2628
|
Tuesday, July 02, 2024, 11:38 |
Frank Song | ITE/ITW/Storage Area | Standard Operation | | | shielding blocks transfer | 5 shielding blocks have been moved
from ITW to ITE, MAA area has been secured. |
|
2627
|
Thursday, June 27, 2024, 09:49 |
David Wang | North Hot-Cell | Standard Operation | | Nb#10 | Nb#10target has been remotely transferred from NHC to SHC. | Nb#10target has been remotely transferred
from NHC to SHC. |
|
2626
|
Wednesday, June 26, 2024, 13:49 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Tm2 has been moved from SW silo to TCS. | Tm2 has been successfully moved from SW
silo to TCS. |
|
2625
|
Tuesday, June 25, 2024, 12:49 |
Frank Song | ITE | Standard Operation | TM3 | SiC#46 | Module Connection | TM3 with new target SiC#46 was connected
in ITE. |
|
2624
|
Tuesday, June 25, 2024, 11:59 |
David Wang | ITE | Standard Operation | TM3 | SiC #46 | Tm3 has been moved from TCS to ITE. | Tm3 has been moved from TCS to ITE. the
move is smooth. |
|
2623
|
Tuesday, June 25, 2024, 11:59 |
David Wang | ITE | Standard Operation | TM3 | SiC #46 | Tm3 has been moved from TCS to ITE. | Tm3 has been moved from TCS to ITE. the
move is smooth. |
|
2622
|
Monday, June 24, 2024, 14:37 |
Carla Babcock | South Hot-Cell | Development | TM3 | UCx#44 | Inspection of TM3 and UCx#44 after no-protons run | TM3 and UCx#44 ran in ITE but issues with
the cyclotron prevented proton beam delivery.
Nonetheless, the target was heated and provided |
|
2621
|
Wednesday, June 19, 2024, 14:16 |
David Wang | South Hot-Cell | Standard Operation | TM3 | SiC #46 | Tm3 electrical check with SiC#46 target at SHC | Tm3 electrical check with SiC#46 target
and HS line helium spray check at SHC. were
done. everything is good. see attachment. |
|
2620
|
Wednesday, June 19, 2024, 14:11 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | TM3 has been moved from SHC to TCS. | TM3 has been moved from SHC to TCS.The
move is smooth. |
|
2619
|
Wednesday, June 19, 2024, 08:10 |
David Wang | Waste Package/Ship | Development | | | 5 gallon spent target pail, spent target lifting long pole and hook assembly load test | 5 gallon spent target pail, lifting
long pole and hook assembly load test was
done by Rupan, Keyur ,and David. Load |
|
2618
|
Tuesday, June 18, 2024, 15:16 |
Adam Newsome | Crane | Maintenance | | | Pail Handling Tool - Annual Inspection | The pail handling tool which is used to
move 5 gallon pails around the target hall
was inspected by A. Newsome. The main tool |
|
2617
|
Tuesday, June 18, 2024, 15:04 |
Adam Newsome | Spent Target Vault | Maintenance | | | Annual Inspection of Main and Mini Storage Vaults | The annual inspection of the main storage
vault will be skipped this year since extensive
inspection and testing was performed during |
|
2616
|
Tuesday, June 18, 2024, 11:59 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | Tm3 electrical check without target. | Tm3 electrical check without target is
done. Everything is good including 2 x 5
pin connectors( all OL at 250 V to 60 KV |
|
2615
|
Monday, June 17, 2024, 17:24 |
Carla Babcock | ITE | Development | TM3 | UCx#44 | Status of gas system prototype in ITE | A new gas system for FEBIAD operation was
installed in ITE to enable us to use a calibrated
leak which is attached to the target heat |
|
2614
|
Monday, June 17, 2024, 07:36 |
David Wang | ITE | Repair | | | IG1S elbow oring seal and a blabk off cap oring seal beside the elbow were replaced on ITE entrance module top.. | IG1S elbow o ring seal and a blank off
cap o-ring seal beside the elbow were replaced
on ITE entrance module top last Friday. IG1s |
|
2613
|
Friday, June 14, 2024, 16:04 |
Carla Babcock | ITW | Repair | TM4 | UC#45 | Replaced and reinstalled electronics in ITW cage | ITW has been behaving badly at higher voltages
recently, even without protons on. I conditioned
it up to 50kV with heaters off in the TCS |
|
2612
|
Friday, June 14, 2024, 11:56 |
David Wang | ITE | Standard Operation | TM3 | UCx#44 | Tm3 has been moved form ITE to SHC. | Tm3 has been moved form ITE to SHC. the
move is smooth. |
|
2611
|
Friday, June 14, 2024, 11:55 |
David Wang | South Hot-Cell | Standard Operation | TM3 | UCx#44 | TM3 UCx#44 after operation electrical check at SHC | TM3 UCx#44 after operation electrical check
at SHC . see attachment.
Carla: Looks like the short on the |
|
2610
|
Friday, June 14, 2024, 11:18 |
Frank Song | ITE | Standard Operation | TM3 | UCx#44 | module disconnection | TM3 with target UCx#44 was disconnected
in ITE. |
|
2609
|
Thursday, June 13, 2024, 11:44 |
David Wang | Conditioning Station | Repair | TM2 | | Replaced several o ring seals on TM2 service cap. | couple of E-8 to low E-7 atm.cc/sec
leak were found on TM2 service cap top air
to vacuum o rings. Replaced these |
|