Entry  Tuesday, November 19, 2013, 14:24, David Wang, ITE, Repair, , , ITE TP3 
Hi all, The old  ITE  TP3 pump is moved out and the new pump is  in
postion .Since this time I used a  new holding ring(1 piece) insead of old 2 pieces holding ring which are thicker  than new ring, the old holding 
bolts are a little bit too long for the thread  holes on the  ITE exit 1. I have to find the right length bolts for this new  holding ring. The pump
Entry  Friday, November 22, 2013, 10:29, Travis Cave, Spent Target Vault, Standard Operation, , NiO#2, Spent target move Vault_Storage_November_22_2013.pdf
NiO#2 has been moved from the south hot cell into spent target storage. It was placed in pail 111 in slot 3C of the storage vault. It was 76.4mSv/hr
upon removal from the south hot cell.
Entry  Tuesday, November 26, 2013, 14:10, Travis Cave, Crane, Maintenance, , , Thermal relay replaced 
The bad thermal motor protection relay for the crane has been replaced with a new unit. Crane was tested in pendant(local) operation and all drives worked.
Entry  Tuesday, December 03, 2013, 10:35, Travis Cave, ITW, Standard Operation, , , fields above and in the target station with blocks off 
The blocks have been removed from the west target station. The fields at the top of the target pit at the railing at waist level is about 80uSv/hr, Turbo
pumps are about 805uSv/hr, backing lines for the turbos about a 1mSv/hr and the average field in the area of work down in the pit is about 600 to 750uSv/hr.
The proton beam went off at 10:45 on December 2nd, these measurements were done at 09:00 on December 3rd.
Entry  Monday, December 09, 2013, 13:15, Travis Cave, Spent Target Vault, Standard Operation, , Ta#41, Spent target move Vault_Storage_December_9_2013.pdf
The spent Ta#41 target has been moved from the south hot cell to the spent target storage vault. It is an unnumbered pail (should be pail 112) and placed
in spot 7A of the vault it had a reading of 536mSv/hr upon removal from the south hot cell. See attached PDF for vault details.
Entry  Thursday, January 09, 2014, 11:07, chad fisher, South Hot-Cell, Maintenance, , , Field Level 
I have managed to reduce the field at the broken manipulator from 12 mSv/h to 400 uSv/h.
Entry  Thursday, January 16, 2014, 10:36, chad fisher, South Hot-Cell, Repair, , , East Manipulator Repair Manip_repair_20140114.jpgManip_repair_20140115.jpg
The repair/cable replacement on the east manipulator is now complete.
Yesterday's initail cable replacement went very well however, due to a minor glich, we were unable to test the tong movement until I was out of
the hot cell. Tong did not fully close and felt like there was a "hard stop" at a repeatable spot in the  closing of the tong. Upon further
Entry  Monday, January 20, 2014, 13:40, maicodallavalle, Spent Target Vault, Maintenance, , F-308, Empty F-308s 
Four empty F-308s just arrived back at Triumf. I moved them  from shipping to the Remote Handling Shop for service and inspection. I will work on
them when not busy with my other shutdown work. ( Cyclotron work)
Entry  Wednesday, January 22, 2014, 10:51, David Wang, ITE, Repair, , , Removed 4 shielding blocks located on top of preseperator in TH 
Travis and I removed 4 shielding blocks located on top of pre-seperator  in TH. This is a job for ITE harp 9 re-installation after it  is repaired
. The blocks move are successful.
Entry  Wednesday, January 22, 2014, 15:00, Travis Cave, Spent Target Vault, Standard Operation, , UC#8, Spent target move Vault_Storage_January_22_2014.pdf
UC#8 has been moved from the south hot cell to the vault storage. It was placed in pail 113 and placed in slot 8A of the vault. The field was 9.2mSv/hr
upon removal from the south hot cell.
Entry  Wednesday, January 22, 2014, 15:20, Anders Mjos, South Hot-Cell, Standard Operation, , UC#8, Target Inspection - post beam 
The Target Assembly was inspected with Chad, Jens Henning and Anders today.

    The Target Container was broken.
    Material was deposited on the Heat Shield around the Target Center Block
    Material
was deposited on the IG-LIS source.
    Electrical checks to ground (HS)
    
        The Extraction Electrode passed the electrical
Entry  Monday, February 03, 2014, 14:45, Travis Cave, Spent Target Vault, Standard Operation, , , Spent targets to mini storage and the F-308s to the Target Hall Vault_Storage_February_3_2014.pdfMini_Vault_Storage_February_3_2014.pdf
Targets NiO#1(101), Nb#5(85), TaC#1(92), and ZrC#5(81) have been moved from the storage vault and placed in the mini storage. The F-308 flasks have also
been moved in to the target hall as well. The attached are the current statuses of both vaults.
Entry  Wednesday, February 05, 2014, 14:12, Travis Cave, Spent Target Vault, Standard Operation, , , Targets moved from mini storage to F-308s 
All targets in the mini storage (4) have been moved from there and placed into the F-308s and those have been moved to the mech services room.
Entry  Tuesday, March 11, 2014, 10:47, Travis Cave, ITE, Repair, , , entrance module move 
ITE entrance module has been moved from the east station to the south east silo.
Entry  Wednesday, March 12, 2014, 16:33, Keith C Ng, ITE, Repair, , , 2A3 window removal and replacement 20140312_2a3window_RHB_6676.JPG20140312_2a3window_RHB_6682.JPG2a_bp_sw1_white_powder_under_w11.PDF2a_bp_sw2_white_powder_under_w11.PDF2a_bp_sw3_rust_w11.PDF
prep'ed area for work:
- removed shield plug from window clamp area
- inspected clamp from tunnel side and from top of target station: video recorder was not working, will try again tomorrow.
Entry  Thursday, March 13, 2014, 16:23, Keith C Ng, ITE, Repair, , , 2a3 window - inspection Fullscreen_capture_03132014_41458_PM.bmp.jpgFullscreen_capture_03132014_41527_PM.bmp.jpg
Video inspected 2a3 window joint this morning.
Screenshots from video showing debris forming around aluminum cradle and brown/red dust on top of beam pipe.
Entry  Monday, March 17, 2014, 15:39, Keith C Ng, ITE, Repair, , , 2a3 window - prep and clean 
Cleaned top of the ITE vacuum flange and top of window clamp. Attempted to clean the bellows/beam pipe through the wall, mostly dust and small particles.
When cleaning bottom of the wall penetration we picked up a stone/fragment and the vacuum stopped. Appears to be a rock of some kind. 800cpm.
Videos on \\trwindata\groups\remote handling\Videos\2014\2014_2A3window folder, videos 3 and 4.
Entry  Tuesday, March 18, 2014, 16:01, Keith C Ng, ITE, Repair, , , 2a3 window - prep and clean Fullscreen_capture_03182014_35409_PM.bmp.jpgFullscreen_capture_03182014_35316_PM.bmp.jpg
Continued with vacuuming inside wall penetration to remove debris. Changed filter bag in nilfisk vacuum, left old filter in place however vacuum continues
to stall after >5min use. Vacuum gets quite warm before self shutting off. Debris seems to be falling back down on to joint if vacuum is turned off.
Took some screenshots of video showing removed debris and rust(?) on beam pipe. Video located on remote handling group folder. 
Entry  Wednesday, March 19, 2014, 16:48, Keith C Ng, ITE, Repair, , , 2a3 window - beam tube removal 11x
Today:
1) Vaccumed top and around clamp. Disconnected clamp from flanges and removed from beam line. Currently bagged and stored in metal pail next to
target pit area. Clamp is 500 µSv @ 1/2 m.
Entry  Friday, March 21, 2014, 16:49, Keith C Ng, ITE, Repair, , , 2a3 window - tank flange inspection 20140321_2a3window_RHB_6777.JPG20140321_2a3window_P1030055.JPG20140321_2a3window_P1030057.JPG20140321_2a3window_IMG_0846.JPG
Today:
1) Cleaned flange with methanol and cotton glove, appears to be clean.