ID Date Author Category Type Module Target/Number Subject Text Attachments
  968   Tuesday, June 30, 2015, 09:47 chad fisherSouth Hot-CellRepair  manipulator repairThe right hand manipulator has been repaired.
It took 43 minutes and I received ~ 0.56
mSv
  
  967   Monday, June 29, 2015, 10:51 David WangConditioning StationRepairTM2 leak on TM2 side panelThere is an air to vacuum leak on TM2 service
cap side panel which we moved out during
the TM2 wiring job. The CS pumps are stopped
  
  966   Friday, June 26, 2015, 15:38 Anders MjosConditioning StationDevelopmentTM2 Leak check and HV testRoughing started by David.
Friday, June 26, 2015, 15:31: Started
TP1S
  
  965   Friday, June 26, 2015, 14:33 David WangConditioning StationStandard OperationTM2 TM2 have been moved from SHC to CSBill and I mover TM2 from SHC to CS. The
move is smooth. I connected the CS vacuum
system after the move, and started the roughing.
  
  964   Friday, June 26, 2015, 09:45 chad fisherSouth Hot-CellRepairTM2 TM2 StatusContainment box window waterlines have
been connected and leak checked and new containment
box cover installed.
  
  963   Friday, June 26, 2015, 09:44 chad fisherSouth Hot-CellRepairTM2 TM2 Retrofit StatusOn June 25th the following work was completed:
Optics tray was installed into TM2.
The lower fastener on the vertical cable
 20150625_075616_1.jpg20150625_083457.jpg20150625_105735.jpg20150625_110053.jpg 
  962   Friday, June 26, 2015, 08:27 David WangConditioning StationStandard OperationTM2 Target Hall Scheduled Activities April 07 - July 24 2015Update the Target hall Schedule after some
changes on TM2 refurbishment. See attachment
1,2
 Target_Hall_Scheduled_Activities__Apr_07_to_July_24_2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_July_24_2015.mppTarget_Hall_Scheduled_Activities__Apr_07_to_July_24_2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_July_24_2015.mpp 
  961   Wednesday, June 24, 2015, 13:49 David WangSouth Hot-CellRepairTM2 TM2 new source tray vacuum leak check.All water blocks seals and joints have
been leak checked. No leak has been found
on any of them. See attachment
 TM2_new_source_tray_water_block_leak_check_at_SHC.pdf 
  960   Wednesday, June 24, 2015, 10:16 chad fisherSouth Hot-CellRepairTM2 TM2 Vacuum Leak CheckThe following circuits have been vacuum
leak checked and have not registered any
leaks:
  
  959   Tuesday, June 23, 2015, 16:49 Anders MjosConditioning StationDevelopment  TCS is beeing migrated to ISACby controls group (Dave Morris).

Friday, June 26, 2015
TCS has been migrated to ISAC controls.
  
  958   Tuesday, June 23, 2015, 14:19 chad fisherSouth Hot-CellRepairTM2 TM2 Water Block Jigs RemovedBoth halves of the water block jigs have
been removed and the module is now ready
for base vacuum leak and electrical checks.
 20150623_140917.jpg 
  957   Tuesday, June 23, 2015, 10:55 chad fisherSouth Hot-CellRepair  Left Manipulator RepairThe master wrist/tong cable has been replaced
on the left manipulator. Everything appears
to function well so far.
  
  956   Friday, June 19, 2015, 13:00 chad fisherSouth Hot-CellRepairTM2 TM2 Source Tray Install StatusLeft manipulator now broken. Master side
however, so repair can take place Monday
or Tuesday.
  
  955   Friday, June 19, 2015, 11:57 chad fisherSouth Hot-CellRepairTM2 TM2 Source Tray ProgressWindow waterline has been successfully
connected using 1 1/2 inch long non-blunt
start 1/4-28 bolts.
  
  954   Friday, June 19, 2015, 11:52 David WangITEStandard OperationTM4SiC #315 Shielding blocks have been transferred from ITW to ITE.5 shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam.
  
  953   Friday, June 19, 2015, 11:43 David WangITWRepairTM1 ITW external water leak on dump circuitThere was an external water leak in ITW
during the last beam running time. The leak
started after the shielding blocks transfer(May
 6x 
  952   Friday, June 19, 2015, 09:37 Isaac EarleSouth Hot-CellRepairTM2 TM2 Source Tray Installation - June 18, 2015 The following work was done on
June 18 2015:
- Finished cleaning and polishing
  
  951   Thursday, June 18, 2015, 08:03 chad fisherSouth Hot-CellRepairTM2 TM2 Optics Tray TransferThe TM2 optics tray has been transferred
from the source tray to the transfer fixture
in preparation for installation of the source
 20150618_075326_1.jpg 
  950   Wednesday, June 17, 2015, 14:21 chad fisherSouth Hot-CellRepairTM2 TM2 Waterblock Clean PolishFiberglass that fell out yesterday was
put back in place (as well as possible).
Cleaning took place this morning
 20150617_080236_1.jpg20150617_081538_1.jpg20150617_083830.jpg 
  949   Tuesday, June 16, 2015, 14:28 chad fisherSouth Hot-CellRepairTM2 TM2 Source Tray Installation/Water Block Sealing Surface CleanToday cleaning and polishing pads were
inserted into the hot cell.
Module side waterblock jig installation
 20150616_104240.jpg20150616_140505.jpg20150616_140506.jpg 