1848
|
Tuesday, January 08, 2019, 08:49 |
David Wang | ITW | Standard Operation | TM2 | | TP1 TP1 have been disconnected in ITW | Started argon venting of ITW now. |
|
1847
|
Friday, January 04, 2019, 14:38 |
Isaac Earle | North Hot-Cell | Development | | | NHC cameras tested | The NHC module support flange cameras (4
total) as well as the NHCSA camera were tested
today and confirmed to be working properly. |
|
1846
|
Friday, January 04, 2019, 08:48 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been disconnected in ITW. | TP1, TP2 are still connected for next week
leak check. All water lines in TM2 are purged
with 80 psi air, each for 5 minutes. |
|
1845
|
Thursday, January 03, 2019, 13:41 |
David Wang | Crane | Repair | | | Target hall crane PLC issue. | Target hall crane did not work properly
after power outage during Christmas time.
The only movement could be operated is crane |
|
1844
|
Thursday, January 03, 2019, 13:30 |
David Wang | ITW | Repair | | | ITH:MP1 | ITH:MP1 inlet pressure showed 10torr after
power outage during holiday. All ITE/W turbo-pumps
were tripped because of it. Removed one shielding |
|
1843
|
Wednesday, January 02, 2019, 10:26 |
Anders Mjos | Conditioning Station | Standard Operation | | | Restarrted TP1S | Found pumps off after the holidays. Restarted
roughing pump and TP1S |
|
1842
|
Wednesday, December 19, 2018, 14:41 |
Anders Mjos | Conditioning Station | Standard Operation | | No target | Installed Shield Block on TCS | Frank and Anders installed lid on TCS and
started vacuum system yesterday. To run over
the Holidays. Retrieved dose badge from operational |
|
1841
|
Tuesday, December 18, 2018, 11:13 |
Isaac Earle | North Hot-Cell | Development | | | NHC manipulator slave-end swap, RH test, and various other work | The following
North Hot Cell work was completed over the
last week under work permit I2018-12-12-1: |
|
1840
|
Tuesday, December 11, 2018, 14:35 |
Anders Mjos | ITE | Standard Operation | TM4 | UC#26 | Block move | Blocks were moved from ITW to ITE by Frank
and David. ITE water flow to dump was re-opened
(ITW remains open). A dose badge was installed |
|
1839
|
Monday, December 10, 2018, 15:31 |
Isaac Earle | North Hot-Cell | Development | | | NHC remote connection testing with manipulators | The following tests have been successfully
completed using the NHC manipulators:
Ventilation pre-filter |
|
1838
|
Friday, December 07, 2018, 10:37 |
chad fisher | North Hot-Cell | Repair | | | Ariel connector test | Completed testing of connectors for Ariel
using the north hot cell.
Video can be found on docushare; |
|
1837
|
Friday, December 07, 2018, 08:47 |
chad fisher | North Hot-Cell | Repair | | | North hot cell spare slave repair | The tong cable on the spare north hot cell
slave has been repaired. Slave came from
the factory with the tong cables straddling |
|
1836
|
Tuesday, December 04, 2018, 12:36 |
David Wang | ITE | Standard Operation | TM4 | UCx 26. | TM4 has been connected in ITE/ Checklist. | TM4 has been connected in ITE. See attachment
for connection checklist |
|
1835
|
Tuesday, December 04, 2018, 10:26 |
Travis Cave | ITE | Standard Operation | TM4 | UC#26 | Module move | TM#4 with UC#26 has been moved from
the conditioning station to the east target
station. |
|
1834
|
Friday, November 30, 2018, 10:28 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#57 | Spent Target Move | The spent Ta#57 target has been moved
from the south hot cell to the spent target
storage it was placed in pail 174 and placed |
|
1833
|
Thursday, November 29, 2018, 06:38 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | Leak check TM4 UCx 26 at SHC. | Chad and I did a leak check on TM4 HS line
with UCx 26# installed . Base LR 0.0X E-9
atm.cc/sec. Base pressure 0.0XE-4 torr. |
|
1832
|
Wednesday, November 28, 2018, 13:38 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#26 | Module move | TM#4 with UC#26 has been moved from
the south hot cell to the conditioning station. |
|
1831
|
Wednesday, November 28, 2018, 11:31 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#57 and UC#26 | Electrical Check | Electrical check of TM#4 with the
old Ta#57, no target and with new IG-LIS
UC#26 target. See attached PDF for details. |
|
1830
|
Wednesday, November 28, 2018, 07:04 |
David Wang | ITE | Development | TM4 | LpTa 56 | New high current flexible cables inspection after LpTa#56 beam run. | Inspected new high current flexible cables
during TM4 disconnection. The new cables
and adapters work fine. |
|
1829
|
Wednesday, November 28, 2018, 06:39 |
David Wang | Conditioning Station | Standard Operation | | | Disconnection checklist LpTa #56 | TM4 was disconnected in ITE. Checklist
list in attachment. |
|