359
|
Thursday, May 23, 2013, 14:07 |
Bevan Moss | Conditioning Station | Repair | | | Chiller Unit Repaired | ESC came today and "repaired"
the chiller. There was something wrong with
the VFD controller. The were able to get |
|
361
|
Thursday, May 23, 2013, 14:12 |
Bevan Moss | Conditioning Station | Maintenance | | | Primary Circuit Drained and Flushed | Rob Walker has drained the primary
side of the conditioning station. It will
be flushed, filled and chemically treated. |
|
364
|
Monday, May 27, 2013, 11:55 |
chad fisher | South Hot-Cell | Standard Operation | | | Special Tooling for RFQ target | The special tool made for the RFQ target
autopsy has been inserted into the hot cell.
|
|
365
|
Monday, May 27, 2013, 15:59 |
Bevan Moss | Conditioning Station | Repair | | | Compressor fault | Once again the 7.5 compressors are
tripping due to faults. I believe it is due
to over pressure as a result of the chiller |
|
366
|
Monday, May 27, 2013, 16:01 |
Bevan Moss | Conditioning Station | Repair | | | CanBUS card | During HV conditioning of TM4 with
Ta#40 there was a spark at ~43 kV that caused
the Bias card to "fry". Dave Morris |
|
372
|
Wednesday, May 29, 2013, 12:07 |
chad fisher | South Hot-Cell | Development | | SiC#28 RFQ | RFQ Autopsy | Major portions of the RFQ target have now
been sucessfully dismantled. More minor dismantling
with conclude this afternoon. |
|
373
|
Friday, May 31, 2013, 11:19 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#28 (RFQ Target) | Spent target move | Spent target SiC#28 (RFQ Target) has been
moved from the south hot to the storage vault.
The target was placed in pail #105 in spot |
|
375
|
Tuesday, June 04, 2013, 15:34 |
Bevan Moss | Conditioning Station | Repair | | | Relay replaced | ESC was called out again to inspect the
chiller as it was showing the same problem
as before. This time when started one fan |
|
377
|
Wednesday, June 12, 2013, 10:39 |
Travis Cave | South Hot-Cell | Standard Operation | | | spent source tray removal | The spent source tray for TM#3 has been
removed from the south hot cell and well
be placed in the the hot cell ante room. |
|
379
|
Thursday, June 13, 2013, 09:21 |
chad fisher | South Hot-Cell | Development | | | Warm Cell Mock-up | the warm cell mock-up has been inserted
into the warm cell and final preparation
for the remote test are being made. |
![20130613_084421[1].jpg 20130613_084421[1].jpg](attachment.png) |
382
|
Thursday, June 20, 2013, 13:47 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target Assay | Ten targets have been assayed or had field
measurements(they were too hot to ship but
were assayed the last time an assay was done) |
|
390
|
Thursday, June 27, 2013, 14:27 |
chad fisher | South Hot-Cell | Development | | | Polishing Cleaning tool - Water blocks | The polishing/cleaning tool prototype is
now finished and appers to work great.
Thanks to Dan and Maico for the great |
|
393
|
Wednesday, July 03, 2013, 08:43 |
chad fisher | South Hot-Cell | Standard Operation | | | Ta#39 Transfered to spent target storage vault | |
|
394
|
Wednesday, July 03, 2013, 08:44 |
chad fisher, Travis Cave | South Hot-Cell | Standard Operation | | | Ta#39 Transfered to spent target storage vault | Ta#39 has been transferred to spent target
storage vault. Ta#39 was placed into pail
#106 and placed into spot of 4C of the spent |
|
412
|
Friday, July 26, 2013, 11:06 |
David Wang | South Hot-Cell | Standard Operation | | | The steel shielding plug has been put on theSHC top in target hall | to reduce the radioactive shining from
SHC Ta# 40 target. |
|
413
|
Monday, July 29, 2013, 14:32 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#40 | Spent target move | Spent target Ta#40 has been placed into
storage. The target was placed in pail #107
and was put into slot 5A of the vault. It |
|
416
|
Wednesday, July 31, 2013, 11:13 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target move | Five spent targets have been removed from
the storage vault and placed into the mini
storage. The target placed into the mini |
 |
417
|
Wednesday, August 07, 2013, 06:47 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 | All the F-308's have been torqued up
and the locks installed. Ready to be moved. |
|
432
|
Wednesday, August 28, 2013, 14:17 |
Travis Cave | South Hot-Cell | Standard Operation | | UC#6 | Spent target move | Spent target move, UC#6 has been moved
from the south hot cell to the target storage.
The target is in pail 108 and in slot 8C |
|
462
|
Tuesday, September 24, 2013, 14:46 |
Bevan Moss | South Hot-Cell | Repair | | | Right manipulator repair | |
|