1375
|
Friday, October 21, 2016, 12:51 |
chad fisher | South Hot-Cell | Repair | | | Manipulator Repair | Broken cable has been replaced however
a cable has hopped some pulleys inside. After
two hours in cell the job was stopped with |
|
1374
|
Thursday, October 20, 2016, 14:17 |
Anders Mjos | ITE | Repair | TM4 | SiC#34 | HV enclosure inspection | The HV enclosure and module connections
were inspected by David and Anders on Wednesday
19th in an attempt to find any HV problems |
|
1373
|
Thursday, October 20, 2016, 10:45 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#49 | Spent Target move | Ta#49 has been removed from the south hot
cell and placed in the storage vault. It
is in pail 146 and in spot 6A. |
|
1372
|
Wednesday, October 19, 2016, 11:46 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module moved | TM#2 has been moved from the south hot
cell to the south west silo. |
|
1371
|
Wednesday, October 12, 2016, 10:01 |
David Wang | Conditioning Station | Standard Operation | | | TCS pumps are stopped | Argon venting is started |
|
1370
|
Wednesday, October 12, 2016, 10:00 |
David Wang | ITW | Standard Operation | TM2 | | TM2 was disconnected at ITW | TM2 was disconnected at ITW. 3 water circuits
in ITW gave been looped to keep 75 GPM water
flow to ITW. HS line was purged at HS. RPG |
|
1369
|
Tuesday, October 11, 2016, 10:36 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#49 | module moved | TM#2 with Ta#49 has been moved from the
west target station to the south hot cell. |
|
1368
|
Tuesday, October 04, 2016, 09:18 |
David Wang | ITE | Standard Operation | TM4 | | 5 Shielding blocks have been transferred from ITW to ITE. | The ITE is configured to take proton beam. |
|
1367
|
Friday, September 30, 2016, 14:34 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule for beam schedule 131(Sep-Dec, 2016) | Weekly update TH schedule for beam schedule
131. See attachments 1,2 |
|
1366
|
Wednesday, September 28, 2016, 13:47 |
David Wang | Conditioning Station | Standard Operation | | | TCS pumping down during mini-shut down. | A steel plate is covered on TCS.
TCS roughing pump is started now. The
TCS will be pumping down during mini-shut |
|
1365
|
Wednesday, September 28, 2016, 13:43 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been connected at ITE | All ITE turbo pumps have been started since
yesterday afternoon. The ITE and TM4 pumping
down is good so far. |
|
1364
|
Tuesday, September 27, 2016, 09:13 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#34 | module moved | TM#4 with SiC #34 has been moved to the
east target station. |
|
1363
|
Tuesday, September 27, 2016, 07:30 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 has been disconnected at TCS | TCS water system and vacuum system are
turned off this morning. The TCS and
TM4 are vented. |
|
1362
|
Monday, September 26, 2016, 13:59 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#17 | Spent Target move | The spent UC#17 has been moved from the
south hot cell to the spent target vault.
See the attached pdf for details. |
|
1361
|
Saturday, September 24, 2016, 11:23 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | SiC#34 | Conditioning SiC#34 | Conditioning by ISAC operations
Saturday, September 24, 2016, 11:15:
RGA on for heater conditioning. (kept off |
|
1360
|
Friday, September 23, 2016, 08:55 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#34 | Electrical Checks | The bundle of electrical checks, first
one is the Iglis that failed, the second
is the everything passed at the hot cell |
|
1359
|
Friday, September 23, 2016, 07:49 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 has been moved and connected at TCS | All TCS and TM4 turbo-pumps were started
yesterday. Overnight pumping down is good
so far. |
|
1358
|
Thursday, September 22, 2016, 13:04 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | SHC, TM4 leak check on HS line. | Chad and I leak checked the TM4 HS line
after new target installation. base leak
rate:0.0Xe-9 atm.cc/sec. No response |
|
1357
|
Tuesday, September 20, 2016, 11:48 |
David Wang | Assembly/Bench Test | Development | | | A silo and blue steel frame are removed out of TH | A silo and blue steel frame are removed
out of TH this morning. They are transferred
through ante room, and moved to experimental |
|
1356
|
Tuesday, September 20, 2016, 11:41 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been disconnected in ITE. | TM4 has been disconnected in ITE. No water
line purge on HS and 3 water circuits are
looped after disconnection. The HALCW system |
|