Conditioning Station | Standard Operation | TM2 | | HV conditioning | HV conditioning of TM2 continued
today. At ~53.5kV the module started to spark
externally to the HV cover. This is the first |
|
553
|
Wednesday, November 20, 2013, 13:52 |
Bevan Moss | Conditioning Station | Standard Operation | TM2 | | HV testing of TM2 | HV testing without the cover continued
today. With the EINZEL lens at 30kV the target
module was able to achieve 58.7kV. At this |
|
565
|
Tuesday, December 03, 2013, 14:14 |
Bevan Moss | Conditioning Station | Standard Operation | TM2 | | HV conditioning | It was attempted to HV condition
TM2 to 55kV and leave it operating there
for an hour to demonstrate stability. Unfortunately |
|
575
|
Friday, December 06, 2013, 15:09 |
Bevan Moss | Conditioning Station | Standard Operation | TM2 | | TM2 no source tray 55kV 1 hour | Today 55kV was applied to TM2 and held
for over 1 hour with the EINZEL at 27.5kV.
There were 2 sparks and the current was unstable |
|
578
|
Thursday, December 12, 2013, 11:14 |
Bevan Moss | Conditioning Station | Standard Operation | TM2 | | HV Chase Electrical Test | While under vacuum Travis and I completed
diagnostics of the HV chase. Majority of
the lines showed OL at 1kV but there were |
|
589
|
Thursday, January 30, 2014, 13:46 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module move | TM#2 has been moved from the conditioning
station to the south hot cell. |
|
601
|
Monday, February 17, 2014, 09:32 |
David Wang | Conditioning Station | Repair | TM2 | | helium pressure test on TM2 tube heater +(D) water line. | I did the helium pressure test on Tube
heater+ line this morning. The vacuum on
CS and TM2 are very good. The base lake rate |
6x |
602
|
Tuesday, February 18, 2014, 11:26 |
David Wang | Conditioning Station | Repair | TM2 | | I stopped turbo pumps and disconnected vacuum system on TM 2 and CS | I stopped turbo pumps and disconnected
vacuum system on TM2 and CS. The TM2 will
be moved to SHC for C seal installation on |
|
603
|
Thursday, February 20, 2014, 09:45 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module move | TM#2 has been moved from the conditioning
station to the south hot cell. |
|
609
|
Tuesday, February 25, 2014, 10:00 |
David Wang | Conditioning Station | Repair | TM2 | | helium pressure test on TM2 tube heater (+) water line with blank off(C-seal) installed on WB. | I did the helium pressure test
on TM2 tube heater (+) water line with
blank off(C-seal) installed on water |
10x |
611
|
Wednesday, March 05, 2014, 10:07 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module move | TM#2 with no target or source tray has
been moved from the conditioning station
to the north east silo. TM#1 with no target |
|
612
|
Thursday, March 06, 2014, 06:28 |
David Wang | Conditioning Station | Maintenance | TM1 | | TM1 had been moved from silo to CS | TM1 has been successfully moved from silo
to CS. The CS vacuum system is connected
to TM1. Turbo pumps on TM1 and CS have been |
|
614
|
Thursday, March 06, 2014, 12:59 |
David Wang | Conditioning Station | Maintenance | TM1 | | Restart TM1 and CS TPs | Restarted TM1 and CS turbo pumps after
the power off. Everything is fine . |
|
615
|
Thursday, March 06, 2014, 14:12 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 air to vacuum and water lines leak check at CS. | TM1 air to vacuum and water lines leak
check at CS are finished this afternoon.
The leak detector is hooked directly |
8x |
627
|
Thursday, March 20, 2014, 08:19 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | module move | TM#1 with no target moved from the conditioning
station to north west silo. |
|