1808
|
Tuesday, October 23, 2018, 11:32 |
David Wang | South Hot-Cell | Maintenance | | | ITW RV4S leak check. | ITW RV4S (A and B) are leak checked. They
are good. |
|
1807
|
Tuesday, October 23, 2018, 10:53 |
chad fisher | South Hot-Cell | Repair | | | Exit 2 East | Cover 1 was removed from the exit module.
Confirmed with David that the actuator rod
that needed to be disconnected was the far |
|
1806
|
Tuesday, October 23, 2018, 10:45 |
David Wang | ITW | Standard Operation | TM2 | SiC nano | TM2 was disconnected in ITW. | TM2(SiC nano) has been disconnected in
ITW. See attachment |
|
1805
|
Monday, October 22, 2018, 14:05 |
Travis Cave | ITW | Repair | | | Module move | ITW Exit #2 has been moved from the
west station to the south hot cell for a
bellows repair. |
|
1804
|
Wednesday, October 10, 2018, 10:50 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#57 | Electrical Check | The various electrical check done
on TM#4 after the UC run and before the start
of the Ta run. |
|
1803
|
Wednesday, October 10, 2018, 07:52 |
David Wang | ITE | Standard Operation | TM4 | Ta#57 | TM4 has been connected in ITE. | TM4 has been connected in ITE. see attachment. |
|
1802
|
Tuesday, October 09, 2018, 13:46 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#57 | Module move | TM#4 with Ta#57 has been moved from
the conditioning station to the east target
station. |
|
1801
|
Tuesday, October 09, 2018, 12:32 |
David Wang | Conditioning Station | Repair | TM4 | | TM4 steers 4 pin feedthrough CF flange | TM4 Steers 4 pin feedthrough CF flange
is replaced due an inside feed through insulator
broken. CF 25 cooper seal is replaced with |
|
1800
|
Friday, October 05, 2018, 14:41 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#24 | Spent Target Move | UC#24 has been moved from the south
hot cell to the spent target vault. The target
is in pail #171 and placed in spot 4C. See |
|
1799
|
Wednesday, October 03, 2018, 14:16 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta #57 | Leak check TM4 Lp Ta# 57 at SHC. | Tried to leak check TM4 Ta57# at TCS. LD
failed to pump down properly at fine range.
It always tripped at 4 torr. I cheeked all |
|
1798
|
Tuesday, October 02, 2018, 09:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#24 | Module move | TM#4 with UC#24 has been moved from
the east target station to the south hot
cell. |
|
1797
|
Tuesday, October 02, 2018, 09:49 |
David Wang | ITE | Standard Operation | TM4 | UCx 24# | TM4 was disconnected in ITE. | TM4 was disconnected in ITE yesterday.
See attachment for checklist. |
|
1796
|
Thursday, September 27, 2018, 13:58 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 has been moved from the conditioning
station to the centre east silo. This will
be its new home after the silo switcher-roo. |
|
1795
|
Wednesday, September 26, 2018, 07:14 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 HV test at TCS. | I did a HV test on TM3 at TCS yesterday.
HV Ramp up speed: 1KV per 5 minutes when
below 30KV,1KV per 10 minutes from 30-36KV. |
|
1794
|
Tuesday, September 25, 2018, 08:48 |
chad fisher | South Hot-Cell | Maintenance | | | Window leak and torque | The south hot cell window has been found
to be leaking oil. Upon inspection yesterday
I found that the bolts compressing the gasket |
|
1793
|
Tuesday, September 25, 2018, 08:01 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | nSiC#1 | nSiC#1 install | On September 18th installation of nSiC#1
was attempted on TM2. As usual, new fasteners
were tested previous to insertion into hot |
|
1792
|
Tuesday, September 25, 2018, 07:54 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 is connected for HV test at TCS. | water loops are by passed on top. All bias,
EE, and EL are tied together. Started
water system. |
|
1791
|
Monday, September 24, 2018, 14:50 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#23 | Spent Target Move | The spent UC#23 target has been moved
from the south hot cell to the spent target
storage. It was placed in pail #170 and place |
|
1790
|
Monday, September 24, 2018, 10:21 |
Anders Mjos | South Hot-Cell | Standard Operation | TM2 | UC#23 | Post Irradiation Examination (PIE) | UC#23 experienced short between target
and heat shield as it was heated during operation.
The inspection of the target after irradiation |
|
1789
|
Friday, September 21, 2018, 10:07 |
David Wang | ITW | Standard Operation | TM2 | SiC nano | TM2 with SiC nano target was has been connected in ITW. | Tm2 with SiC nano has been connected in
ITW. See attachment for checklist |
|