  1995   Tuesday, October 01, 2019, 14:38 Travis CaveSouth Hot-CellStandard OperationTM2Ta#59Electrical Check The results of the electrical check
on TM#2 with the Ta#59 target and without
before the target was mounted on the module.
 TM2_no_target_SHC_elec_chk_Oct-1-2019.pdfTM2_Ta59_SHC_elec_chk_Oct-1-2019.pdf 
  1994   Tuesday, October 01, 2019, 10:22 chad fisherSouth Hot-CellStandard OperationTM2ZrC#8ZrC#8 Removed Ta#59 installedZrC#8 has been removed from TM2. Upon removal
of the high current tube heater bolts it
was noticed that the tube was broken. Also
 20190930_140918[1].jpg 
  1993   Tuesday, October 01, 2019, 09:23 Don JacksonITEMaintenanceTM2ZrC #860KV Common Connections1 Jumpers between 60KV common and FEBIAD
lines were connected in an unusual way. 
This should of had no impact on the ZrC run
 TM2_Wiring.jpg 
  1992   Monday, September 30, 2019, 14:05 Travis CaveSouth Hot-CellStandard OperationTM2ZrC#8Electrical Check Results of the electrical check on
TM#2 with ZrC#8 post beam.
 TM2_elec_chk_ZrC8_post_beam_SHC_09-30-2019.pdf 
  1991   Monday, September 30, 2019, 11:36 Travis CaveSouth Hot-CellStandard OperationTM2ZrC#8Module move TM#2 with ZrC#8 has been moved from
the east station to the south hot cell.
  
  1990   Monday, September 30, 2019, 11:27 Isaac EarleSafe Module ParkingDevelopment  SMP vacuum vessel modifications completedThe SMP vacuum vessel welds were reinforced
to match the specifications on IRH1710 Rev
D.  In addition a tube stub was added
  
  1989   Monday, September 23, 2019, 13:21 Travis CaveSpent Target VaultStandard Operation  Repacking of the targets. All targets in the mini vault have
been repackaged and are now ready to be loaded
into F-308s. All the target pails have new
 Target_Index_2019-09-23_Mini_Vault.pdf 
  1988   Thursday, September 19, 2019, 10:11 Travis CaveSpent Target VaultStandard Operation  Repacking of the targets. Another target in the mini storage
has been repackaged into the new pails. With
one remaining to do which will be done on
  
  1987   Wednesday, September 18, 2019, 14:28 Travis CaveSpent Target VaultStandard Operation  Repacking of the targets. Three of the five targets in the
mini storage have been repackaged into the
stronger pail.
  
  1986   Tuesday, September 17, 2019, 07:37 Carla BabcockITEDevelopmentTM2ZrC#8end of run HV investigationsRamping up HV to ~30kV, encountered problems
and had to drop back to 28kV. No response
on IG1 or anything else during sparks. Lots
 HVtests_TM2_Sept172019.xlsx 
  1985   Friday, September 13, 2019, 13:36 David WangITWStandard OperationTM4UCX27TM4 conenction in ITW checklistTM4 was connected in ITW this Tuesday.
See attachment for checklist.
 TM4_UCx27_connection_checklist.pdf 
  1984   Thursday, September 12, 2019, 09:26 David WangITWRepairTM4 ITW bad vacuum issue and trouble shoot.ITW secondary vacuum was bad in last two
days after TM4 was connected in ITW. Today
when check the exit 2 module, I found a small
  
  1983   Tuesday, September 10, 2019, 14:04 David WangITWStandard Operation  ITW water interlock check.ITW water interlock check is finished.
Everything is good. 
  
  1982   Tuesday, September 10, 2019, 10:10 Adam NewsomeITWStandard OperationTM4UC#27TM4 MoveTM4 has been moved from the Conditioning
Station to ITW with UC#27 target.
  
  1981   Tuesday, September 10, 2019, 08:25 David WangConditioning StationStandard OperationTM4UCx27Argan vent TCS.TCS is argon vented. TM4 is disconnected
at TCS. 
  
  1980   Monday, September 09, 2019, 06:38 David WangConditioning StationStandard OperationTM4UCx27HS and window line leak check.TM4 HS and window line are helium pressure
checked at TCS. 70 psi helium 5 minutes.
No response @1.2XE-8 atm.cc/sec. They are
  
  1979   Thursday, September 05, 2019, 14:26 Travis CaveSouth Hot-CellStandard OperationTM4UC#27Electrical Check The results of the electrical check
of TM#4 with UC#27 attached to it.
 TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf 
  1978   Thursday, September 05, 2019, 14:26 Travis CaveSouth Hot-CellStandard OperationTM4UC#27Electrical Check The results of the electrical check
of TM#4 with UC#27 attached to it.
 TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf 
  1977   Thursday, September 05, 2019, 14:18 Adam NewsomeSouth Hot-CellStandard OperationTM4UCx#27TM4 MoveTM4 with UCx#27 target has been moved from
the South Hot-Cell to the Conditioning Station.
  
  1976   Thursday, September 05, 2019, 11:37 chad fisherSouth Hot-CellStandard OperationTM4UCx#27UCx#27 installDummy Ta target has been removed from TM4
and UCx#27 installed
  