  1841   Tuesday, December 18, 2018, 11:13 Isaac EarleNorth Hot-CellDevelopment  NHC manipulator slave-end swap, RH test, and various other workThe following
North Hot Cell work was completed over the
last week under work permit I2018-12-12-1:
  
  1840   Tuesday, December 11, 2018, 14:35 Anders MjosITEStandard OperationTM4UC#26Block moveBlocks were moved from ITW to ITE by Frank
and David. ITE water flow to dump was re-opened
(ITW remains open). A dose badge was installed
  
  1839   Monday, December 10, 2018, 15:31 Isaac EarleNorth Hot-CellDevelopment  NHC remote connection testing with manipulators The following tests have been successfully
completed using the NHC manipulators:

    Ventilation pre-filter
  
  1838   Friday, December 07, 2018, 10:37 chad fisherNorth Hot-CellRepair  Ariel connector testCompleted testing of connectors for Ariel
using the north hot cell.
Video can be found on docushare;
  
  1837   Friday, December 07, 2018, 08:47 chad fisherNorth Hot-CellRepair  North hot cell spare slave repairThe tong cable on the spare north hot cell
slave has been repaired. Slave came from
the factory with the tong cables straddling
 20181207_083906.jpg 
  1836   Tuesday, December 04, 2018, 12:36 David WangITEStandard OperationTM4UCx 26.TM4 has been connected in ITE/ Checklist.TM4 has been connected in ITE. See attachment
for connection checklist
 UCx26_TM4_connection_checklist.pdf 
  1835   Tuesday, December 04, 2018, 10:26 Travis CaveITEStandard OperationTM4UC#26Module move TM#4 with UC#26 has been moved from
the conditioning station to the east target
station.
  
  1834   Friday, November 30, 2018, 10:28 Travis CaveSpent Target VaultStandard Operation Ta#57Spent Target Move The spent Ta#57 target has been moved
from the south hot cell to the spent target
storage it was placed in pail 174 and placed
 Target_Index_2018-11-30.pdf 
  1833   Thursday, November 29, 2018, 06:38 David WangSouth Hot-CellStandard OperationTM4 Leak check TM4 UCx 26 at SHC.Chad and I did a leak check on TM4 HS line
with UCx 26# installed . Base LR 0.0X E-9
atm.cc/sec. Base pressure 0.0XE-4 torr. 
  
  1832   Wednesday, November 28, 2018, 13:38 Travis CaveConditioning StationStandard OperationTM4UC#26Module move TM#4 with UC#26 has been moved from
the south hot cell to the conditioning station.
  
  1831   Wednesday, November 28, 2018, 11:31 Travis CaveSouth Hot-CellStandard OperationTM4Ta#57 and UC#26Electrical Check Electrical check of TM#4 with the
old Ta#57, no target and with new IG-LIS
UC#26 target. See attached PDF for details.
 Elec_Chk_Ta57_Post_Beam_SHC_11-28-28.pdfElec_Chk_TM4_no_tgt_SHC_11-28-18.pdfElec_Chk_UC26_SHC_11-28-18.pdfElec_Chk_UC26_IGLIS_part_SHC_11-28-18.pdf 
  1830   Wednesday, November 28, 2018, 07:04 David WangITEDevelopmentTM4LpTa 56New high current flexible cables inspection after LpTa#56 beam run.Inspected new high current flexible cables
during TM4 disconnection. The new cables
and adapters work fine.
 new_flexibble_cable_in_ITE_after_Ta#56_run_001.JPGnew_flexibble_cable_in_ITE_after_Ta#56_run_004.JPG 
  1829   Wednesday, November 28, 2018, 06:39 David WangConditioning StationStandard Operation  Disconnection checklist LpTa #56TM4 was disconnected in ITE. Checklist
list in attachment.
 LpTa#56_disconnection_checklist.pdf 
  1828   Tuesday, November 27, 2018, 13:31 chad fisherSouth Hot-CellStandard OperationTM4Ta#57Ta#57 removalTa#57 has been removed from TM4.   
  1827   Tuesday, November 27, 2018, 11:05 Travis CaveSouth Hot-CellStandard OperationTM4Ta#57Module move TM#4 with Ta#57 has been moved from
the east target station to the south hot
cell.
  
  1826   Monday, November 26, 2018, 12:19 chad fisherNorth Hot-CellRepair  East ManipulatorIn preparation for removing the slave for
replacement I discovered that the timing
screw in the handle cable drum (master side)
 20181126_113326.jpg20181126_113338.jpg 
  1825   Thursday, November 22, 2018, 14:38 Isaac EarleNorth Hot-CellDevelopment  NHC design approved by High Voltage EngineerTo satisfy RS 101 from the NHC requirements
specification (Document-131915) Tomislav
Hurskovec was consulted regarding high voltage
 NHCHV.pdf 
  1824   Thursday, November 22, 2018, 08:55 Anders MjosITWRepairTM2UC#25ITW:FC5 safety signal limit switch installedYesterday Diagnostics group installed a
temporary external limit switch to provide
the in signal to the safety system.
 FC5_limit_switch.jpg 
  1823   Thursday, November 22, 2018, 08:53 Anders MjosITWStandard OperationTM2UC#25Block moveFrank and Anders moved blocks from ITE
to ITW yesterday
  
  1822   Thursday, November 22, 2018, 08:52 Anders MjosITEStandard OperationTM4Ta#57Closed ITE dump waterPaddle wheel signal was tripping proton
beam in ITW. Valved off ITE dump to divert
flow to ITW. Field around valve was about
  