  276   Monday, March 25, 2013, 10:59 Bevan MossConditioning StationDevelopmentTM4FEBIAD HP with Dummy TargetCommissioning TCS - Part 2 Completed

    

       
            
 IRH1511.pdfISK4574D-rev7.pdf 
  277   Monday, March 25, 2013, 14:19 Travis CaveConditioning StationStandard OperationTM4CS Test Target #1module moveTM#4 with the CS Test target has been moved
from the conditioning station to the south
hot cell. Move went well.
  
  288   Thursday, April 04, 2013, 12:07 Bevan MossConditioning StationStandard OperationTM1Ta #39Roughing started Roughing started at 12:06. It was
believed there was a problem with the compressed
air but there was none, TM1 doesn't leak
  
  289   Thursday, April 04, 2013, 14:31 Bevan MossConditioning StationStandard OperationTM1Ta #39Roughing started

    

       
            
  
  290   Monday, April 08, 2013, 09:01 Travis CaveConditioning StationStandard OperationTM1Ta#39Electrical checkTM#1 with Ta#39 at the conditioning station,
has failed its electrical test see attached
pdf for details. Also while setting up for
 TM1_Ta39_CS_ELEC_CHK.PDF 
  291   Monday, April 08, 2013, 12:10 Travis CaveConditioning StationStandard OperationTM1Ta#39Electrical checkTM#1 with Ta#39 had the electrical check
done on it again it passed, changes this
time were the water lines were purged and
 TM1_Ta39_CS_ELEC_CHK2.PDF 
  292   Monday, April 08, 2013, 16:16 Bevan MossConditioning StationStandard OperationTM1Ta #39Venting with Argon TM1 started venting at 4:15 pm with
Argon. I will leave the valve open over night.
  
  293   Tuesday, April 09, 2013, 09:06 Travis CaveConditioning StationStandard OperationTM1Ta#39Electrical checkTM#1 with Ta#39 has not passed it electrical
check again, while sitting at the conditioning
station at air. The readings have not been
 TM1_Ta39_CS_ELEC_CHK3.PDFTM1_Ta39_CS_ELEC_CHK4.PDFTM1_Ta39_CS_ELEC_CHK5.PDF 
  294   Thursday, April 11, 2013, 07:18 David WangConditioning StationMaintenanceTM1Ta#29helium pressure tested all water lines in TM1 at CSOn April 08th, all water lines in TM1 had
been helium pressure tested(70psi) at conditioning
station. No leak had been found.
  
  303   Wednesday, April 17, 2013, 10:59 Travis CaveConditioning StationStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the south hot cell to the conditioning station.
Move went well. The fields around the module
  
  304   Wednesday, April 17, 2013, 15:17 Bevan MossConditioning StationStandard OperationTM3N/ATurbo Pumps Failed Both Turbo pumps on TM3 have failed.
They were both attempted to start in soft
mode. TP2 could only achieve ~19kpm and TP1
  
  305   Friday, April 19, 2013, 10:48 Bevan MossConditioning StationMaintenanceTM3N/ATurbo Pump 2 replaced Turbo Pump 2 has been replaced on
TM3. I got a count of 350 on the sleeve of
my tank suit.
  
  306   Friday, April 19, 2013, 10:48 Bevan MossConditioning StationMaintenanceTM3N/ATurbo Pump 2 replaced Turbo Pump 2 has been replaced on
TM3. I got a count of 350 on the sleeve of
my tank suit.
  
  307   Friday, April 19, 2013, 10:51 Bevan MossConditioning StationStandard OperationTM3N/ARoughing Started 10:48With the Turbo pump replaced I have started
roughing at 10:48
  
  308   Friday, April 19, 2013, 13:32 Bevan MossConditioning StationStandard OperationTM3N/ATurbo Pumps Started Both Turbo Pumps are now operational.   
  309   Friday, April 19, 2013, 15:25 Bevan MossConditioning StationStandard OperationTM3N/ATurbo Pumps Started

    

       
            
  
  310   Monday, April 22, 2013, 09:33 David WangConditioning StationRepairTM3 Leak check TM3 at conditioning stationTM3 leak check at conditioning station
without target: TM3 all air to vacuum seals
have been leak checked . They are all good.
  
  311   Monday, April 22, 2013, 11:31 Bevan MossConditioning StationStandard OperationTM3N/ACooling Package Started Cooling Package was started at 9:25
this morning inlet conductivity is 0.08 Mohm
at 22.9C. Resistance reached 5.33 Mohm by
  
  312   Monday, April 22, 2013, 11:35 Bevan MossConditioning StationRepairTM3N/ATCS:DIF2 broken The flow meter on the primary side
(TCS:DIF2) of the conditioning station is
broken. I investigated and there is flow,
  
  313   Tuesday, April 23, 2013, 11:19 Bevan MossConditioning StationStandard OperationTM3N/AHV Test All common A HV test was conducted yesterday
on TM3. There was no target and all items
were tied to common or ground. The conductivity
 TM3_40kV_22042013.txt22042013_TM3_40kV_Archiver.csvRGA_files.zip 