Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron, Page 7 of 10  Not logged in ELOG logo
  ID Date Author Categorydown Type Subject Text Attachments
  17   Monday, March 11, 2013, 19:43 Grant MinorCyclotronRepairAdjustment of tank lid upper limit by 1/4" upwardsThis morning Don Jackson commented to Grant
Minor that he believed the tank lid was still
not raised high enough to safely operate
 cyclotron_upper_limit_station_10_before_adjustment_11Mar2013_002.jpgcyclotron_upper_limit_station_10_after_adjustment_11Mar2013_004.jpgcyclotron_upper_limit_station_1_before_adjustment_11Mar2013_005.jpgcyclotron_upper_limit_station_1_after_adjustment_11Mar2013_006.jpgcyclotron_upper_limit_lamp_on_11Mar2013_008.jpg 
  18   Thursday, March 14, 2013, 19:57 Grant MinorCyclotronRepairTank lid upper / over travel limit checkToday Grant Minor, Dan Wright, Arthur Leung,
and Dan Louie checked the height difference
between the tank lid upper travel limit switch
 cyclotron_over_travel_limit_check_Station10_14Mar2013_003.JPGcyclotron_over_travel_limit_check_Station1_14Mar2013_001.jpg 
  19   Friday, March 15, 2013, 08:39 Don JacksonCyclotronStandard OperationPre Lid Down In Tank Video SurveyIn tank survey completed.  A few items
of interest were found.  Ladders need
to moved manually outboard to #5 resonators
 Pre_Lid_Down_Survey_2013.pdf 
  20   Friday, March 15, 2013, 15:18 Grant MinorCyclotronStandard OperationLid Down Successful - Mechanical Counter ReadingsPrior to the lid-down operation today,
the Cyclotron was lowered by 0.75" and
then raised again to confirm that the upper
  
  21   Monday, March 18, 2013, 15:12 Isaac EarleCyclotronMaintenanceCyclotron Magnet Face Gap MeasurementsMeasurements of the cyclotron magnet face
gap were taken on March 15, 2013 at two locations
around the tank with the cyclotron lid in
 8x 
  29   Friday, January 24, 2014, 14:10 Travis CaveCyclotronStandard OperationCopper blockersThe copper blockers have been removed from
the cyclotron and placed into the coffins.
  
  32   Wednesday, January 29, 2014, 15:08 Bevan MossCyclotronStandard OperationShielding and Port Hole Covers The Shielding and the Port Hole Covers
have all been installed. No issues with the
installation have caused any problems. This
  
  33   Thursday, January 30, 2014, 13:47 Travis CaveCyclotronStandard OperationshieldsAll shields, pothole covers, and ladders
have been installed into the cyclotron.
  
  34   Friday, January 31, 2014, 10:07 Travis CaveCyclotronStandard Operation2C removal2C has been successfully removed from the
cyclotron and is now currently sitting in
the B2 level of the RH building. A tank access
  
  35   Friday, February 07, 2014, 10:50 Travis CaveCyclotronStandard Operation2C install2C has been installed into the cyclotron.   
  36   Friday, February 21, 2014, 11:05 Bevan MossCyclotronStandard OperationOld Monitor Box Removed, New installed One of the beam spill monitor boxes
was removed and placed into a lead coffin.
The fields around the coffin prior to the
 7x 
  37   Friday, February 21, 2014, 15:58 Bevan MossCyclotronStandard OperationOld Monitor Box Removed, New installedDuring the electrical test the was no contact.
 To help investigate further the Montitor
box was removed from the Cyclotron. It was
  
  40   Monday, March 03, 2014, 13:09 Travis CaveCyclotronStandard Operationshieldsall shields, porthole covers and ladder
out and copper blockers in. Some conmination
was found on the pads of the ladders (about
  
  50   Tuesday, January 27, 2015, 14:40 Travis CaveCyclotronStandard OperationDay one of in tank workDay one of RH in tank work for the cyclotron
(shields and blockers stuff like that) many
pictures were taken.
  
  51   Wednesday, January 28, 2015, 14:33 Travis CaveCyclotronStandard OperationDay two of in tank workAll copper blocker removed from the cyclotron
and first radiation survey done. Shields
start tomorrow.
  
  52   Thursday, January 29, 2015, 14:53 Travis CaveCyclotronStandard OperationDay three of in tank workOver 50% of the shields are in some 700's
left and the monitor box covers.
  
  53   Friday, January 30, 2015, 15:02 Travis CaveCyclotronStandard OperationDay four of in tank workAll shields, ladders and pothole covers
are in. One rad survey left to do.
  
  54   Monday, February 02, 2015, 14:28 Travis CaveCyclotronStandard OperationDay five of in tank workFinal Radiation Survey done. All in tank
work completed bridge removed from the tank.
  
  55   Wednesday, February 04, 2015, 13:57 Travis CaveCyclotronStandard Operation2C removal2C has been removed from the cyclotron.   
  57   Tuesday, February 17, 2015, 11:28 Travis CaveCyclotronStandard Operation2C Installation2C extraction probe has been re-installed
in the cyclotron. After some problems on
the first install attempt, do to a busted
  
ELOG V2.9.2-2455