2381
|
Tuesday, November 01, 2022, 12:37 |
Frank Song | ITW | Standard Operation | TM2 | UCx#39 | disconnection | TM2 with spent target UCx#39 was
disconnected in ITW then moved to NHC. |
|
|
2380
|
Wednesday, October 19, 2022, 12:04 |
Carla Babcock | Conditioning Station | Repair | | | TCS:TBHT taken as replacement for ITE:TBHT | During the last ITE run with the SiC#44
target, the ITE:TBHT controls card was fried
twice. The first time we put in our spare, |
|
|
2379
|
Wednesday, October 19, 2022, 12:00 |
Carla Babcock | North Hot-Cell | Standard Operation | TM4 | SiC#44 | PIE on SiC#44 | Conducted PIE on SiC#44, which failed online.
It had a cathode short, a target short and
an anode short by the time we called the |
|
|
2378
|
Monday, October 17, 2022, 08:07 |
David Wang | ITE/ITW | Repair | TM4 | | A small leak on target station secondaryvacuum back up line by ITH MP1S. |
A small leak in target station |
|
|
2377
|
Thursday, October 13, 2022, 09:32 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#44 | Spent Target Move | Spent target move done. The SiC#44
was moved from the north hot cell to the
spent target vault. It was placed in pail#275 |
|
|
2376
|
Tuesday, October 11, 2022, 12:39 |
Frank Song | ITE | Standard Operation | TM4 | C#4 | Module Connection | TM4 with Target C#4 was connected
in ITE. |
|
|
2375
|
Friday, October 07, 2022, 14:46 |
Adam Newsome | South Hot-Cell | Development | | | Addition of lift table to E-stop circuit | A modification was made to integrate the
hot cell's lift table into the E-stop circuit.
See work permit I2022-10-07-1 |
|
|
2374
|
Wednesday, October 05, 2022, 09:31 |
David Wang | Conditioning Station | Standard Operation | TM4 | C#4 | HS line helium pressure test. TM4 with C#4 at TCS. | TM4 HS line helium pressure test is done.
70psi helium pressure@ 3XE-8 atm.cc/sec .
No leak. |
|
|
2373
|
Tuesday, October 04, 2022, 07:19 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | C#4 | electrical check | an electrical was done for TM4 with
target C#4 installed on NHC. |
|
|
2372
|
Monday, October 03, 2022, 14:58 |
Matthew Gareau | North Hot-Cell | Repair | TM4 | SiC#43 and C#4 | Loose multipin guide pin | Today while I was removing the SiC#43
it was noticed that the multipin guide pin
was loose. |
|
|
2371
|
Monday, October 03, 2022, 14:28 |
Keith C Ng | Assembly/Bench Test | Maintenance | | | ITA2826 rev E assembly | A fully built steerer sub assembly ITA2826
revision E was boxed and sealed and put on
rack storage in ISAC B2 South Hot Cell area. |
|
|
2370
|
Monday, October 03, 2022, 09:42 |
Frank Song | ITE | Standard Operation | TM4 | Sic#44 | module disconnection | TM4 with SiC@44 was disconnected
in ITE. |
|
|
2369
|
Wednesday, September 28, 2022, 13:15 |
Matthew Gareau | North Hot-Cell | Maintenance | | | topped up the NHC window oil through the oil expansion tank | Myself and Maico were able to top up the
NHC window oil.
The oil was filled through the expansion |
|
|
2368
|
Wednesday, September 28, 2022, 12:58 |
Matthew Gareau | North Hot-Cell | Repair | | | Chad repaired the right operator side manipulator | On 26/Sept/2022
Chad disassembled the right operator
side manipulator, and noticed that gears |
|
|
2367
|
Thursday, September 15, 2022, 11:25 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#38 | Spent Target Move | The spent target UC#38 was packed
into pail #274 and placed in spot 1A of the
vault. It was 33.3mSv/hr when removed from |
|
|
2366
|
Wednesday, September 14, 2022, 13:45 |
Adam Newsome | Spent Target Vault | Development | | | Storage Vault: cable replaced and e-chain upgrade | The motor cable for the storage vault was
replaced as the old one was showing signs
of wear. The U-track that the old cable ran |
|
|
2365
|
Tuesday, September 13, 2022, 14:10 |
Frank Song | ITW | Standard Operation | TM2 | UCx#39 | Module Connection | TM2 with UCx#39 is connected in ITW. |
|
|
2364
|
Thursday, September 08, 2022, 09:06 |
David Wang | Conditioning Station | Standard Operation | TM2 | UCx#39 | HS line helium pressure test. | TM2 with UCX#39 HS line helium pressure
test is done at TCS. 70 psi helium 3minutes.
No leak @0.0XE-9 atm.cc/sec. |
|
|
2363
|
Thursday, September 08, 2022, 07:20 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#39 | electrical check | An electrical check was done on NHC
yesterday. |
|
|
2362
|
Tuesday, September 06, 2022, 14:05 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#38 | electrical check after disconnection | An electrical was done on the NHC
for TM2 with spent Target UCx#38 on |
|