1481
|
Thursday, April 06, 2017, 12:33 |
David Wang | Conditioning Station | Repair | TM1 | | TM1 rust inpsection and removal | TM1 inside service cap surface and shielding
plug surface are visually inspected yesterday.
No rust has been found. I cleaned all rust |
|
|
1482
|
Thursday, April 06, 2017, 15:11 |
Grant Minor | Crane | Maintenance | | | Target Hall Crane 20 ton hoist - Report by Gordon Crane 5-Apr-2017 |
v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}
|
|
|
1483
|
Thursday, April 06, 2017, 15:16 |
Anders Mjos | Conditioning Station | Maintenance | | | Installation of new break out box to accommodate both ITM:MP2 and TCS:MP1 | Installation by Marshall. Dave M from controls
adjusted circuitry to get TCS:MP1 to start.
Work is being done in preparation |
|
|
1488
|
Tuesday, April 11, 2017, 14:06 |
David Wang | Conditioning Station | Standard Operation | TM4 | | SHC, TM2 leak check on HS line. | Chad and I did leak check on TM1 HS line
at SHC. 0.0XE-9 atm.cc/sec. No leak. |
|
|
1489
|
Wednesday, April 12, 2017, 07:26 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 and TCS vacuum system has been connected. | Roughing down overnight. Turbo pumps are
started this morning. Everything looks good
so far. |
|
|
1491
|
Wednesday, April 12, 2017, 12:51 |
David Wang | South Hot-Cell | Repair | TM3 | | TM3 Ram readings @ SHC | We have a ram installed on SHC pole
which is 0.5 meter to module shielding
block surface. the readings we got today |
|
|
1494
|
Thursday, April 13, 2017, 10:32 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 Lower Service Tray Video Inspection | A video inspection of the lower service
tray was performed this morning. Camera was
inserted upwards into the service tray/service |
|
|
1495
|
Thursday, April 13, 2017, 11:33 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Helium pressure test on TM2 water llines at TCS. | LD BLR :0.0 X E-9 atm.cc/sec. BP:0.0XE-4
torr. helium 70 psi. 3 minutes on each circuit
|
|
|
1497
|
Thursday, April 13, 2017, 14:16 |
David Wang | Crane | Repair | | | TH crane: east side main hoist brake assembly is replaced. | Gordon Crane technician Tom Kauss finished
the replacement of the east side main hoist
brake assembly. A new set up is installed. |
|
|
1498
|
Wednesday, April 19, 2017, 08:29 |
David Wang | Conditioning Station | Standard Operation | | | TH schedule 132 update in first beam week | Update schedule to show job process in
TH. See attachment 1,2. |
 |
|
1499
|
Friday, April 21, 2017, 08:19 |
David Wang | Conditioning Station | Repair | | | Low frequency on TCS TGHT flow sensor. | Anders and I found a low frequency issue(13hz
only) on TCS TGHT flow sensor when doing
TM4 conditioning. By trouble shooting, We |
  |
|
1500
|
Monday, April 24, 2017, 09:52 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Switch off TCS water system and vacuums | The TCS bias was turn off before that.
The TM2 and TCS are still under vacuum now. |
|
|
1501
|
Monday, April 24, 2017, 16:06 |
David Wang | South Hot-Cell | Repair | TM2 | | Crane main hoist strane noise when lifting up TM2 | When lifting up TM2 (20000lbs) this
afternoon, TH crane has a strange noise on
main hoist. The module was lift up less than |
|
|
1502
|
Monday, April 24, 2017, 16:11 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS TP1s is restarted. | TCS IG1S is switched on as well.
The reason to start the pump is to prepare
a possible extended TM2 conditioning at TCS |
|
|
1503
|
Tuesday, April 25, 2017, 19:35 |
Grant Minor | Crane | Repair | | | ISAC Target Hall Crane - West Hoist Brake Rattle |
Normal
0
false
false
false
|
|
|
1504
|
Wednesday, April 26, 2017, 08:28 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 progress and manipulators | containment box was re-installed onto TM3
on Monday, Left manipulator may be showing
signs of eminent handle or tong cable failure. |
|
|
1505
|
Wednesday, April 26, 2017, 10:24 |
David Wang | ITW | Standard Operation | TM2 | | TM2 ITW | TM2 was moved and connected in ITW yesterday
afternoon. After roughing down, ITW turbo
pumps are started. ITW TP4 can not be started |
|
|
1507
|
Wednesday, April 26, 2017, 13:35 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 containment box removed | the containment box has been removed from
TM3. |
|
|
1508
|
Wednesday, April 26, 2017, 16:52 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | | TM3 Lower Service Tray Video Inspection |
|
|
|
1511
|
Thursday, April 27, 2017, 16:58 |
Isaac Earle | North Hot-Cell | Development | | | Right side NHC manipulator installed | Installation of the NHC right side
manipulator was completed yesterday. The
three piece manipulator was assembled in |
    |