Entry  Thursday, August 07, 2014, 10:45, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, module move 
TM#4 has been moved from the south west silo to the south hot cell.
Entry  Wednesday, August 06, 2014, 11:12, Travis Cave, South Hot-Cell, Standard Operation, , SiC#30, Spent target move Vault_Storage_August_6_2014.pdf
SiC#30 in pail #117 has been move to the spent target vault and placed in spot 2C. See attached PDF for details.
Entry  Wednesday, August 06, 2014, 11:11, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, module move 
TM#3 with no target has been moved to the northwest silo for storage.
Entry  Tuesday, August 05, 2014, 11:53, David Wang, ITE, Repair, , , Reconnected ITE entrance module 
ITE entrance module is reconnected in ITE.
Entry  Tuesday, August 05, 2014, 10:40, Travis Cave, ITE, Standard Operation, , , module move 
ITE Entrance module has been moved back to the east station.
Entry  Thursday, July 31, 2014, 08:08, chad fisher, South Hot-Cell, Standard Operation, TM3, SiC#30, SiC#30 Removed and inpect TM320140731_01.jpgTM320140731_02.jpgTM320140731_03.jpgTM320140731_04.jpg
SiC#30 has been removed from TM3. A quick exam of TM3 source tray did not  yield any obvious signs of damage.
9 pin connector on the target showed the usual sparking/arcing marks.
Heat shield has been removed from the target. Inside of heat shield has some unusual marks on it and quite a lot of black deposits.
Entry  Wednesday, July 30, 2014, 11:51, Travis Cave, Conditioning Station, Maintenance, , , entrance module move 
ITE Entrance module has been moved from the east station to the conditioning station.
Entry  Monday, July 28, 2014, 17:26, Ron Kuramoto, ITW, Repair, , , ITW:IV5 Air leak repair DSCN0087.JPG20140728_142855_-_small.jpg20140728_143202_-_small.jpg
Air leak was found at the Solenoid control valve located in the Pre-Separator & DB0 room.  The gasket between
the solenoid body and its manifold block was broken, see attached photos. The gasket and solenoid body were replaced. Air was turned back on
to IV5 (B/L gate valve) with no apparent air leaks. The gate valve was actuated open & closed from the control room seeing both limits successfully.
Entry  Monday, July 28, 2014, 14:45, David Wang, Conditioning Station, Development, TM2, , turned off TM2 and CS turbo pumps. 
I turned off TM2 and CS turbo-pumps. TM2 will be moved from CS to silo tomorrow morning.
Entry  Monday, July 28, 2014, 14:37, David Wang, Conditioning Station, Development, TM2, , helium pressure test on TM2 tube heater +(D)and -(C)water lines. 7x

    TM2 installed in Conditioning Station
    Varian Leak detector connected directly to Target Module 2         Service cap.

   Vacuum draw in Target Station with both module turbo pumps
    Leak detector baseline normal (10^-4 Torr, 10^-9 Std cc/s He)
  
 Since no Source tray is installed, and tube heater supply         conductor is blanked off in target enclosure, it was necessary         to test both
Entry  Monday, July 28, 2014, 09:29, Travis Cave, Conditioning Station, Standard Operation, TM2, no target, module move 
TM#2 has been moved from the south hot cell to the conditioning station.
Entry  Thursday, July 24, 2014, 18:21, Grant Minor, South Hot-Cell, Repair, TM2, No target / no source tray, Leak check on TM2 ionizer tube cooling lines C and D - module side ITA6021_Rev_14_screencapture_cooling_lines_24July2014.jpgTM2_hot_cell_leak_check_tube_heater_C_D_24July2014_small2.jpgTM2_hot_cell_leak_check_no_source_tray_24july2014.JPG
Target Ionizer tube cooling lines "C" and "D" in Target Module 2 were both leak checked at the Hot Cell.  The lines were both
blanked-off.
Bill Paley was present with David Wang in the Target Hall, operating the leak detector.  Grant Minor and Anders Mjos were present with Chad
Entry  Thursday, July 24, 2014, 09:10, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, module move 
TM#2 has been moved to the hot cell from the north east silo.
Entry  Wednesday, July 23, 2014, 13:36, David Wang, ITW, Standard Operation, TM1, , TM1 in ITW. 
  TM1 has been connected in ITW . The new roughing pump replaced on last  Friday works good. I started all turbo pumps in ITW. The ITW TP1  controller
was broken during the starting time. Dimo and I changed a new  controller for ITW TP1 in electrical room. The pumping down is good so  far. ITW water supplies
to TM1 only.       
Entry  Tuesday, July 22, 2014, 07:32, David Wang, Conditioning Station, Standard Operation, TM1, , Stop TM1 and CS turbo pumps and ruff pump. 
Stop TM1 and CS turbo pumps and ruff pump. TM1 is disconnect at CS. It will be vented tomorrow morning and moved to ITW.
Entry  Monday, July 21, 2014, 13:11, David Wang, Conditioning Station, Standard Operation, TM1, , helium pressure test on TM1 HS water line at CS. 
The TM1 HS line is  pressure tested this morning with 70 psi helium  at CS. No response has been found on leak detector.
Entry  Thursday, July 17, 2014, 11:49, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 and CS turbo pumps have been started 
I connected TM1 at CS. All turbo pumps have been started. The pumping down is  good so far.
Entry  Thursday, July 17, 2014, 10:13, David Wang, Conditioning Station, Standard Operation, TM1, , Leak check on TM1 HS water line with new target installed 
Chad and I leak checked TM1 HS waterline with new target installed at SHC. The LD base LR:0.0xE-9atm.cc/sec, base pressure: 0.0xE-4 torr. Chad sprayed
helium on both VCR fittings and flushed helium around the target. No response has been found on leak detector. The target HS line is leak tight so far.
I will do helium pressure test on this line at CS on next Monday.
Entry  Thursday, July 17, 2014, 09:29, Travis Cave, South Hot-Cell, Standard Operation, TM1, Ta#43, module move 
TM#1 with Ta#43 has been moved from the south hot cell to conditioning station.
Entry  Wednesday, July 16, 2014, 14:28, Travis Cave, South Hot-Cell, Standard Operation, TM1, Ta#43, Electrical check TM1_Ta43_elec_chk_shc.PDF
TM#1 with Ta#43 electrical check see attached PDF.