ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
608
|
Tuesday, February 25, 2014, 06:53 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check on TM2 tube heater (+) water line with blank off(C-seal) installed on WB. |
Chad and I did the leak check on TM2 tube heater (+) water line with blank off and C-seal installed on WB at South Hot Cell.The line was easy to pump down to 0.0xE-9atm.cc/sec and 0.0XE-4 torr on leak detector. Chad flushed lot helium around the water block (10 sec spray). No response had been found on leak detector. |
607
|
Monday, February 24, 2014, 13:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module move |
TM#2 moved from the south hot cell to the conditioning station. |
606
|
Monday, February 24, 2014, 12:09 |
chad fisher | South Hot-Cell | Repair | TM2 | | C-seal blank off test |
Circuit D has passed the vacuum leak check. Jig has been removed and containment box re-installed for move to conditioning station. |
Attachment 1: TM2_20140224_1.jpg
|
|
605
|
Monday, February 24, 2014, 11:05 |
chad fisher | South Hot-Cell | Repair | TM2 | | Circuit D blank off |
The blank off with the o-ring has been removed, manipulator fixed, circuit D water block sealinhg surfaces cleaned and blank off with c-seals installed and torqued. Leak check will occur shortly. |
604
|
Thursday, February 20, 2014, 11:04 |
chad fisher | South Hot-Cell | Repair | TM2 | | Readying TM2 for C-Seal Leak Check |
Containment box has been removed and water block jig installed. |
Attachment 1: TM2_20140220_01.jpg
|
|
603
|
Thursday, February 20, 2014, 09:45 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module move |
TM#2 has been moved from the conditioning station to the south hot cell. |
602
|
Tuesday, February 18, 2014, 11:26 |
David Wang | Conditioning Station | Repair | TM2 | | I stopped turbo pumps and disconnected vacuum system on TM 2 and CS |
I stopped turbo pumps and disconnected vacuum system on TM2 and CS. The TM2 will be moved to SHC for C seal installation on "D" water block. |
601
|
Monday, February 17, 2014, 09:32 |
David Wang | Conditioning Station | Repair | TM2 | | helium pressure test on TM2 tube heater +(D) water line. |
I did the helium pressure test on Tube heater+ line this morning. The vacuum on CS and TM2 are very good. The base lake rate on leak detector was 1.7xE-7 atm.cc/sec. Base pressure was 0.0xE-4torr. I applied helium to the "D"line .The test started from 30psi up to 80psi on both side "D" line.The base leak rate slightly changed to 1.9xE-7 atm.cc/sec during the test,but not base pressure. At this base leak rate level, No obvious leak had been found . See attachment pictures. The test will be repeated later when the base leak rate could be pumped into E -8 or E-9(the best) range. |
Attachment 1: 002.JPG
|
|
Attachment 2: 003.JPG
|
|
Attachment 3: 004.JPG
|
|
Attachment 4: 012.JPG
|
|
Attachment 5: 016.JPG
|
|
Attachment 6: 018.JPG
|
|
600
|
Thursday, February 13, 2014, 14:23 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check on TM2 tube heater (+) water line with blank off(elastic seal) installed on WB. |
Chad and I did the leak check on TM2 tube heater (+) water line with blank off( + elastic o ring seal) installed on "D" water block in SHC. We got the same no leak result as we got with rubber insert this morning. |
Attachment 1: 005.JPG
|
|
Attachment 2: 001.JPG
|
|
599
|
Thursday, February 13, 2014, 14:15 |
David Wang | South Hot-Cell | Repair | TM2 | | pressure test on TM2 tube heater +(D) water line. |
David Wang wrote: |
Chad and I did the pressure test on TM2tube heater+(D) water line at SHC with shop air.We tested from 30psi to 80psi on both side of D line. The bubbles were found at 50-55psi on blank off seal in SHC.
|
I would like to correct this E-LOG. There is no real leaking bubble had been found during the whole test according to the information supplied by Chad Fisher during this afternoon meeting. I would like to attach some pictures took from TH during this test. |
Attachment 1: 007.JPG
|
|
Attachment 2: 008.JPG
|
|
Attachment 3: 013.JPG
|
|
598
|
Thursday, February 13, 2014, 13:30 |
David Wang | South Hot-Cell | Repair | TM2 | | pressure test on TM2 tube heater +(D) water line. |
Chad and I did the pressure test on TM2tube heater+(D) water line at SHC with shop air.We tested from 30psi to 80psi on both side of D line. The bubbles were found at 50-55psi on blank off seal in SHC. |
597
|
Thursday, February 13, 2014, 09:24 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check TM2 tube heater (+) water line with rubber insert blocked WB in SHC |
Chad and I did the Leak checked TM2 tube heater (+) water line with rubber insert plugged water block on " D" in SHC. The Leak detector was very easy to pump down to the bottom leak rate and pressure. Chad checked the helium flow in SHC, and sprayed 10 second helium on the block. There is no response had been found during the test. The test was repeated again and no leak has been found. See attachment pictures. |
Attachment 1: 001.JPG
|
|
Attachment 2: 002.JPG
|
|
Attachment 3: 003.JPG
|
|
Attachment 4: 004.JPG
|
|
596
|
Tuesday, February 11, 2014, 13:56 |
chad fisher | South Hot-Cell | Repair | TM2 | | waterblock cleaning |
New cleaning and polishing pads have been inserted onto the hot cell as well as rubber bungs and a new blank off.
The inital waterblock cleaning with the "scotch bright" pads has been completed. See attached pictures...the first picture being before and the second after.
Tommorow the water block will have bungs put in and a leak check to check the block will take place. After that, the new blank off will be installed and tested.
|
Attachment 1: TM2_20140207_2.jpg
|
|
Attachment 2: TM2_20140211_2.jpg
|
|
595
|
Friday, February 07, 2014, 10:29 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 C.B. and circuit D |
Containment box has been removed and the blank off from circuit D has been removed for inspection of both the blank off and water block sealing surface. |
Attachment 1: TM2_20140207_1.jpg
|
|
Attachment 2: TM2_20140207_2.jpg
|
|
594
|
Wednesday, February 05, 2014, 14:12 |
Travis Cave | Spent Target Vault | Standard Operation | | | Targets moved from mini storage to F-308s |
All targets in the mini storage (4) have been moved from there and placed into the F-308s and those have been moved to the mech services room. |
593
|
Wednesday, February 05, 2014, 14:05 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check TM2 tube heater (+) water line from inside service cap in TH. |
Bevan and I did a leak check on TM2 tube heater+ from inside service cap in TH. The leak detector base leak rate 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4totrr. One of side panel on service cap was opened. Bevan sprayed the helium to the "D" line inside the blue insulator.The helium flow was checked , and he sprayed twice. No response has been found on leak detector. See attachment pictures |
Attachment 1: 005.JPG
|
|
Attachment 2: 008.JPG
|
|
Attachment 3: 005.JPG
|
|
592
|
Tuesday, February 04, 2014, 09:42 |
David Wang | South Hot-Cell | Repair | TM2 | | pressure test on TM2 tube heater +(D) water line. |
Chad and I did a pressure test on TM2 tube Heater+(D) water line.I pressurized the D line with shop air from quick connectors(both ends) on service cap.chad applied bubble soap onto the D water block in SHC. The test started from 5psi,and increased 5psi each time to 40 psi. From 5 to 35 psi, no bubble has been found on water block. At 40 psi , bubble appeared from blind blank off seal , but not from soldering joints. Since the o-ring seal for the blank off is vacuum seal , but not for pressurizing, It is understandable the seal could not hold 40 psi pressure air. No bubble had been found on the D water block soldering joints .See attachment pictures. |
Attachment 1: 015.JPG
|
|
Attachment 2: 016.JPG
|
|
Attachment 3: 021.JPG
|
|
Attachment 4: 018.JPG
|
|
Attachment 5: 017.JPG
|
|
Attachment 6: 019.JPG
|
|
Attachment 7: 020.JPG
|
|
Attachment 8: 029.JPG
|
|
Attachment 9: 028.JPG
|
|
Attachment 10: 029.JPG
|
|
591
|
Tuesday, February 04, 2014, 08:04 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check TM2 tube heater (+) water line. |
Chad and I leak checked TM2 tube heater(+) water line yesterday afternoon. The water line was difficult to pump down on base leak rate, but LD base pressure was fine . The base pressure on leak detector was pumped to 0.0XE-4 torr quickly. The base leak rate only could be pumped to 4.5 xE-8 atm.cc/sec after 1 hour waiting time. All vacuum connections to leak detector in the target hall were leak checked and they were good. Chad checked helium flow in SHC. He sprayed helium twice on tube heater(+) water block soldering joints. I did not see any response on leak detector in TH.The base Leak rate and base pressure did not move up during the test. See attachment pictures. |
Attachment 1: IMG_0012.JPG
|
|
Attachment 2: IMG_0013.JPG
|
|
590
|
Monday, February 03, 2014, 14:45 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent targets to mini storage and the F-308s to the Target Hall |
Targets NiO#1(101), Nb#5(85), TaC#1(92), and ZrC#5(81) have been moved from the storage vault and placed in the mini storage. The F-308 flasks have also been moved in to the target hall as well. The attached are the current statuses of both vaults. |
Attachment 1: Vault_Storage_February_3_2014.pdf
|
|
Attachment 2: Mini_Vault_Storage_February_3_2014.pdf
|
|
589
|
Thursday, January 30, 2014, 13:46 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module move |
TM#2 has been moved from the conditioning station to the south hot cell. |