  61   Tuesday, November 22, 2011, 15:07 Bevan MossConditioning StationStandard OperationTM1UCx #3HV testing High Voltage (HV) testing was completed
on TM1 today. Vacuum was very good 1.9 x
10^-7 T in the service cap, 3.2 x 10^-7 in
 UCx_#3_HV_testing.JPG 
  68   Tuesday, January 10, 2012, 11:51 Grant MinorConditioning StationRepair  IMC at Cond. Station is VENTED - DO NOT PUT MODULE INHi Remote Handling,
The guage on the IMC circuit in the
Target Hall is reading atmosphere, and the
 IMC_Installation_and_Leak_Check_April_28_2011_011.jpg 
  79   Monday, April 02, 2012, 08:17 David WangConditioning StationDevelopment  conditioning station IMC pump down.I pumped down conditioning station IMC
today. The inside bellow pressure is -20
psi on the gauge.Visually checked the bellow
  
  80   Tuesday, April 03, 2012, 12:11 David WangConditioning StationDevelopment  leak check on conditioning station vacuum systemI did a leak check on conditioning station
vacuum system today.The vacuum system had
been roughed over night . This morning before
  
  82   Thursday, April 12, 2012, 09:38 Travis CaveConditioning StationStandard OperationTM1no targetMove ot TM#1TM#1 has been moved from the NE silo to
the Conditioning Station.
  
  83   Thursday, April 12, 2012, 14:40 David WangConditioning StationDevelopmentTM1 conditioning staion and TM1 is under TP1 and TP2 pumping now.TM1 moved to conditioning station to today.
After moving, I connected the vacuum system
which include all gauges ,vacuum lines ,
  
  84   Friday, April 13, 2012, 12:31 David WangConditioning StationDevelopmentTM1 TM1 and conditioning station leak check.
 

 Normal
  0

 
   
  
  85   Monday, April 16, 2012, 16:17 Bevan MossConditioning StationStandard OperationTM1No TargetHigh Voltage Test A high voltage test was completed
on a target free TM1 in the conditioning
station. Only the turbo pumps on the target
  
  90   Friday, April 20, 2012, 14:07 Travis CaveConditioning StationStandard OperationTM1Nb#6module moveTM#1 with Nb#6 is now in the conditioning
station. The fields of the module at the
south cell was 15.8mSv/hr. The move was uneventful.
  
  93   Tuesday, April 24, 2012, 10:36 Bevan MossConditioning StationStandard OperationTM1Nb#6HV test April 23 A HV test was complete on TM1 with
Friedhelm, David, and Myself. The module
behaved as it has in other tests. The vacuum
  
  94   Tuesday, April 24, 2012, 10:38 David WangConditioning StationStandard OperationTM1 LP SIS Nb6TM1 heat shield circuit leak check with Nb5
 

 Normal
  0

 
   
  
  108   Tuesday, May 22, 2012, 08:33 Travis CaveConditioning StationStandard OperationTM4SiC#27Electrical checkElectrical check of TM#4 with SiC#27 under
vacuum at that conditioning station. See
attached PDF for details.
 TM#4_SiC#27_pre_beam_under_vac.PDF 
  109   Tuesday, May 22, 2012, 10:00 David WangConditioning StationStandard OperationTM4sic 27helium pressure test on heat shield circuitI did a helium pressure test on heat shield
circuit. The leak detector is concected to
the TM4 primary vacuum system.The IG1 is
  
  120   Thursday, June 07, 2012, 11:58 Bevan MossConditioning StationStandard OperationTM1Ta38Module Move from SHC to TCSTM1 was moved from SHC to the TCS. The
mode took roughly 1 hour. During the move
the north east corner of the containment
  
  121   Friday, June 08, 2012, 11:07 David WangConditioning StationStandard OperationTM1Ta38conditioning staion and TM1 is under TP1 and TP2 pumping now.I connected vacuum system to TM1 and conditioning
station and started two turbo pumps yesterday.
The pumping an d vacuum readings  are
  
  125   Monday, June 11, 2012, 14:14 Travis CaveConditioning StationStandard OperationTM1Ta#38Electrical checkElectrical check of TM#1 with Ta#38 at
the conditioning station under vacuum. See
attached file for details.
 TM#1_Ta38_at_constat_elec_check.PDF 
  126   Monday, June 11, 2012, 14:41 David WangConditioning StationStandard OperationTM1Ta38Heat shield helium pressure testConnected leak detector to TM1 and CS vacuum
system. The vacuum readings on TM1 and CS:PNG1
1.3 xE-6 Torr, IG1 4.7xE-7torr, IG4(diagnostic
  
  139   Wednesday, July 04, 2012, 13:18 David WangConditioning StationStandard OperationTM4uo#3leak check on heat shield circuit

    
        

           
  
  
  140   Wednesday, July 04, 2012, 14:16 Travis CaveConditioning StationStandard OperationTM4UO#3module moveTM#4 with UO#3 moved from the south hot
cell to the conditioning station. The fields
of the module at the hot cell was 74.4 mSv/hr.
  
  141   Friday, July 06, 2012, 09:24 Travis CaveConditioning StationStandard OperationTM4UO#3Electrical checkElectrical check of the target was done
at the conditioning station under vacuum,
see attached file for details.
 TM#4_UO#3_elec_check_under_vac.PDF 