676
|
Tuesday, June 03, 2014, 09:12 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC9# | TM1 HS line helium pressure test and TM1 electrical check at CS |
TM1 HS line helium pressure test and TM1 electrical check at CS under vacuum are finished. Everything is good. See attachment |
Attachment 1: 001.JPG
|
|
Attachment 2: 002.JPG
|
|
Attachment 3: 003.JPG
|
|
Attachment 4: 004.JPG
|
|
Attachment 5: 005.JPG
|
|
Attachment 6: 006.JPG
|
|
Attachment 7: TM1_UC9#_E-check_at_CS.pdf
|
|
675
|
Monday, June 02, 2014, 15:40 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and CS turbo pumps have been started |
TM1 and CS turbo pumps have been started. The vacuum readings are fine on all gauges. |
674
|
Monday, June 02, 2014, 13:53 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UC#9 | module move |
TM#1 with UC#9 has been moved from the south hot cell to the conditioning station. |
673
|
Monday, June 02, 2014, 11:59 |
David Wang | South Hot-Cell | Standard Operation | TM1 | | Leak check on TM1 HS water line with new UC9# target installed |
Chad and I leak checked TM1 HS and UC9# VCR fittings. No response had been found on leak detector during the test. I will do helium pressure test on it at CS later. |
672
|
Monday, June 02, 2014, 11:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | Electrical check |
TM#1 with UC#9 electrical check see attached pdf for details. |
Attachment 1: TM1_UC9_elec_chk_SHC.PDF
|
|
671
|
Monday, June 02, 2014, 11:25 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx #9 | UCx #9 Installed |
UCx #9 has been installed. |
670
|
Monday, June 02, 2014, 10:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move |
TM#1 with no target has been moved from the north west silo to the south hot cell. |
669
|
Friday, May 30, 2014, 09:41 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#42 | Spent target move |
Ta#42 in pail #114 has been moved from the south hot cell to the spent target storage vault and place in spot 7B. The target was 277mSv/hr upon removal from the south hot cell. See attached PDF of vault status. |
Attachment 1: Vault_Storage_May_30_2014.pdf
|
|
668
|
Wednesday, May 28, 2014, 08:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move |
TM#4 with no target has been moved from the south hot cell to the south west silo. |
667
|
Tuesday, May 27, 2014, 11:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#42 | Electrical check |
TM#4 electrical check with Ta#42 attached post beam at the south hot cell. |
Attachment 1: TM4_Ta42_elec_chk_SHC_postbeam.PDF
|
|
666
|
Tuesday, May 27, 2014, 10:42 |
Travis Cave | ITW | Standard Operation | TM4 | Ta#42 | module move |
TM#4 with Ta#42 has been moved from the west target station to the south hot cell. |
665
|
Tuesday, May 27, 2014, 09:42 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 Maintenance |
All of the serviced F-308's have been moved to the South Hot cell area. |
664
|
Tuesday, May 27, 2014, 09:38 |
maicodallavalle | Spent Target Vault | Maintenance | | F-308 Maintenance | F-308 Maintenance |
All the F-308's can back from being certified at Nordion. All of the F-308's have been serviced and are ready to be filled with spent targets. |
663
|
Wednesday, May 21, 2014, 13:56 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target assay |
All targets in the vault have been assayed and measured. Results will be posted soon.
Results of assay are now attached in a new layout. |
Attachment 1: Vault_Storage_May_22_2014.pdf
|
|
662
|
Wednesday, May 21, 2014, 13:56 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target assay |
All targets in the vault have been assayed and measured. Results will be posted soon. |
661
|
Thursday, May 15, 2014, 14:38 |
David Wang | ITE | Repair | TM3 | TM3 | Bias short on ITE |
Anders and I opened the HV cover in ITE and did a visual check inside ITE HV cover and top of TM3.Bill was with us and took the pictures. There was nothing obviously wrong when we opened the HV cover in ITE. We disconnected TM3 high current cables from ITE. Then we did an electrical check on TM3.The TM3 was good and passed megga test (465Mohm at 500V). The module was good and was separated electrically from the ITE at that moment. Then, we went back to electrical room and measured the resistance between bias and ground with ground bar opened and power supply disconnect. It was still shorted at that moment .We thought the short is located inside HV chase between electrical room and ITE. Then, we went back to ITE again and reconnected TM3 back to ITE. We wiped two blue nylon insulators between bias and ground, and no obviously spark track or dirty on them. We put HV cover back in ITE locked area, and went back to electrical room again.We decided to do a final electrical check there. We thought the short should be still there and we just want to confirm it . But this time the short is gone. Everything goes back to normal. The short disappeared and We test bias to 5KV and the current looks normal now. |
660
|
Wednesday, May 14, 2014, 19:01 |
Grant Minor | ITE | Maintenance | TM3 | | HV short inspection at ITE |
Friedhelm Ames commented to me that there appears to be a short between High Voltage and Ground at TM3 at ITE.
Friedhelm, Anders and I initiated a survey by Andrew from RPG, and entered the Target Hall at approximately 5pm to visually assess the HV cover at the MAA. There was no clear indication of a problem. We opted to wait for David to return as we weren't sure exactly what we were looking for.
Friedhelm and Anders confirmed in the Electrical Room that the short is in the Target Hall. |
659
|
Wednesday, May 07, 2014, 10:15 |
David Wang | ITE | Repair | TM3 | | ITE TM3, entrance module and BL2A3 window flange seals leak check.. |
ITE TM3, entrance module, and 2A3 window flange seals have been leak checked this morning after 2 new seals replacement.The LD base leak rate was 0.0xE-9 atm.cc/sec, base pressure was 0.0 XE-4 Torr. I sprayed lots helium around the TM3, entrance module and 2A3 flange seals. No any response had been found on LD during the spraying. All three flanges are sealed perfectly now. |
658
|
Wednesday, May 07, 2014, 10:08 |
David Wang | ITE | Repair | TM3 | | ITE entrance module flange seal had been replaced. |
ITE entrance module flange seal had been replaced yesterday.The flange and the seal groove were cleaned with Acetone before the new seal is installed. See pictures |
Attachment 1: 001.JPG
|
|
Attachment 2: 002.JPG
|
|
Attachment 3: 003.JPG
|
|
Attachment 4: 004.JPG
|
|
Attachment 5: 005.JPG
|
|
Attachment 6: 006.JPG
|
|
Attachment 7: 007.JPG
|
|
657
|
Tuesday, May 06, 2014, 14:05 |
Travis Cave | ITE | Standard Operation | | | module move |
The entrance module was out a new seal went in and then the entrance module went back, and then TM#3 went back. So all modules are now back in place in the east target station. |