  RH-ISAC, Page 129 of 138  Not logged in ELOG logo
  ID Date Author Category Type Module Target/Number Subject Text Attachments
  198   Wednesday, October 24, 2012, 11:53 Travis CaveSpent Target VaultStandard Operation NiO#1Spent target moveThe NiO #1 spent target was placed into
storage today. It is in pail number 01 (101
on Vault Status page) and located in slot
 Vault_Storage_October_24_2012.pdf 
  197   Wednesday, October 24, 2012, 11:51 Travis CaveITEStandard OperationTM4UCx#5module movedYesterday TM#4 with UCx#5 was moved to
the east target station from the conditioning
station,  move went well.
  
  196   Tuesday, October 16, 2012, 07:14 David WangConditioning StationStandard OperationTM4UCX#5TM4 heat shield helium pressure test and electrical check at CSTM4 heat shield helium pressure test and
electrical check were done  at CS 
last week. The results are good. NO leak
  
  195   Tuesday, October 09, 2012, 14:53 Bevan MossConditioning StationDevelopmentTM4UCx#5Module MoveTM4 was remote moved from the SCH to the
TCS today. This was the first time the module
was moved with the framework for the cage
  
  194   Tuesday, October 09, 2012, 13:44 chad fisherSouth Hot-CellStandard OperationTM4UCx#5NiO#1 removal UCx#5 installationNiO#1 was removed this morning.
UCx#5 was inserted into the hot cell
around 1 pm, installed and leak checked and
 IMG_0780[1].JPG 
  193   Tuesday, October 09, 2012, 11:17 Bevan MossITEStandard OperationTM4NiO#1Module Move TM4 with NiO#1 was moved from ITE
to the SHC today. The move went well with
no issues.
  
  192   Tuesday, October 09, 2012, 10:35 David WangITEStandard OperationTM4NiO #1Disconnected TM4 in ITE.I disconnected TM4 in ITE this morning.
The heat shield circuit has been purged with
air.
  
  191   Thursday, October 04, 2012, 11:06 David WangConditioning StationRepair  Replace conditioning station scroll pump in target hallGrant and I replaced the conditioning station
broken  srcoll pump with a refurbished
scroll pump which is supplied by vacuum group.
  
  190   Tuesday, October 02, 2012, 11:47 David WangITWStandard OperationTM1Nb#7I moved 5 shielding blocks from ITE to ITW.5 shielding blocks have been moved from
ITE to ITW. ITW is configured to take proton
beam now.
  
  189   Thursday, September 27, 2012, 09:13 David WangITERepairTM4 ITE MSP water circuit flow wheel had been replaced ITE MSP water circuit flow wheel was replaced
yesterday due to poor performance. 
  
  188   Tuesday, September 25, 2012, 14:33 David WangITWStandard OperationTM1Nb#7TM1connected in ITWTM 1 is in ITW now. All connections are
done. The turbo pumps had been started  this
afternoon. The vacuum looks good so far.
  
  187   Tuesday, September 25, 2012, 10:34 Travis CaveITWStandard OperationTM1Nb#7module moveTM#1 with Nb#7 moved from the conditioning
station to the west target station. Move
went well.
  
  186   Thursday, September 20, 2012, 09:16 David WangConditioning StationStandard OperationTM1Nb#7TM1 Nb#7 target heat shield helium pressure check is done.Leak detector pumped down to base LR1.3xE-9
atm.cc/sec, and BP 8xE-3 torr. All  high
vacuum gauge readings at CS and TM1 are at
  
  185   Thursday, September 20, 2012, 08:45 Travis CaveConditioning StationStandard OperationTM1Nb#7Electrical checkElectrical check was done at the conditioning
station this morning results are on the attached
PDF.
 TM1_Nb7_Elec_chk_CS.PDF 
  184   Wednesday, September 19, 2012, 11:24 Travis CaveConditioning StationStandard OperationTM1Nb#7module moveTM#1 with Nb#7 was moved from the south
hot cell to the conditioning station. Move
went well.
  
  183   Wednesday, September 19, 2012, 11:23 Travis CaveSouth Hot-CellStandard OperationTM1Nb#7Electrical checkTM#1 with Nb#7 attached was electrically
checked at the south hot cell yesterday,
see attached pdf for details. Some notes
 TM1_Nb7_Elec_chk_SHC.PDF 
  182   Tuesday, September 18, 2012, 13:47 chad fisherSouth Hot-CellStandard OperationTM1Nb#7Nb #7 install Cover BaselineNb #7 was installed and tested today.
Inside face of the containment box
cover was cleaned with methanol and a baseline
 IMG_3191.JPGIMG_3192.JPG 
  181   Tuesday, September 18, 2012, 13:41 David WangSouth Hot-CellStandard OperationTM1Nb#7leak check heat shield circuitChad  and i did a leak check on TM1 heat
shield circuit with new Nb#7 target  installed.
It took about 5 mins pump down  the circuit
  
  180   Tuesday, September 18, 2012, 09:13 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moveTM#1 moved from the south west silo to
the south hot cell, move went well.
  
  179   Friday, September 14, 2012, 10:45 Travis CaveSpent Target VaultStandard Operation UCx#4Spent target moveUCx#4 has been moved from the south hot
cell to the spent target vault. The target
was placed in pail #99 and now resides in
 Vault_Storage_September_14_2012.pdf 