Entry  Monday, April 14, 2014, 11:57, Travis Cave, ITE, Standard Operation, , , entrance module move 
The East Entrance module has been moved from the south west silo to the east target station. The move went well.
Entry  Friday, April 11, 2014, 18:17, Keith C Ng, ITE, Repair, , , 2a3 window - install 
Today:
1) Installed new cradle and shortened beam pipe section in wall penetration.
- Removed tank dust cover from flange and cleaned
Entry  Friday, April 11, 2014, 11:35, David Wang, Conditioning Station, Standard Operation, TM3, , Helium pressure test on TM3 HS water line with new Ta target. at CS 6x
The helium pressure test on TM3 HS water line with new Ta target is finished at CS. The circuit is leak tight.. No any response on LD. See pictures.
Entry  Thursday, April 10, 2014, 14:03, Bevan Moss, Conditioning Station, Standard Operation, TM3, TiC#4, HV conditioning 10042014_Tm3_TiC#4_HV_conditioning.JPG10042014_TM3_TiC#4_HV_conditioning.txt
 The TiC#4 target that is on TM3 was conditioned to 25kV today with the EINZEL lens at 12.5kV. There was one spark shortly after reaching 25kV that
reset the bias PS and another one  after the module sat at 25kV for ~30 minutes. Attached is the strip tool data and screen shot. Prior to starting
the conditioning the power on the chiller needed to by cycled as the VFD on the fans had tripped due to a recurring inrush problem.
Entry  Wednesday, April 09, 2014, 11:10, David Wang, South Hot-Cell, Standard Operation, TM3, , TM3 heat shield circuit leack check at SHC 
This Monday morning, Chad and I leak checked heat shielding circuit on TM3 with new target installed. The base LR on LD :0.0xE-9 atm.cc/sec, base pressure
0.0xE-4 torr. Chad sprayed helium twice on the VCR joints. No leak has been found. The circuit will be pressured with helium at CS.
Entry  Tuesday, April 08, 2014, 09:05, Travis Cave, South Hot-Cell, Standard Operation, TM3, TiC#4, module move 
TM#3 with TiC#4 has been moved from the south hot cell to the conditioning station.
Entry  Monday, April 07, 2014, 14:13, chad fisher, South Hot-Cell, Standard Operation, TM3, TiC#4, TiC#4 installation 
TiC#4 has been installed onto TM3
Entry  Monday, April 07, 2014, 11:49, Travis Cave, South Hot-Cell, Standard Operation, TM3, TiC#4, Electrical check TM#3_elec_test_TiC#4_surf.PDF
Electrical test of TM#3 with TiC#4 attached. See PDF.
Entry  Monday, April 07, 2014, 10:48, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Electrical check TM#3_elec_test_no_target.PDF
TM#3 electrical check at the south hot  cell with no target to give us a base line and show that things are ok with the module for the start of
the running year.
Entry  Friday, April 04, 2014, 14:59, Keith C Ng, ITE, Maintenance, , , measurement of new beam tube section wall_to_flange_length.pdf
R. Kuramoto and A. Laxdal measured the distance from the 2A tunnel to the tank flange of ITE. The new fabricated beam pipe with bellows was used to gauge
the distance to the tank flange; The flange face of the beam tube was butted up to the tank flange and the beam tube was marked at the plane of the wall.
A metal rod was used to gauge the distance to the tank face using the same method.
Entry  Friday, April 04, 2014, 14:16, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, module move 
TM#3 with no target has been moved from the south west silo to the south hot cell.
Entry  Wednesday, April 02, 2014, 09:14, Travis Cave, ITW, Standard Operation, TM4, Ta#42, module move 
TM#4 with Ta#42 has been moved to the west target station.
Entry  Monday, March 31, 2014, 13:22, Bevan Moss, Conditioning Station, Standard Operation, TM4, Ta #42, HV conditioning 31032014_TM4_Ta#42_HV_Conditioning.txt31032014_Ta#42_HV_conditioning.JPG
 TM4 with Ta#42 was HV conditioned to 35kV with the optics tray at 17.5kV. There was some vacuum response while ramping but well within normal.
Attached is a screen shot and the associated data.
Entry  Thursday, March 27, 2014, 10:47, Travis Cave, Conditioning Station, Standard Operation, TM4, Ta#42, Electrical check TM#4_Ta42surf_electest_CS.PDF
TM#4 with Ta#42 in the conditioning station under vacuum electrical check.
Entry  Wednesday, March 26, 2014, 08:36, Travis Cave, Conditioning Station, Standard Operation, TM4, Ta#42, module move 
TM#4 with Ta#42 has been moved from the south hot cell to the conditioning station.
Entry  Wednesday, March 26, 2014, 06:57, David Wang, South Hot-Cell, Standard Operation, TM4, Ta#42, Leak check on TM4 HS water line with new Ta #42 target. 
Chad and I leak checked TM4 HS line with Ta#42 target on the module. The leak detector base LR 0.0xE-9 atm.cc/sec, base pressure0.0xE-4 torr. Chad applied
helium to the joints, and flushed the helium around the target. No leak has been found.I will do helium pressure test on this circuit at CS later.
Entry  Tuesday, March 25, 2014, 13:29, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#42, Electrical check TM#4_notarget_electest_SHC.PDFTM#4_Ta42surf_electest_SHC.PDF
TM#4 was checked electrically with and without target on it, see attached PDFs for details.
Entry  Tuesday, March 25, 2014, 09:11, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#42, Ta#42 install and "new" 9 pin TM4_20140325_01.jpg
Ta#42 has been installed onto TM4. The "new" 9 pin connector was not an issue...attually went on better than any other previous one. Leaving
the mounting screws loose on the target half allowed use of the manipulator to center the pins and insert them with ease.
Entry  Monday, March 24, 2014, 12:01, Travis Cave, ITW, Standard Operation, TM4, no target, module move 
TM#4 has been moved from the west target station to the south hot cell.
Entry  Friday, March 21, 2014, 16:49, Keith C Ng, ITE, Repair, , , 2a3 window - tank flange inspection 20140321_2a3window_RHB_6777.JPG20140321_2a3window_P1030055.JPG20140321_2a3window_P1030057.JPG20140321_2a3window_IMG_0846.JPG
Today:
1) Cleaned flange with methanol and cotton glove, appears to be clean.