ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  772   Tuesday, October 21, 2014, 14:53 Travis CaveSpent Target VaultStandard Operation ZrC#6Spent target moveZrC#6 has been moved from the south hot
cell and into storage. It was placed in pail
120 in slot 5C of the vault. For more details
 Vault_Storage_October_21_2014.pdf 
  774   Wednesday, October 22, 2014, 13:05 Anders MjosConditioning StationMaintenance  Controls upgrade on TCS See work
permit for details
  
  781   Wednesday, November 05, 2014, 14:21 Anders MjosConditioning StationDevelopment  Jumper installed on TGHT, TBHT and COIL A copper bar jumper (ITD0488) was
installed on the TGHT, TBHT and COIL conductors
on the taregt hall side for TCS testing.
 Jumper1.jpgJumper2.jpg 
  789   Monday, November 17, 2014, 13:45 chad fisherSouth Hot-CellRepair  Jig for roof install of targetJig for installation of target through
hot cell roof has been assembled and placed
in the target hall.
 Target_roof_install_20141117_01.jpgTarget_Roof_install_Jig_20141117_02.jpgTarget_roof_install_20141117_03.jpgTarget_roof_install_20141117_04.jpg 
  791   Tuesday, November 18, 2014, 11:14 David WangSouth Hot-CellStandard Operation UCx11crane down UCx 11 target into SHC from THI craned down UCx11 target from TH into
SHC. Chad was in SHC service area watching
on it. The source tray moving jig was installed
  
  799   Friday, November 21, 2014, 10:40 Travis CaveSpent Target VaultStandard Operation Ta#44Spent target moveThe spent Ta#44 target has been removed
from the south hot cell, it was placed in
pail #121 and placed in spot 4A of the storage
 Vault_Storage_November_21_2014.pdf 
  800   Tuesday, November 25, 2014, 11:33 David WangSouth Hot-CellDevelopment  Remove UCX 11 target transfer stand from SHC back to TH.The stand was used for transferring UCX11
targte from TH to SHC. The stand wit target
was craned down from TH into SHC last week
  
  802   Wednesday, November 26, 2014, 11:11 Travis CaveSpent Target VaultStandard Operation Ta#38, Nb#7, TiC#3, NiO#2, and SiC#29Spent targets moved to mini storageThe following targets have been moved to
the mini storage from the target storage
vault:
  
  804   Monday, December 01, 2014, 12:05 maicodallavalleSpent Target VaultMaintenance  F-308 MaintenanceF-308's have been serviced and are ready
to be filled with spent targets. F-308's
witch were serviced are #6,#13,#15,#16,and
  
  806   Monday, December 01, 2014, 14:48 Travis CaveSpent Target VaultStandard Operation  F-308s movedThe F-308s have been moved into the target
hall,  for filling on wednesday.
  
  811   Thursday, December 04, 2014, 09:57 Travis CaveSpent Target VaultStandard Operation  Spent target placed in F-308.Spent targets in the mini storage were
placed into the F-308s yesterday, all F-308
have been removed from the the target hall
  
  823   Monday, December 15, 2014, 15:55 Grant MinorConditioning StationRepair  Access to ISAC TCS TK2 Expansion Tank - Fall ArrestHello all,

Access was required this morning to
 TK2_Expansion_Tank_Elevation_ISAC1_Exp_Hall_15Dec2014.JPGTK2_Expansion_Tank_-_Fall_Arrest_Config_1_-_15Dec2014.JPGTK2_Expansion_Tank_-_Fall_Arrest_Config_2_-_15Dec2014.JPGTK2_Expansion_Tank_-_Fall_Arrest_Config_3_-_15Dec2014.JPG 
  831   Thursday, January 08, 2015, 10:34 chad fisherSouth Hot-CellStandard Operation  TM2 Tray Build Status and ProblemsFinal assembly of the source tray for TM2
was started this morning.
Sliding tray was received from keensert
 TM2_Tray_20150108_09.jpgTM2_Tray_20150108_10.jpgTM2_Tray_20150108_11.jpgTM2_Tray_20150108_12.jpg 
  840   Friday, February 06, 2015, 08:06 David WangCraneRepair  TH crane lost movement controls since last Friday.Last Friday, During the crane per use check,
I found the main power supply to to crane
was shut off. I was told   Don and Travis
  
  841   Friday, February 06, 2015, 12:27 David WangCraneRepair  TH crane troubleshoot Gordon crane technician started TH crane
trouble shooting this morning. The problem
is found that there is no 115VAC power supply
  
  842   Wednesday, February 11, 2015, 13:13 chad fisherSouth Hot-CellMaintenance  New gas bottle storage rackThe new gas bottle storage rack has been
installed by/for the south hot cell.
 
 20150211_115656.jpg 
  844   Monday, February 16, 2015, 11:57 David WangCraneRepair  TH craneDave.Morris installed a new battery on
crane control PLC board and uploaded the
program. Travis, Dan and I tested the crane
  
  845   Tuesday, February 17, 2015, 13:06 Anders MjosITEDevelopment  Resistance measured of TGHT and TBHT lines to ITEThe copper bars was installed by David
and Anders. After the measurements were completed,
the copper bars were removed.
 002.JPGResistance_from_Electrical_Room_to_Target_Station.xlsx 
  846   Tuesday, February 17, 2015, 13:07 Anders MjosITWDevelopment  Resistance measured of TGHT and TBHT lines to ITW See e-log entry
for ITE for details. The copper bars have
not been removed. They can be used for testing
  
  847   Monday, February 23, 2015, 12:28 David WangITEMaintenance  2015 shut down coils and pedal wheels replacement on ITE water flow sensors.Dan and I replaced pedal wheels and coils
on ITE water flow sensors. It is a shut down
job we did every two years. See attachment
 2015_shut_down_ITE_water_sensors__replacements.pdf 