188
|
Tuesday, September 25, 2012, 14:33 |
David Wang | ITW | Standard Operation | TM1 | Nb#7 | TM1connected in ITW | TM 1 is in ITW now. All connections are
done. The turbo pumps had been started this
afternoon. The vacuum looks good so far. |
|
187
|
Tuesday, September 25, 2012, 10:34 |
Travis Cave | ITW | Standard Operation | TM1 | Nb#7 | module move | TM#1 with Nb#7 moved from the conditioning
station to the west target station. Move
went well. |
|
186
|
Thursday, September 20, 2012, 09:16 |
David Wang | Conditioning Station | Standard Operation | TM1 | Nb#7 | TM1 Nb#7 target heat shield helium pressure check is done. | Leak detector pumped down to base LR1.3xE-9
atm.cc/sec, and BP 8xE-3 torr. All high
vacuum gauge readings at CS and TM1 are at |
|
185
|
Thursday, September 20, 2012, 08:45 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Nb#7 | Electrical check | Electrical check was done at the conditioning
station this morning results are on the attached
PDF. |
|
184
|
Wednesday, September 19, 2012, 11:24 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Nb#7 | module move | TM#1 with Nb#7 was moved from the south
hot cell to the conditioning station. Move
went well. |
|
183
|
Wednesday, September 19, 2012, 11:23 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Nb#7 | Electrical check | TM#1 with Nb#7 attached was electrically
checked at the south hot cell yesterday,
see attached pdf for details. Some notes |
|
182
|
Tuesday, September 18, 2012, 13:47 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Nb#7 | Nb #7 install Cover Baseline | Nb #7 was installed and tested today.
Inside face of the containment box
cover was cleaned with methanol and a baseline |
|
181
|
Tuesday, September 18, 2012, 13:41 |
David Wang | South Hot-Cell | Standard Operation | TM1 | Nb#7 | leak check heat shield circuit | Chad and i did a leak check on TM1 heat
shield circuit with new Nb#7 target installed.
It took about 5 mins pump down the circuit |
|
180
|
Tuesday, September 18, 2012, 09:13 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 moved from the south west silo to
the south hot cell, move went well. |
|
179
|
Friday, September 14, 2012, 10:45 |
Travis Cave | Spent Target Vault | Standard Operation | | UCx#4 | Spent target move | UCx#4 has been moved from the south hot
cell to the spent target vault. The target
was placed in pail #99 and now resides in |
|
178
|
Thursday, September 13, 2012, 13:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 has been moved from the south hot
cell to the south west silo. Move went well. |
|
177
|
Thursday, September 13, 2012, 11:03 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UCx#4 | module move | TM#1 with UCx#4 has been moved from the
west target station to the south hot cell.
Move went well. |
|
176
|
Wednesday, September 12, 2012, 11:59 |
David Wang | ITW | Standard Operation | TM1 | UCx | TM1 disconnected in ITW | I removed 5 shielding blocks from ITW to
block storage area, and disconnected TM1
in ITW. After UCx run, the radioactive |
|
175
|
Wednesday, September 12, 2012, 07:00 |
David Wang | ITE | Standard Operation | TM4 | NiO #1 | ITM4 in ITE connected and pumping down | TM4 had been connected in ITE. Six turbo
pump had been started . thepumpming diwn
is very good so far. The water interlock |
|
174
|
Friday, September 07, 2012, 10:37 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | NiO#1 | Electrical check | Electrical check of the TM#4 with NiO#1
was done again today. see attached file for
results. |
|
173
|
Friday, September 07, 2012, 09:47 |
Travis Cave | Spent Target Vault | Standard Operation | | UO#3 | Spent target move | The spent UO#3 was moved from the south
hot cell to the storage vault. It was in
pail 98 and placed in spot 1A of the vault, |
|
172
|
Friday, September 07, 2012, 08:54 |
David Wang | Conditioning Station | Standard Operation | TM4 | NiO #1 | TM4 NiO #1 target heat shield helium pressure check is done. | leak detector pumped down to 0.0xE-9 atm.cc/sec,
and 0.0xE-4 torr. All high vacuum gauge readings
at CS and TM4 are at low -6 range from 2.2xE-6torr |
|
171
|
Wednesday, September 05, 2012, 14:40 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | NiO#1 | Electrical check | See attached PDF for details. 60kV Common
to the target is low at 343k but I've been
told will work. Test will be done again on |
|
170
|
Wednesday, September 05, 2012, 14:36 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | NiO #1 | UOx removal NiO installation | UOx was removed from TM4 yesterday and
NiO#1 installed.
Video was taken. |
|
169
|
Wednesday, September 05, 2012, 11:55 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | NiO#1 | module move | TM#4 with NiO#1 has been moved from the
south hot cell to the conditioning station.
Move went well. |
|