957
|
Tuesday, June 23, 2015, 10:55 |
chad fisher | South Hot-Cell | Repair | | | Left Manipulator Repair | The master wrist/tong cable has been replaced
on the left manipulator. Everything appears
to function well so far. |
|
959
|
Tuesday, June 23, 2015, 16:49 |
Anders Mjos | Conditioning Station | Development | | | TCS is beeing migrated to ISAC | by controls group (Dave Morris).
Friday, June 26, 2015
TCS has been migrated to ISAC controls. |
|
968
|
Tuesday, June 30, 2015, 09:47 |
chad fisher | South Hot-Cell | Repair | | | manipulator repair | The right hand manipulator has been repaired.
It took 43 minutes and I received ~ 0.56
mSv |
|
975
|
Thursday, July 02, 2015, 11:51 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#12 | Spent target moved | UC#12 has been moved from the south hot
cell and placed into storage. It is in pail
#125 and in spot 1C of the vault it had a |
|
977
|
Friday, July 03, 2015, 09:27 |
Anders Mjos | Conditioning Station | Development | | | Controls working on access control in EPICS | Some reboots will be done. |
|
981
|
Tuesday, July 07, 2015, 10:50 |
Anders Mjos | Conditioning Station | Development | | | EPICS migration update - archiver |
The archiver is now merged with
ISAC - data available under Utilities
- Archiver Retrieval
Old |
|
982
|
Tuesday, July 07, 2015, 12:12 |
David Wang | Conditioning Station | Repair | | | CS TP1S replacement | CS TP1S had been replaced with a new TP-301
pump this morning.The old pump was broken
last week. |
|
999
|
Thursday, July 16, 2015, 07:38 |
David Wang | ITE | Standard Operation | | | Target Hall Scheduled Activities April 07 - August 07 2015 | Update the TH schedule according to present
TM2 refurbishment process. See attachments
1,2 |
   |
1006
|
Tuesday, July 21, 2015, 12:29 |
David Wang | ITE | Maintenance | | | target pit Hepa filter | Target pit Hepa filter has been replaced
today. There is 500 counts on swipe which
is taken inside of the replaced filter. The |
|
1007
|
Tuesday, July 21, 2015, 12:38 |
David Wang | ITW | Repair | | | ITW external water leak on dump circuit has been fixed. | The leaking 1/8 NPT(M)-1/4NPT(F) adapter
on the ITW dump circuit is replaced. |
|
1010
|
Thursday, July 23, 2015, 10:23 |
David Wang | ITE | Standard Operation | | | Target Hall Scheduled Activities April 07 - August 019 2015 | Update Target Hall schedule after the changing
on TM2 process. See attachment 1,2 |
 |
1011
|
Friday, July 24, 2015, 10:04 |
David Wang | ITE | Standard Operation | | | 5 Shielding blocks have been moved from ITE to block storage area. | Dan and I moved 5 shielding blocks from
ITE to block storage area. The move is smooth. |
|
1017
|
Monday, July 27, 2015, 15:46 |
David Wang | South Hot-Cell | Standard Operation | | | The yellow steel plug is put on SHC in TH | The yellow steel plug is put on SHC in
TH. The spent target is inside the SHC.The
field around the SHC area in TH is so high |
|
1020
|
Tuesday, July 28, 2015, 10:17 |
David Wang | ITE | Repair | | | ITE TP4 has been replaced | Tony and I replaced the ITE TP4 turbo pump
today. The pumping time on controller has
been reset to 0. The replaced broken |
|
1027
|
Thursday, July 30, 2015, 14:05 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#31 | Spent target moved | SiC#31 has been moved to the spent target
vault. It is in pail #127 and placed in spot
3C of the vault is was 489mSv/hr when removed |
|
1028
|
Friday, July 31, 2015, 09:47 |
David Wang | ITE | Standard Operation | | | Target Hall Scheduled Activities April 07 - August 019 2015 | Weekly update of Target Hall schedule after
so many jobs have been finished in this week.
See attachment 1, 2 |
 |
1029
|
Thursday, August 06, 2015, 10:26 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target Measurments and Assays | All targets but one ( SiC#31 went in last
week) have been measured or assayed. See
attached PDF for the details. |
|
1031
|
Friday, August 07, 2015, 10:01 |
David Wang | ITE | Standard Operation | | | Target Hall Scheduled Activities April 07 - August 19 2015 | Weekly update target hall schedule and
activities. See attachment 1,2
Update and extend Target Hall schedule |
   |
1048
|
Wednesday, August 26, 2015, 09:54 |
Anders Mjos | Conditioning Station | Maintenance | | | Topped up water in TCS:TK2 | Filled to 24.9 in |
|
1061
|
Tuesday, September 01, 2015, 16:55 |
Anders Mjos | Conditioning Station | Maintenance | | | TBHT power supply remvoed | The power supply is needed as a spare
for the failed TGHT p/s in ITW |
|