688
|
Tuesday, June 24, 2014, 15:45 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Ground Electrode and Extraction Electrode dirty after last run | See attached pdf and DocuShare for
more photos. It may be possible to clean
some of it from the Ground Electrode. |
|
687
|
Tuesday, June 24, 2014, 15:14 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Conductor insulator broken close to right TGHT terminal | When the Containment Box was opened today
by Chad for a target change, we found the
conductor insulator block B (ITD0054) to |
|
686
|
Tuesday, June 24, 2014, 11:58 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Electrical check | Electrical check of the TiC#4 on TM#3 post
beam at the south hot cell, see attached
PDF for details |
|
685
|
Tuesday, June 24, 2014, 11:33 |
maicodallavalle | Spent Target Vault | Standard Operation | | | F-308 Maintenance | Five F - 308 flasks containing five ISAC
spent targets were moved from the anteroom
into the south hot cell area. When the F |
|
684
|
Tuesday, June 24, 2014, 11:12 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | TiC#4 | module move | TM#4 with TiC#4 has been moved from the
east target station to the south hot cell. |
|
683
|
Tuesday, June 17, 2014, 10:46 |
David Wang | ITW | Standard Operation | TM1 | UC#9 | 5 Shielding blocks have been transferred from ITE to ITW. | 5 shielding blocks have been transferred
from ITE to ITW. ITW is configured to take
proton beam. Argon venting system for ITW |
|
682
|
Friday, June 13, 2014, 10:33 |
Anders Mjos | ITW | Development | TM1 | UC#9 | Flow meter data | Coil not used on TM1. Data and plots on DocuShare
Friday, June 13, 2014, 10:30. ITE |
|
681
|
Thursday, June 12, 2014, 09:42 |
Travis Cave | Spent Target Vault | Standard Operation | | | Targets moved from mini storage to F-308s | Five targets have been moved from the spent
target storage to the mini storage. The targets
that were moved are UCx #'s 6,7,8 , SiC #28, |
|
680
|
Tuesday, June 10, 2014, 14:02 |
David Wang | ITW | Standard Operation | TM1 | UC9# | TM1 and ITW turbo pumps have been started. | TM1 has been connected to ITW. It is pumping
down in ITW with 6 turbo-pumps on. |
|
679
|
Tuesday, June 10, 2014, 13:20 |
Travis Cave | ITW | Standard Operation | TM1 | UC#9 | module move | TM#1 with UC#9 moved from the conditioning
station to west station. |
|
678
|
Tuesday, June 10, 2014, 07:57 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC#9 | TM1 are vented with argon and disconnected at CS. | TM1 will be moved to ITW this morning. |
|
677
|
Monday, June 09, 2014, 10:33 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC9# | Stop TM1 and CS trubo pumps and ruff pump. | The CS and TM1 is still under vacuum. They
will be vented with argon tomorrow mornig |
|
676
|
Tuesday, June 03, 2014, 09:12 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC9# | TM1 HS line helium pressure test and TM1 electrical check at CS | TM1 HS line helium pressure test and TM1
electrical check at CS under vacuum are finished.
Everything is good. See attachment |
7x |
675
|
Monday, June 02, 2014, 15:40 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and CS turbo pumps have been started | TM1 and CS turbo pumps have been started.
The vacuum readings are fine on all gauges. |
|
674
|
Monday, June 02, 2014, 13:53 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UC#9 | module move | TM#1 with UC#9 has been moved from the
south hot cell to the conditioning station. |
|
673
|
Monday, June 02, 2014, 11:59 |
David Wang | South Hot-Cell | Standard Operation | TM1 | | Leak check on TM1 HS water line with new UC9# target installed | Chad and I leak checked TM1 HS and UC9#
VCR fittings. No response had been found
on leak detector during the test. I will |
|
672
|
Monday, June 02, 2014, 11:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | Electrical check | TM#1 with UC#9 electrical check see attached
pdf for details. |
|
671
|
Monday, June 02, 2014, 11:25 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx #9 | UCx #9 Installed | UCx #9 has been installed. |
|
670
|
Monday, June 02, 2014, 10:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 with no target has been moved from
the north west silo to the south hot cell. |
|
669
|
Friday, May 30, 2014, 09:41 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#42 | Spent target move | Ta#42 in pail #114 has been moved from
the south hot cell to the spent target storage
vault and place in spot 7B. The target was |
|