  2608   Wednesday, June 12, 2024, 10:18 David WangConditioning StationStandard OperationTM2 TM2 is moved from TCS to silo this morningTM2 is moved from TCS to silo this morning.
The move is smooth. 
  
  2607   Monday, June 10, 2024, 11:02 Frank SongITWStandard OperationTM4UCx#45shielding blocks transfer 5 shielding blocks have been transferred
from ITE to ITW. 
Doc # 181007
  
  2606   Wednesday, June 05, 2024, 11:32 David WangConditioning StationStandard Operation  TCS water system filters have been changed. TCS water system  five filters were
changed yesterday by plant group Dan.T. Service
labels on filters are updated.  No water
  
  2605   Wednesday, June 05, 2024, 11:25 David WangConditioning StationStandard Operation  refilled TCS:TK2 to 27.4 inches. refilled TCS:TK2 to 27.4 inches to compensate
water lost during THC filters change. 
  
  2604   Tuesday, June 04, 2024, 11:44 Carla BabcockSouth Hot-CellDevelopment empty LP FEBIADinvestigation of cathode short on empty LP FEBIADOn May 30 Aaron, Chad and I removed the
empty LP FEBIAD target from the SHC into
the anteroom to attempt to find out the source
 MicrosoftTeams-image_(58).png 
  2603   Thursday, May 30, 2024, 11:08 David WangConditioning StationStandard OperationTM2 TM2 was moved from silo to TCS yesterday morning.TM2 was moved from silo to TCS yesterday
morning. The move is smooth.   
TCS vacuum system was started after. TCS
  
  2602   Tuesday, May 28, 2024, 13:49 Frank SongITWStandard OperationTM4UCx#45Module Connection TM4 with new target UCx#45 was connected
in ITW this morning. pls see attachment uploaded
with.
 TM4_with_UCx#45_connection_in_ITW_20240528.pdf 
  2601   Tuesday, May 28, 2024, 10:13 David WangITWStandard OperationTM4UCx#45Tm4 has been moved from TCS to ITW. Tm4 has been moved from TCS to ITW. 
the move is smooth. 
  
  2600   Tuesday, May 28, 2024, 07:45 David WangConditioning StationStandard OperationTM4UCx#45TCS was argon vented this morning between 6:00 and 7:30am. TCS was argon vented this morning between
6:00 and 7:30am for TM4 moving to ITW.
  
  2599   Friday, May 24, 2024, 08:10 chad fisherSouth Hot-CellStandard OperationTM4UCx#45UCx#45 InstallationOn Wednesday, May 22, 2024 UCx#45 was installed
on TM4 in the SHC. Installation was normal
other then minor issue with the multipin
  
  2598   Thursday, May 23, 2024, 11:10 David WangMAAStandard Operation  BL2A MAA ASU test.MCR Travis Curucz and I finished BL2A MAA
ASU test per document 154779. everything
works fine. Travis kept  the test document.
  
  2597   Thursday, May 23, 2024, 10:59 Frank SongITEStandard OperationTM3UCx#44shielding blocks transfer the five shielding blocks have been
moved from storage area to ITE and is ready
for beam delivery.
  
  2596   Wednesday, May 22, 2024, 12:43 David WangSouth Hot-CellStandard OperationTM4UCx#45electrical check and leak check were done on TM4 UCx#45 target at SHC.electrical check and leak check were done
on TM4 UCx#45 target at SHC.  everything
is ok. See attachment
 Scanned_from_a_Xerox_Multifunction_Printer.pdf 
  2595   Wednesday, May 22, 2024, 12:32 David WangSouth Hot-CellStandard OperationTM4UCx#45TM4 has been moved from SHC to TCS.TM4 has been moved from SHC to TCS. the
move is smooth. 
  
  2594   Tuesday, May 21, 2024, 11:46 David WangITWStandard OperationTM4LP febiad empty. Tm4 has been moved from ITW to SHC.Tm4 has been moved from ITW to SHC. the
move is smooth. 
  
  2593   Tuesday, May 21, 2024, 09:50 David WangITWStandard OperationTM4Lp Febiad emptyTm4 has been disconnected in ITW.Tm4 has been disconnected in ITW per document
141576. Checklist is done.  HS line
is purged.
 TM4_with_Lp-Febiad_empty_target_disconnection_in_ITW_2024-05-21.pdf 
  2592   Wednesday, May 15, 2024, 10:06 Travis CaveSpent Target VaultStandard Operation UC#38,40 Ta#62,63 SiC#44Targets moved to the mini vault. Targets UC#38,40 Ta#62,63 SiC#44
have been moved from the spent target vault
to the mini vault in preparation for F-308
 Mini_Vault_Index_2024-05-15.pdfTarget_Index_2024-05-15.pdf 
  2591   Tuesday, May 14, 2024, 15:27 Carla BabcockITEDevelopmentTM3UCx#44TM3 conditioning and testing in ITETuesday, May 14, 2024, 10:26 :
Ramping up bias/EE/EL on ITE - will
see if the HV cage in the pit can hold 60kV
 Screenshot_from_2024-05-14_10-47-22.png 
  2590   Monday, May 13, 2024, 09:28 David WangITEStandard OperationTM4UCx#44ITE water signal annual interlock check.ITE water signal annual interlock check
is done. Ed helped me on this check. Everything
works normal. 
  
  2589   Friday, May 10, 2024, 09:04 David WangITEStandard OperationTM3UCx#44Tm3 has been connected in ITE. Tm3 has been connected in ITE.  see
attachment.
 Scanned_from_a_Xerox_Multifunction_Printer.pdf 