1068
|
Tuesday, September 15, 2015, 08:24 |
David Wang | South Hot-Cell | Repair | TM1 | UCx 13 | Leak check on TM1 window circuit soldering stems in service cap. | I did a leak check on TM1 window circuit
2 soldering stems in service cap.The
round side panel was opened for the job. |
|
1067
|
Friday, September 11, 2015, 14:31 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | ZrC#7 | Vacuum gauge and EPICS read back calibration | The corelation betwenn the local value
on the gauge controllers and the read back
valiues in EPICS was compared. Data can be |
|
1066
|
Thursday, September 10, 2015, 08:59 |
chad fisher | South Hot-Cell | Repair | | | Manipulator Mait. and field check Sept. 4 | Hot cell was entered for preventative mait.
on left manip. field measurements around
the cell were taken in prep. for window removal |
|
1065
|
Thursday, September 10, 2015, 08:55 |
chad fisher | South Hot-Cell | Repair | TM1 | | TM1 Window Leak Diag. | Vacuum leak check on the window line circuit
of TM1 took place yesterday and again to
confirm this morning. Both days the response |
|
1064
|
Wednesday, September 09, 2015, 09:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Module moved | TM#1 has been moved from the south west
silo to the south hot cell. |
|
1063
|
Tuesday, September 08, 2015, 10:11 |
David Wang | ITW | Standard Operation | TM2 | ZrC | 5 Shielding blocks have been transferred from ITE to ITW. | Maico and Dan moved 5 shielding blocks
from ITE to ITW. The ITW is configured to
take proton beam. |
|
1062
|
Wednesday, September 02, 2015, 09:26 |
David Wang | ITE | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | I attach new Target Hall schedules here
for 2015 fall and winter runs (beam schedule
129). The TH excel sheet schedule for beam |
|
1061
|
Tuesday, September 01, 2015, 16:55 |
Anders Mjos | Conditioning Station | Maintenance | | | TBHT power supply remvoed | The power supply is needed as a spare
for the failed TGHT p/s in ITW |
|
1060
|
Tuesday, September 01, 2015, 16:03 |
Grant Minor | ITW | Standard Operation | TM2 | ZrC #7 | Photos of TM2 Connection Procedure on Docushare 1Sept2015 | https://documents.triumf.ca/docushare/dsweb/View/Collection-15323 |
|
1059
|
Tuesday, September 01, 2015, 14:54 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connectec in ITW. | TM2 has been connected in ITW. During the
connection, Anders and I found the
TM2 high current cables used in ITE |
|
1058
|
Tuesday, September 01, 2015, 10:38 |
David Wang | ITW | Maintenance | TM2 | | ITW top tank flange clean up and r-ring replacement. | During last run, ITW dump circuit
had a water leak on an adaptor below the
pressure gauge. The top tank flange, slot, |
|
1057
|
Tuesday, September 01, 2015, 10:32 |
Travis Cave | ITW | Standard Operation | TM2 | ZrC #7 | Module moved | TM#2 with ZrC#7 has been moved from the
conditioning station to the west target
station. |
|
1056
|
Tuesday, September 01, 2015, 06:25 |
David Wang | Conditioning Station | Standard Operation | TM2 | ZrC | Argon venting TM2 at CS | Argon venting TM2 at CS. |
|
1055
|
Thursday, August 27, 2015, 10:10 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | ZrC#7 | Conditioning new Source Tray | Thursday, August 27, 2015, 10:10: Started
water system. TK2 level reduced from 24.9
to 23.5 in. |
|
1054
|
Thursday, August 27, 2015, 08:43 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | ZrC #7 | Electrical Check | Electrical check of TM#2 at the conditioning
station under vacuum. The resistance value
of the target to 60kV common is a bit lower |
|
1053
|
Wednesday, August 26, 2015, 14:52 |
David Wang | Conditioning Station | Standard Operation | TM2 | ZrC | Helium pressure test on TM2 HS and window lines at CS | LD base LR 0.0xE-9 atm.cc/sec , 80 psi
helium 2 minutes on HS and window circuits.
No leak. Also, the reinstalled(after rewiring |
|
1052
|
Wednesday, August 26, 2015, 14:30 |
David Wang | Conditioning Station | Standard Operation | TM2 | ZrC | TM2 and Cs vacuum sysyem has been connected at CS. | Turbo-pumps are started . The pumping down
is good so far. |
|
1051
|
Wednesday, August 26, 2015, 14:28 |
David Wang | Conditioning Station | Standard Operation | TM2 | ZrC | Leak check on TM2 HS and windowwater line with new ZrC target at SHC | Chad and I leak checked TM2 HS and window
circuit VCR joints with ZrC target and containment
box installed at SHC. No leak has been found. |
|
1050
|
Wednesday, August 26, 2015, 11:12 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | ZrC #7 | Module moved | TM#2 with ZrC#7 has been moved to the conditioning
station from the south hot cell. |
|
1049
|
Wednesday, August 26, 2015, 10:55 |
chad fisher | South Hot-Cell | Repair | TM2 | ZrC#7 | New wiring and target | New wiring was installed yesterday as well
as ZrC#7 which had its high current fasteners
torqued to 130 in lbs. |
|