  2288   Tuesday, January 11, 2022, 11:50 David WangITWMaintenance   ITW Exit module 1 side sqaure panel O-ing seal replacement.Frank and I replaced ITW Exit module 1
side square service panel o-ring seal. Also,
The target module pit top flange o-ring seal
  
  2287   Monday, January 10, 2022, 12:38 David WangNorth Hot-CellStandard OperationTM2 TM2 has been moved from ITW to NHC.Travis and Nadia moved TM2 from ITW to
NHC this morning. The move is smooth and
successful.
  
  2286   Monday, January 10, 2022, 09:31 David WangITEStandard OperationTM4 ITE primary and secondary vacuum vessel leak check. ITE primary and secondary  vacuum
vessel leak check has been down.  Base
leak rate 0.0x E-9 atm.cc/sec on LD. Only
  
  2285   Thursday, January 06, 2022, 13:54 David WangITEStandard OperationTM4 helium pressure test on TM4 internal cooloing lsine at ITE.Helium pressure 70 psi. 3 minutes on each
circle untill LR on LD is balanced. Base
leak rate on LD:0.0xE-9 atm.cc/sec.  
  
  2284   Thursday, January 06, 2022, 10:37 David WangITWStandard OperationTM2 ITW vacuum vessel and TM2 internal cooling lines leak check in pit. Frank  and I finished ITW and TM2 leak
check. TM2 internal water-cooling lines 
are leak free. They passed 70 psi helium
  
  2283   Wednesday, January 05, 2022, 12:45 Frank SongITWMaintenanceTM2UC#36TM2 SIS with Target and No external Connections electrical checked in ITW  TM2_with_UCx36.jpg 
  2282   Wednesday, January 05, 2022, 09:38 Frank SongITEMaintenanceTM4Ta #63TM4 SIS with Target and No external Connections electric check done in ITE.   tm4_with_Ta#63.jpg 
  2281   Tuesday, November 30, 2021, 12:51 David WangITEStandard OperationTM4Ta#63.Tm4 has been connected in ITE. TM4 has been connected in ITE. See attachment
for checklist.
 from_my_cellphone_2598_647.jpgfrom_my_cellphone_2598_648.jpgfrom_my_cellphone_2598_649.jpgfrom_my_cellphone_2598_650.jpg 
  2280   Tuesday, November 30, 2021, 11:03 David WangITEStandard OperationTM4Ta#63.Remotely remove TM4(Ta#63) from TCS to ITE.Remotely remove TM4(Ta#63) from TCS to
ITE. The move is smooth and successful. 
  
  2279   Monday, November 29, 2021, 12:16 David WangSpent Target VaultStandard Operation  Five spent targets have been loaded into F308sWe loaded UCx #29 , SiC #38  , Ta#53,
Ta#56 ,and Ta#57 from mini storage 
into F308 flasks.  Later, the flasks
  
  2278   Friday, November 26, 2021, 10:52 Adam NewsomeSpent Target VaultStandard Operation UC#35Spent Target MoveThe spent UC#35 target has been moved from
the south hot cell to the  spent target vault.
It was placed in pail #264 and put in spot
 Target_Index_2021-11-26.pdf 
  2277   Thursday, November 25, 2021, 10:33 David WangConditioning StationStandard OperationTM4Ta#63. helium pressure test on TM4 HS line at TCS. Helium pressure test on TM4 HS line at
TCS is done.  LD base leak rate 0.0
xE-9 atm.cc/sec. Helium pressure 70psi. HS
  
  2276   Wednesday, November 24, 2021, 09:08 Adam NewsomeConditioning StationStandard OperationTM4 Remotely moved TM4 from SHC to TCSTM4 was moved from the South Hot Cell to
the Conditioning Station. 
  
  2275   Wednesday, November 24, 2021, 07:17 Frank SongSouth Hot-CellStandard OperationTM4Ta #63TM4 SIS with Target and No external Connectionsthe TM4 with new target Ta #63 installed
in SHC and an electric check was made by
David. 
 IMG_4469.JPG 
  2274   Tuesday, November 23, 2021, 10:58 Adam NewsomeSouth Hot-CellStandard OperationTM4 TM4 MoveTM4 was moved from ITE to SHC. Shield plug
installed in ITE. 
  
  2273   Tuesday, November 23, 2021, 10:46 Frank SongITEStandard OperationTM4UCx#35module disconnection the TM4 with UCx#35 was disconnected
in ITE.
 IMG_4456_(2).JPG 
  2272   Monday, November 22, 2021, 12:44 Adam NewsomeCraneRepair  Crane PLC Fault: 0004hAn issue was observed in which the target
hall crane was not functioning: the N-E-S-W
and up/down motions did not work, however
 Fault_code_when_connecting_Nov_22_2021.png 
  2271   Friday, November 19, 2021, 12:48 Adam NewsomeSouth Hot-CellDevelopment  Vertical motion limit switch installationA rotary limit switch was installed, attached
to the shaft adjacent to the drive motor
for the vertical drive system. This limit
 PXL_20211119_172142852.jpg 
  2270   Thursday, November 18, 2021, 09:47 Travis CaveSpent Target VaultStandard Operation SiC#38 and UC#29Spent Target Move The spent targets SiC#38 and UC#29
have been removed from the spent target vault
and placed into the mini storage. See attached
 Target_Index_2021-11-18.pdfTarget_Index_2021-11-18_mini_vault.pdf 
  2269   Wednesday, November 17, 2021, 11:42 Travis CaveSpent Target VaultStandard Operation Ta#57Repacking of the targets. Ta#57 was repacked and placed in
the mini vault. The pail was changed from
#174 to #263. See attached PDF for more details.
 Target_Index_2021-11-17.pdfTarget_Index_2021-11-17_mini_vault.pdf 