235
|
Friday, January 18, 2013, 09:10 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | CS Test Target #1 | Electrical check | Electrical check performed on the CS Test
Target #1 at the south hot cell. See PDF
for details. |
|
234
|
Thursday, January 17, 2013, 11:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | | module move | TM#4 has been moved from the SW silo to
the south hot cell, move went well. |
|
233
|
Thursday, January 17, 2013, 10:06 |
chad fisher | South Hot-Cell | Standard Operation | | | SiC Test Target for TM4/CS | I have inserted the test target for TM4
and the CS into the hot cell.
I had some concerns about the condition |
16x |
232
|
Tuesday, January 15, 2013, 14:37 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#3 | Spent target move | TiC #3 was moved from the south hot cell
in to the vault storage today, it was placed
in slot 4B and was in pail #104, it had a |
|
231
|
Tuesday, January 15, 2013, 10:49 |
David Wang | ITW | Standard Operation | TM1 | no target | TM1 vacuum system connection in ITW | I connected TM 1 vacuum system in ITW.
The TM1 and ITW will be pumped out for shut
down routine leak check. |
|
230
|
Monday, January 14, 2013, 14:09 |
Travis Cave | ITW | Standard Operation | TM1 | no target | module move | TM#1 has been moved from the south hot
hell to the west target station, move went
well. |
|
229
|
Thursday, January 10, 2013, 10:40 |
David Wang | ITW | Maintenance | | | Replaced all high active water system magnetic pedal wheels in ITW and ITE. | I replaced all high active water system
magnetic pedal wheels in ITW and ITE. This
is a preventive maintenance job we planned |
|
228
|
Tuesday, January 08, 2013, 14:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Electrical check | TM#1 was electrically check with out a
target see attached PDF for results. |
|
227
|
Tuesday, January 08, 2013, 08:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | TiC#3 | Electrical check | TM#1 with TiC #3 post beam. See attached
PDF for results. |
|
226
|
Thursday, January 03, 2013, 10:05 |
David Wang | ITW | Standard Operation | TM1 | | Disconnected TM1 in ITW. | TM1 has been disconnected in ITW. All
water lines had been purged. Travis was with
me during the job. |
|
225
|
Wednesday, January 02, 2013, 12:11 |
David Wang | ITW | Standard Operation | TM1 | | I moved 5 shielding blocks from ITW to block storage area | I moved 5 shielding blocks from ITW
to block storage area for preparing the TM1
disconnection. Air sampled and swiped blocks |
|
224
|
Thursday, December 06, 2012, 08:57 |
Travis Cave | Spent Target Vault | Standard Operation | | UCx#5 | Spent target move | UCx #5 has been moved from the south hot
cell to the storage vault. It is in Pail
102, in spot 2A of the vault and had a field |
|
223
|
Wednesday, December 05, 2012, 15:53 |
Anders Mjos | South Hot-Cell | Standard Operation | | UCx#5 | Target inspection - target tube broken | The target was inspected today.
It was found that the target tube
had broken on both sides of the centre block |
|
222
|
Wednesday, December 05, 2012, 13:26 |
Grant Minor | South Hot-Cell | Standard Operation | TM4 | N/A | TM4 moved from SHC to South West Silo | TM4 was successfully moved from the South
Hot Cell to the South-West Silo remotely
by Grant Minor, with help from David Wang |
|
221
|
Tuesday, December 04, 2012, 14:20 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#5 | UCx#5 Removal | UCx #5 has been removed from TM4. The left
oven leg is indeed broken.
Target has been placed in a pail |
|
220
|
Tuesday, December 04, 2012, 13:33 |
David Wang | ITE | Standard Operation | TM4 | UCX#5 | Disconnected TM4 in ITE. | I disconnected TM4 in ITE. All water lines
had been purged.Travis was with me . |
|
219
|
Tuesday, December 04, 2012, 13:27 |
Travis Cave | ITE | Standard Operation | TM4 | UCx#5 | module move & electrical check | TM#4 with UC#5 has been moved from east
target station to the south hot cell move
went well. Also the electrical check |
|
218
|
Monday, December 03, 2012, 19:34 |
Grant Minor | ITE | Standard Operation | TM4 | LpUCx | Argon supply opened for ITE vent | Around 7pm tonight I opened the main valve
approximately 1.5 turns on the Argon bottle
used for venting ITE, located in the ISAC |
|
217
|
Wednesday, November 21, 2012, 09:36 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target move | On Nov 20th the 5 targets in mini storage
have been moved to the F-308s, those F-308s
have since been moved to the hot cell ante |
|
216
|
Wednesday, November 14, 2012, 11:51 |
Travis Cave | Spent Target Vault | Standard Operation | | | Moving the spent targets to mini storage. | Five spent targets have been moved from
the storage vault to the mini storage vault.
The five targets are as follows: SiC #25, |
|