1948
|
Tuesday, July 09, 2019, 09:15 |
Carla Babcock | Conditioning Station | Repair | TM4 | Dummy HP SIS target | Conditioning TM4 w/ new ST up to 45kV | Left TM4 at 40kV overnight with no previous
heating. There was only one real spark which
turned off TP2 but ops turned it back on. |
|
1947
|
Monday, July 08, 2019, 14:56 |
Carla Babcock | Conditioning Station | Repair | TM4 | Dummy HP SIS target | First TM4 conditioning with new source tray | Ramping up TM4 with new source tray in.
Current condition: new source tray but no
water running in lines B, D or window. Multipin |
|
1946
|
Thursday, July 04, 2019, 08:57 |
Isaac Earle | Safe Module Parking | Development | | | SMP vacuum system installed | July 3:
- Assembled exhaust line flexible
hose and fittings as per ISK0529 Rev D then |
|
1945
|
Friday, June 21, 2019, 07:16 |
David Wang | South Hot-Cell | Development | TM4 | | TM4 new source tray leak check at SHC. | New source tray was installed on TM4 yesterday.
LD was used to pump down all water lines.
Tube heater +D circuit has a big leak |
|
1944
|
Thursday, June 20, 2019, 15:09 |
Isaac Earle | Safe Module Parking | Development | | | SMP motor wiring inspected by electrician | The AC wiring for the SMP motor was inspected
by Randy Boehm (TRIUMF electrician) as recommended
by Franco Mammarella (TRIUMF electrical engineer). |
|
1943
|
Friday, June 14, 2019, 08:15 |
David Wang | ITE | Standard Operation | TM2 | | 5 shielding blocks are moved to ITE. | ITE is configured to take proton beam. |
|
1942
|
Thursday, June 13, 2019, 10:55 |
David Wang | Conditioning Station | Repair | TM4 | | TM4 HV test at TCS without source tray. | I brought up TCS bias to 57.5 KV on TM4
without source tray at TCS. It was kept at
this level about 1.0 hours. Some intermediate |
|
1941
|
Thursday, June 13, 2019, 09:09 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target and no source tray | Module move | TM#4 has been moved from the conditioning
station to the south hot cell. The module
has no source tray. |
|
1940
|
Wednesday, June 12, 2019, 08:56 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | More TM4 conditioning without source tray | The conditioning station was ramped down
overnight and David ramped it back up this
morning. Currently trying to get it to sit |
|
1939
|
Monday, June 10, 2019, 18:12 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | Attempt to push bias > 56kV | Monday, June 10, 2019, 16:59 : TM4 back
up to BIAS / EL = 56.1kV / 29.5kV
Monday, June 10, 2019, 17:14 : After |
|
1938
|
Monday, June 10, 2019, 16:22 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | Ramping V on TM4, no HV cover in TH | Ramped down the bias so David could remove
the HV cover and lock out the target hall.
Ramped back up to BIAS / EL = 50kV |
|
1937
|
Monday, June 10, 2019, 14:13 |
Travis Cave | Spent Target Vault | Standard Operation | | | Old TM#4 source tray moved | The old TM#4 source tray in the south
hot cell was moved to the spent target vault.
The tray had a low of 7.5mSv/hr to a high |
|
1936
|
Monday, June 10, 2019, 08:26 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | Ramping voltage on TM4 w/o source tray | TM4 in conditioning station with no source
tray, extraction electrode set to HV bias.
Brought up to 30kV over the weekend by ISAC |
|
1935
|
Friday, June 07, 2019, 13:11 |
David Wang | Conditioning Station | Development | TM4 | | TCS and TM4. | TM4 has been connected at TCS for HV test.
TCS water system and vacuum pumps are switched
on. |
|
1934
|
Friday, June 07, 2019, 08:56 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | no target | Module move | TM#4 has been moved from the south
hot cell to the conditioning station. |
|
1933
|
Thursday, June 06, 2019, 10:01 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target, no source Tray | Electrical Check | Results from the electrical check
of TM#4 at the south hot cell with no source
tray. R&U are shorted and when meggered |
|
1932
|
Tuesday, June 04, 2019, 08:46 |
David Wang | ITE | Standard Operation | TM2 | | ITE water signal interlock check. | ITE water signal interlock check is done.
Everything is good. Coil 2 circuit
no longer used in ITE . PQRU are looped as |
|
1931
|
Friday, May 24, 2019, 09:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Module move | TM#4 has been moved from the south
west silo to the south hot cell. |
|
1930
|
Thursday, May 23, 2019, 11:22 |
Travis Cave | South Hot-Cell | Maintenance | | | Removing garbage from the south hot cell. | A 55 Gal. drum was remotely lowered
into the south hot cell. It was then filled
with compressable waste. Then the drum was |
|
1929
|
Thursday, May 23, 2019, 08:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Module move | TM#1 has been moved from the south
hot cell to the northwest silo. |
|