  1068   Tuesday, September 15, 2015, 08:24 David WangSouth Hot-CellRepairTM1UCx 13Leak check on TM1 window circuit soldering stems in service cap.I did a leak check on TM1 window circuit 
2 soldering  stems in service cap.The
round side panel was opened for the job.
  
  1067   Friday, September 11, 2015, 14:31 Anders MjosConditioning StationMaintenanceTM2ZrC#7Vacuum gauge and EPICS read back calibrationThe corelation betwenn the local value
on the gauge controllers and the read back
valiues in EPICS was compared. Data can be
  
  1066   Thursday, September 10, 2015, 08:59 chad fisherSouth Hot-CellRepair  Manipulator Mait. and field check Sept. 4Hot cell was entered for preventative mait.
on left manip. field measurements around
the cell were taken in prep. for window removal
  
  1065   Thursday, September 10, 2015, 08:55 chad fisherSouth Hot-CellRepairTM1 TM1 Window Leak Diag.Vacuum leak check on the window line circuit
of TM1 took place yesterday and again to
confirm this morning. Both days the response
 P0000122.JPG 
  1064   Wednesday, September 09, 2015, 09:59 Travis CaveSouth Hot-CellStandard OperationTM1no targetModule movedTM#1 has been moved from the south west
silo to the south hot cell.
  
  1063   Tuesday, September 08, 2015, 10:11 David WangITWStandard OperationTM2ZrC5 Shielding blocks have been transferred from ITE to ITW.Maico and Dan moved 5 shielding blocks
from ITE to ITW. The ITW is configured to
take proton beam.
  
  1062   Wednesday, September 02, 2015, 09:26 David WangITEStandard Operation  Target Hall schedule from Sep 08th 2015 to Dec 25th 2015I attach new Target Hall schedules here
for 2015 fall and winter runs (beam schedule
129). The TH excel sheet schedule for beam
 Target_Hall_shedule_129_Sep_to_Dec.xlsxTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mppTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mpp 
  1061   Tuesday, September 01, 2015, 16:55 Anders MjosConditioning StationMaintenance  TBHT power supply remvoed The power supply is needed as a spare
for the failed TGHT p/s in ITW
  
  1060   Tuesday, September 01, 2015, 16:03 Grant MinorITWStandard OperationTM2ZrC #7Photos of TM2 Connection Procedure on Docushare 1Sept2015https://documents.triumf.ca/docushare/dsweb/View/Collection-15323   
  1059   Tuesday, September 01, 2015, 14:54 David WangITWStandard OperationTM2 TM2 has been connectec in ITW.TM2 has been connected in ITW. During the
connection, Anders and I  found the
TM2  high current cables used in ITE
  
  1058   Tuesday, September 01, 2015, 10:38 David WangITWMaintenanceTM2 ITW top tank flange clean up and r-ring replacement.During last run, ITW dump circuit
had a water leak on an adaptor below the
pressure gauge. The top tank flange, slot,
 ITW_o-ring_replacement_2015-09-01_008.JPGITW_o-ring_replacement_2015-09-01_007.JPGITW_o-ring_replacement_2015-09-01_006.JPG 
  1057   Tuesday, September 01, 2015, 10:32 Travis CaveITWStandard OperationTM2ZrC #7Module movedTM#2 with ZrC#7 has been moved from the
conditioning station  to the west target
station.
  
  1056   Tuesday, September 01, 2015, 06:25 David WangConditioning StationStandard OperationTM2ZrCArgon venting TM2 at CSArgon venting TM2 at CS.   
  1055   Thursday, August 27, 2015, 10:10 Anders MjosConditioning StationStandard OperationTM2ZrC#7Conditioning new Source TrayThursday, August 27, 2015, 10:10: Started
water system. TK2 level reduced from 24.9
to 23.5 in. 
 2015-08-31_Service_Cap_Sparking_on_Rubber_Plug.pdfTM2_Source_Tray_with_ZrC#7.docxVacuum_gague_calibration.xlsx 
  1054   Thursday, August 27, 2015, 08:43 Travis CaveConditioning StationStandard OperationTM2ZrC #7Electrical CheckElectrical check of TM#2 at the conditioning
station under vacuum. The resistance value
of the target to 60kV common is a bit lower
 TM2_elec_chk_ZrC7_CS.PDF 
  1053   Wednesday, August 26, 2015, 14:52 David WangConditioning StationStandard OperationTM2ZrCHelium pressure test on TM2 HS and window lines at CSLD base LR 0.0xE-9 atm.cc/sec , 80 psi
helium 2 minutes on HS and window circuits.
No leak. Also, the reinstalled(after rewiring
  
  1052   Wednesday, August 26, 2015, 14:30 David WangConditioning StationStandard OperationTM2ZrCTM2 and Cs vacuum sysyem has been connected at CS.Turbo-pumps are started . The pumping down
is good so far.
  
  1051   Wednesday, August 26, 2015, 14:28 David WangConditioning StationStandard OperationTM2ZrCLeak check on TM2 HS and windowwater line with new ZrC target at SHCChad and I leak checked TM2 HS and window
circuit VCR joints with ZrC target and containment
box installed at SHC. No leak has been found.
  
  1050   Wednesday, August 26, 2015, 11:12 Travis CaveConditioning StationStandard OperationTM2ZrC #7Module movedTM#2 with ZrC#7 has been moved to the conditioning
station from the south hot cell.
  
  1049   Wednesday, August 26, 2015, 10:55 chad fisherSouth Hot-CellRepairTM2ZrC#7New wiring and targetNew wiring was installed yesterday as well
as ZrC#7 which had its high current fasteners
torqued to 130 in lbs.
 20150826_090047.jpg 