ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
 |
772
|
Tuesday, October 21, 2014, 14:53 |
Travis Cave | Spent Target Vault | Standard Operation | | ZrC#6 | Spent target move | ZrC#6 has been moved from the south hot
cell and into storage. It was placed in pail
120 in slot 5C of the vault. For more details |
|
774
|
Wednesday, October 22, 2014, 13:05 |
Anders Mjos | Conditioning Station | Maintenance | | | Controls upgrade on TCS | See work
permit for details |
|
781
|
Wednesday, November 05, 2014, 14:21 |
Anders Mjos | Conditioning Station | Development | | | Jumper installed on TGHT, TBHT and COIL | A copper bar jumper (ITD0488) was
installed on the TGHT, TBHT and COIL conductors
on the taregt hall side for TCS testing. |
 |
789
|
Monday, November 17, 2014, 13:45 |
chad fisher | South Hot-Cell | Repair | | | Jig for roof install of target | Jig for installation of target through
hot cell roof has been assembled and placed
in the target hall. |
   |
791
|
Tuesday, November 18, 2014, 11:14 |
David Wang | South Hot-Cell | Standard Operation | | UCx11 | crane down UCx 11 target into SHC from TH | I craned down UCx11 target from TH into
SHC. Chad was in SHC service area watching
on it. The source tray moving jig was installed |
|
799
|
Friday, November 21, 2014, 10:40 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#44 | Spent target move | The spent Ta#44 target has been removed
from the south hot cell, it was placed in
pail #121 and placed in spot 4A of the storage |
|
800
|
Tuesday, November 25, 2014, 11:33 |
David Wang | South Hot-Cell | Development | | | Remove UCX 11 target transfer stand from SHC back to TH. | The stand was used for transferring UCX11
targte from TH to SHC. The stand wit target
was craned down from TH into SHC last week |
|
802
|
Wednesday, November 26, 2014, 11:11 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#38, Nb#7, TiC#3, NiO#2, and SiC#29 | Spent targets moved to mini storage | The following targets have been moved to
the mini storage from the target storage
vault: |
|
804
|
Monday, December 01, 2014, 12:05 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 Maintenance | F-308's have been serviced and are ready
to be filled with spent targets. F-308's
witch were serviced are #6,#13,#15,#16,and |
|
806
|
Monday, December 01, 2014, 14:48 |
Travis Cave | Spent Target Vault | Standard Operation | | | F-308s moved | The F-308s have been moved into the target
hall, for filling on wednesday. |
|
811
|
Thursday, December 04, 2014, 09:57 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target placed in F-308. | Spent targets in the mini storage were
placed into the F-308s yesterday, all F-308
have been removed from the the target hall |
|
823
|
Monday, December 15, 2014, 15:55 |
Grant Minor | Conditioning Station | Repair | | | Access to ISAC TCS TK2 Expansion Tank - Fall Arrest | Hello all,
Access was required this morning to |
   |
831
|
Thursday, January 08, 2015, 10:34 |
chad fisher | South Hot-Cell | Standard Operation | | | TM2 Tray Build Status and Problems | Final assembly of the source tray for TM2
was started this morning.
Sliding tray was received from keensert |
   |
840
|
Friday, February 06, 2015, 08:06 |
David Wang | Crane | Repair | | | TH crane lost movement controls since last Friday. | Last Friday, During the crane per use check,
I found the main power supply to to crane
was shut off. I was told Don and Travis |
|
841
|
Friday, February 06, 2015, 12:27 |
David Wang | Crane | Repair | | | TH crane troubleshoot | Gordon crane technician started TH crane
trouble shooting this morning. The problem
is found that there is no 115VAC power supply |
|
842
|
Wednesday, February 11, 2015, 13:13 |
chad fisher | South Hot-Cell | Maintenance | | | New gas bottle storage rack | The new gas bottle storage rack has been
installed by/for the south hot cell.
|
|
844
|
Monday, February 16, 2015, 11:57 |
David Wang | Crane | Repair | | | TH crane | Dave.Morris installed a new battery on
crane control PLC board and uploaded the
program. Travis, Dan and I tested the crane |
|
845
|
Tuesday, February 17, 2015, 13:06 |
Anders Mjos | ITE | Development | | | Resistance measured of TGHT and TBHT lines to ITE | The copper bars was installed by David
and Anders. After the measurements were completed,
the copper bars were removed. |
 |
846
|
Tuesday, February 17, 2015, 13:07 |
Anders Mjos | ITW | Development | | | Resistance measured of TGHT and TBHT lines to ITW | See e-log entry
for ITE for details. The copper bars have
not been removed. They can be used for testing |
|
847
|
Monday, February 23, 2015, 12:28 |
David Wang | ITE | Maintenance | | | 2015 shut down coils and pedal wheels replacement on ITE water flow sensors. | Dan and I replaced pedal wheels and coils
on ITE water flow sensors. It is a shut down
job we did every two years. See attachment |
|