1608
|
Wednesday, August 30, 2017, 11:37 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#52 | Spent Target move | The spent Ta#52 target has been moved from
the south hot cell to the spent target vault.
See attached PDF for details. |
|
1607
|
Tuesday, August 29, 2017, 09:01 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 has been connnected at TCS. | TM4 has been connected at TCS. TCS water
system has been started for TM4. TM4 and
TCS vacuum pumping down is good so far. |
|
1606
|
Tuesday, August 29, 2017, 08:59 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 HS line leak checks | TM4 HS line leak checks are done, at SHC
and TCS. SHC: Helium spray. TCS: Helium
pressurize 70psi. LD base LR 0.0 X |
|
1605
|
Monday, August 28, 2017, 14:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#21 | Electrical Check | The results of the electrical check of
TM#4 with UC#21 attached. |
|
1604
|
Monday, August 28, 2017, 14:34 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#21 | Module move | TM#4 with UC#21 has been moved from
the south hot cell to the conditioning station. |
|
1603
|
Monday, August 28, 2017, 12:07 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#21 | Ta#52 removed UCx#21 installed | Ta#52 has been removed from TM$ and UCx#21
installed with new mounting and high current
hardware. High current fasteners torqued |
|
1602
|
Monday, August 28, 2017, 11:28 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#52 | Module move | TM#4 with Ta#52 has been moved from
the east station to the south hot cell. |
|
1601
|
Friday, August 25, 2017, 16:33 |
Anders Mjos | Conditioning Station | Repair | | | Testing HV after cooling line repair | The BIAS voltage was brought up to
70 kV today and held there for 1h. No sparking
observed. |
|
1600
|
Thursday, August 17, 2017, 14:38 |
Isaac Earle | North Hot-Cell | Development | | | 4/6 NHC roof blocks installed | Roof blocks IRH1641, IRH1642, IRH1643,
and IRH1644 have been fully assembled, labeled,
and installed as per drawing IRH1652. Fabrication |
7x |
1599
|
Tuesday, August 15, 2017, 12:10 |
Isaac Earle | North Hot-Cell | Development | | | ISAC Active Sump low water level measured | The ISAC active sump in the Active Service
Room (#002 on B2 level) was pumped out yesterday
using the standard procedure (Section 5.5.2 |
|
1598
|
Tuesday, August 15, 2017, 09:30 |
Anders Mjos | ITW | Standard Operation | TM2 | Ta#53 | TM2 radiation fields |
|
|
1597
|
Tuesday, August 15, 2017, 09:27 |
Anders Mjos | South Hot-Cell | Standard Operation | TM2 | SiC#36 | Electrical Check of target in SHC |
|
|
1596
|
Wednesday, August 09, 2017, 16:39 |
Isaac Earle | North Hot-Cell | Development | | | NHC drain line into sump identified | The NHC drain line was tested by
pouring approximately 10 gallons of water
through the drain grate at the base of the |
|
1595
|
Tuesday, August 08, 2017, 13:26 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#53 | module moved | TM#2 with Ta#53 has been moved from the
conditioning station to the west target station. |
|
1594
|
Thursday, August 03, 2017, 17:08 |
Anders Mjos | Conditioning Station | Repair | TM2 | | Power bump | Thursday, August 03, 2017, 17:08:
Restarting vacuum and water system |
|
1593
|
Thursday, August 03, 2017, 15:02 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#36 | Spent Target Move | The spent SiC#36 has been moved from
the south hot cell to the spent target vault. |
|
1592
|
Wednesday, August 02, 2017, 15:41 |
Keith C Ng | Assembly/Bench Test | Development | | | spare source tray build | After re zeroing alignment telescope to
master jig and adjusted parts into place:
|
|
1591
|
Wednesday, August 02, 2017, 15:13 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on HS line. | HS line is leak checked at SHC this afternoon
by helium spay. Leak detector base
LR 0.0 XE-9atm.cc/sec. Base pressure 0.0Xe-4 |
|
1590
|
Wednesday, August 02, 2017, 15:09 |
David Wang | ITW | Standard Operation | TM2 | | TM2 was disconnencted in ITW yesterday. | Tm2 was disconnected in ITW yesterday.
ITW EL cable crimp ring was broken. John
Chow replaced this ring this afternoon. |
|
1589
|
Tuesday, August 01, 2017, 14:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#36 | Electrical Check | The electrical check of TM#2 with SiC#36
attached. Post beam at the south hot cell.
See attached results allow the before beam |
|