  1445   Tuesday, March 07, 2017, 09:25 David WangITWRepair  ITW HALCW 2" return line ball valve seals replacement.

Leaking seals on ITW HALCW 2" return line ball valve have been replaced. 8 liter waters are drained out for this job. Water are drained into a thick plastic bag.  The bag is tie strapped , labeled, and put into a yellow garbage bin in MAA. Water sample is given to RPG. After analyzing, RPG will give instruction on how to deal with it. Since we just refilled NALCW to system before this job, the active level on sample is very low. We may dump them into active sump.  After seals change, The system is refilled . I started pump and set everything back to normal configuration. NO leak has been found on new seals. The HALCW system is operating good so far.

  2135   Wednesday, August 19, 2020, 10:17 Adam NewsomeSouth Hot-CellStandard Operation  ITW Entrance Module moved to SHC

ITW Entrance Module was moved from west station to South Hot Cell.

  254   Wednesday, March 06, 2013, 14:12 David WangITWRepair  ITW EXIT1 tank to module o-ring replacement
 ITW EXIT1 o-ring replacement is fininshed today. The ITW EXIT 1 is back to ITW. The old o-ring lost most its elastic property and changed to stiff sqaure shape inside the slot.The flange surface around the o-ring slot was dirty. I cleaned the o-ring surface completely before putting the new o-ring . Everything should be fine now. There will be a leak check late on this new installed o-ring.
  296   Friday, April 12, 2013, 10:32 David WangITWRepairTM1 ITW EXIT1 tank to module o-ring leak check.

I leak checked new installed ITW EXIT1 tank to module o-ring.No leak had been found . Also ,TM1 primary vessel air to vacuum seals had been checked at the same time. There was no response had been found on leak detector.

  145   Monday, July 09, 2012, 16:08 David WangITEStandard OperationTM4UO#3ITM4 in ITE connected and pumping down

 TM4 has been moved to ITE and connected there today. I started six turbo pumps this afternoon. One of TP4 back valve (one in pairs) didn’t open .It caused the TP4 difficult to start. I disconnected that control cable that plug to solenoid valve and reconnected it. Then it works fine. After this, TP4 started to normal speed easily. The vacuum readings are OK so far. Tomorrow morning they all should be around 6-7 X E-6 torr range. Water interlock checks related to TM4 have been finished. NO water supply to ITE dump and entrance to keep the system pressure over 90psi. All TM4 water signals are good and strong by watching them from electrical panel. Gas line connected and valves opened. Control page set to fibiad .

  175   Wednesday, September 12, 2012, 07:00 David WangITEStandard OperationTM4NiO #1ITM4 in ITE connected and pumping down

TM4 had been connected in ITE. Six turbo pump had been started . thepumpming diwn is very good so far. The water interlock check on ITE and TM4 had been finished and everything is good.All water signals are strong and constant by visually checking.

  2564   Wednesday, April 17, 2024, 11:58 David WangITE/ITWMaintenance  ITH:MP1S pump inside lubricant was changed today.

ITH:MP1S pump inside lubricant was changed today. old lubricant is dirty with dark color. they are stored in sealed waste oil jug and stored in silo area. Pump has been installed back and started. It works fine.

  2496   Friday, October 13, 2023, 11:51 David WangITE/ITWMaintenance  ITH:MP1 is replaced due to its poor performance.

ITH:MP1 is replaced this morning due to its poor performance started yesterday afternoon. The general field in pit is about 260usv/hr. the contact field on pump is 2.0 msv/hr. New pump works good. Lubricant in pump will be drained next week. then motor will be removed. The pump body will be bagged and stored in silo area.

  2744   Thursday, January 09, 2025, 11:08 David WangFacilitiesMaintenance  ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings

ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings and investigation in pit. A fault 17644 has been issued. this pump will be replaced in March when general fielding in vacuum pit is reasonable for the job.

  2780   Monday, March 03, 2025, 10:53 David WangITE/ITWMaintenance  ITH:MP1 has been replaced.
No issues seen on new pump; ITH:CG2 ~0.008T with ITH:CG1 ~0.001T.I am happy with performance. ITH:MP1 turned back off; ITH:PV1 closed and ITH:SV4 closed after the job.
- Chloe Beaumier-Martin

image

  1844   Thursday, January 03, 2019, 13:30 David WangITWRepair  ITH:MP1

ITH:MP1 inlet pressure showed 10torr after power outage during holiday. All ITE/W turbo-pumps were tripped because of it. Removed one shielding block above the vacuum station. Visually checked oil level  and condition in pump. oil level is high. oil color is dark. no oil  leak .  Installed a local convectron gauge on pump inlet. After pumping down, It shows pump is good.  Tightened  all KF 25 and 50 clamps on pump inlet side. Reconnected pump to system. Everything works fine so far. All ITW / E turbo pumps are started now.

  1852   Wednesday, January 09, 2019, 13:29 David WangITWRepair  ITH:MP1

ITH: MP1 has been replaced due to its poor performance.  Its motor and power cable are taken out and reused on new pump. Vacuum group assembled them together, and installed the new pump. The new pump works fine.

  2097   Monday, June 01, 2020, 12:46 David WangITEMaintenance  ITH:CM6 ,CM6S and ITM:CM3 calibration.

Edi calibrated ITH:CM6, CM6S and ITM:CM3. By the same time,  ITH:MP1 and MP2  lubricate oil level are checked. Everything looks fine. No oil  leak on both pumps. 

  1696   Thursday, April 05, 2018, 11:29 David WangITWMaintenance  ITH MP1 replacement

ITH MP1 is replaced today with a new style pump.The new pump is 0.75 inch higher than  old pump on inlet and exhaust so a new solid inlet adapter  (KF50-25) has to been used. For future secondary pump ITH MP1S replacement, we need a new adapter 0.75 inches shorter as well.   The new pumps is started . Everything works fine. Old pumps is drained , bagged, and stored in TH B2 level. All radioactive garbage produced during the job are bagged , tagged, and stored in TH as well.

  244   Thursday, February 14, 2013, 09:31 David WangITWRepair  ITH MP1 is replaced.

Edi and I replaced the broken ITH MP1 in target hall with a new pump. The old pump was leak on oil. There were no oil had been left in the old pump by checking the sight glass.Thats the reason of  the pump  failure.The tray which the old pump sat on was full of leaking oil ( highly contaminated ). The old pump was bagged in 3 thick plastic bags ,and the tray was cleaned before the new pump was installed. The working area had been cleaned up and surveyed couple of times after the job. Everything is good. The new pump had been tested after the installation. It works fine.

  2189   Thursday, February 18, 2021, 12:33 David WangITERepair  ITE:TP1S

ITE TP1S new pump is installed today. Reset pump life time on controller to 0 hr.

  2360   Tuesday, August 23, 2022, 11:33 Carla BabcockITERepair  ITE:ANODE swapped with TCS:ANODE

ITE:ANODE supply reading strange currents - 17mA with the power supply on and no voltage. Checked anode circuit from electrical room:

Anode wire in electrical room shows 0L at 250V

Circuit with 50kOhm resistor mostly looks good (49-52kOhms) but a couple times read 28kOhms, no idea why. Tried jiggling all cables, unplugging and replugging and everything looks fine.

But power supply still seems to be giving out signal for 17mA readback. Decided fastest to swap with TCS power supply and troubleshoot this one on the bench.

  2052   Monday, January 27, 2020, 10:40 David WangCoolingMaintenance  ITE/ITW supply water presuure on dump circuits.

With both stations in operation,ITE dump supply gauge reading is 27 psi. ITW is 20 Psi.  I adjusted ITW dump pressure to 25 psi by changing the return line side pressure relieve valve.

ITE full operation+ ITW no TM: ITE dump pressure 27psi, ITW dump pressure 27psi.

2019-01-30: Water only supply to 2A beam lines only on both side, No TM2 and TM4 in water loop.  ITE dump pressure 27psi, ITW dump pressure 27psi.

  2299   Tuesday, January 25, 2022, 08:57 David WangITE/ITWStandard Operation  ITE/ITW have been cleaned with vacuum canister.

ITE/ITW  are cleaned with vacuum canister. HV  cage inside and blue nylon insulators are wiped.  Garbage inside the pits are cleaned out.

  1869   Friday, February 15, 2019, 12:09 David WangITEMaintenanceTM4 ITE water system maintenance.

The ITE water system maintenance job is done. Changed all paddle wheels and coils on ITE flow sensors. All using water poly-tubes in ITE are replaced .  Started high active water pump, and checked ITE water signals. They are good. No leak has been found on  replaced tubes and related fittings.