  390   Thursday, June 27, 2013, 14:27 chad fisherSouth Hot-CellDevelopment  Polishing Cleaning tool - Water blocksThe polishing/cleaning tool prototype is
now finished and appers to work great.
Thanks to Dan and Maico for the great
 20130626_144941.jpg 
  393   Wednesday, July 03, 2013, 08:43 chad fisherSouth Hot-CellStandard Operation  Ta#39 Transfered to spent target storage vault    
  394   Wednesday, July 03, 2013, 08:44 chad fisher, Travis CaveSouth Hot-CellStandard Operation  Ta#39 Transfered to spent target storage vaultTa#39 has been transferred to spent target
storage vault. Ta#39 was placed into pail
#106 and placed into spot of 4C of the spent
 Vault_Storage_July_3_2013.pdf 
  412   Friday, July 26, 2013, 11:06 David WangSouth Hot-CellStandard Operation  The steel shielding plug has been put on theSHC top in target hallto reduce the radioactive shining from 
SHC Ta# 40 target.
  
  413   Monday, July 29, 2013, 14:32 Travis CaveSpent Target VaultStandard Operation Ta#40Spent target moveSpent target Ta#40 has been placed into
storage. The target was placed in pail #107
and was put into slot 5A of the vault. It
 Vault_Storage_July_29_2013.pdf 
  416   Wednesday, July 31, 2013, 11:13 Travis CaveSpent Target VaultStandard Operation  Spent target moveFive spent targets have been removed from
the storage vault and placed into the mini
storage. The target placed into the mini
 Vault_Storage_July_31_2013.pdfMini_Vault_Storage_July_31_2013.pdf 
  417   Wednesday, August 07, 2013, 06:47 maicodallavalleSpent Target VaultMaintenance  F-308All the F-308's have been torqued up 
and the locks installed. Ready to be moved.
  
  432   Wednesday, August 28, 2013, 14:17 Travis CaveSouth Hot-CellStandard Operation UC#6Spent target moveSpent target move, UC#6 has been moved
from the south hot cell to the target storage.
The target is in pail 108 and in slot 8C
 Vault_Storage_August_28_2013.pdf 
  462   Tuesday, September 24, 2013, 14:46 Bevan MossSouth Hot-CellRepair  Right manipulator repair    
  497   Tuesday, October 08, 2013, 13:11 Travis CaveSpent Target VaultStandard Operation SiC#29Spent target moveSiC#29 has been moved to the spent target
vault. The target was placed in Pail #109
and placed into slot 2B it was 24.7mS/hr
 Vault_Storage_October_8_2013.pdf 
  499   Tuesday, October 08, 2013, 14:58 Anders MjosSouth Hot-CellStandard Operation SiC#29Target to Heat Shield electrical shortThe SiC#29 CTL target has been taken apart
with the help of Isaac and Chad. Electrical
measurements were done between Target and
  
  503   Tuesday, October 15, 2013, 16:44 Grant MinorCraneRepair  Target Hall Crane - operational with temporary thermal sensor bypassE-mail correspondence on the Target Hall
crane fault diagnosis between October 11th
and 15th:
 ISAC_THall_Crane_elec_E5_1slash1_15Oct2013.pdf 
  505   Wednesday, October 16, 2013, 18:53 Grant MinorITERepair  ITE Harp 9 Removed & Blanked-Off - blocks NOT YET replacedThe blocks above the pre-separator section
of the ISAC beam lines     were removed today
in the Target Hall by Bevan Moss and Chad
 11x 
  507   Thursday, October 17, 2013, 17:16 Grant MinorITERepair  Pre-Separator-area (ITE Harp 9) Blocks ReplacedThe pre-separator-area blocks were replaced
today by Bevan and Travis, with Grant present
for photos and observation.
 8x 
  508   Friday, October 18, 2013, 10:17 Bevan MossITWRepair  Paddle Wheel Yesterday I visually inspected the
paddle wheel and noticed that it was spinning
freely and constant. As the signal was intermittent
  
  518   Tuesday, October 22, 2013, 16:52 Bevan MossConditioning StationRepair  Canbus base card for BIAS  The base card in the canbus BIAS
module was determined to be faulty. Dave
Morris removed a card VECC to repair the
  
  520   Tuesday, October 22, 2013, 17:07 Bevan MossConditioning StationStandard Operation  services shut down The turbo pump, roughing pump, have
been turned off and the valves for venting
opened. The cooling package has also been
  
  523   Thursday, October 24, 2013, 11:31 Travis CaveSpent Target VaultStandard Operation UC#7Spent target moveUC #7 has been moved from the south hot
cell to the spent target vault, it was placed
in pail #110 and put in slot 8B of the vault,
 Vault_Storage_October_24_2013.pdf 
  541   Tuesday, November 12, 2013, 14:33 Bevan MossConditioning StationRepair  Cooling manifold returned The cooling manifold for the conditioning
station high power water cooled lines has
been returned. The cooling package can once
  
  547   Monday, November 18, 2013, 16:44 Bevan MossConditioning StationStandard Operation  Testing of cooling package I have tested all of the compressors
for TCS. All are operational and cycled as
they should. 
  