75
|
Tuesday, January 19, 2016, 17:59 |
Grant Minor | Elevation Jack | Development | Upper Bearing Fall Protection Installation - Stations 1, 2, 6, 7, 8, 11, & 12 | The installation of the upper bearing fall
protection equipment was completed last week
by Dan and Maico. |
22x |
150
|
Friday, February 03, 2023, 08:27 |
Eric Lahe | Elevation Jack | Maintenance | Elevating System Jack Inspection | Annual Jack Inspection: The annual
elevation system inspection has been completed
(Jan 31,2023). |
|
164
|
Wednesday, January 31, 2024, 15:06 |
Eric Lahe | Elevation Jack | Maintenance | Elevating System - Annual Station Swap 2023-2024 | The annual elevating system maintenance
for the 2023-2024 shutdown following Document-220322,
Work done after electrical lockout |
|
4
|
Friday, February 17, 2012, 15:07 |
Don Jackson | Trolley | Repair | Video Trolley Failed in Cyclotron Tank | All control to the video trolley was lost
during remote photographing of components
in the cyclotron. The control system and |
 |
19
|
Friday, March 15, 2013, 08:39 |
Don Jackson | Cyclotron | Standard Operation | Pre Lid Down In Tank Video Survey | In tank survey completed. A few items
of interest were found. Ladders need
to moved manually outboard to #5 resonators |
|
108
|
Friday, February 02, 2018, 14:14 |
Don Jackson | Trolley | Repair | Overcurrent on radial drive motor |
|
|
43
|
Monday, April 28, 2014, 10:20 |
Dan McDonald | Service Bridge | Maintenance | Bridge orbit reduction box | Noticed oil leaking out of reduction box,
scan and swipe, disconnect e motor and all
related cables from bridge, remove motor |
|
45
|
Friday, July 04, 2014, 07:21 |
Dan McDonald | Elevation Jack | Standard Operation | Cyclotron lid down July-2- 2014 | Cyclotron lid down was successfully completed
on July 2 2014. Lid went partially down before
jack nine had to be jogged to catch up to |
|
56
|
Tuesday, February 17, 2015, 07:10 |
Dan McDonald | Trolleys serviced | Maintenance | Pre shut down trolley service | Routine maintenance as per Mike Gallop's
written procedure took place in December
with the only non routine service being the |
|
65
|
Friday, March 27, 2015, 07:31 |
Dan McDonald | Cyclotron | Repair | Lid up operations | Lid up recap for March 26th 2015.
Start time 14:50 |
|
67
|
Thursday, April 02, 2015, 12:09 |
Dan McDonald | Cyclotron | Standard Operation | Lid Down operations April, 2, 2015 | Lid down Start at 11:17, lid went down
without any issues or stop's. Lid finish
at 11:45 |
|
69
|
Tuesday, July 28, 2015, 11:47 |
Dan McDonald | Trolley | Maintenance | Camera trolley service | Serviced the Camera trolley this morning
as per Mike Gallops service outline. |
|
77
|
Wednesday, February 03, 2016, 08:16 |
Dan McDonald | Cyclotron | Standard Operation | Cyclotron lid up | Lid up procedure Started at 12:00pm.
Initial numbers. # 1-47,2-49,3-45,4-47,5-47,6-47,7-49,8-45,9-50,10-50,11-51,12-49.
After a number of unsuccessful attempts at |
|
87
|
Tuesday, March 15, 2016, 13:56 |
Dan McDonald | Cyclotron | Standard Operation | Lid Down 2016 | Lid down Started at 12:15, station and
count numbers. Lid went down with out incident
as station 1 and 7 show the counters will |
|
89
|
Thursday, June 30, 2016, 13:47 |
Dan McDonald | Trolley | Maintenance | Lift trolley | Maintenance has been performed on the lift
trolley, re sealed the main drive gear box
it was quite dry inside and in need of new |
|
90
|
Wednesday, September 14, 2016, 11:30 |
Dan McDonald | Elevation Jack | Maintenance | Jack station 10B | Annual jack maintenance : Jack 10b upon
inspection it was found that the output shaft
seal on 10b was in need of replacement. In |
14x |
112
|
Tuesday, January 22, 2019, 07:18 |
Dan McDonald | Elevation Jack | Maintenance | Station 11-12 jack swap and hoist plate instal | Prior to commencing work on jacking stations
we installed a wall mounted come along plate
as per Jason kapalkas instructions |
|
115
|
Thursday, January 30, 2020, 06:55 |
Dan McDonald | Cyclotron | Standard Operation | Lid up operations | Lid up operations took place on January
21st starting at 10:25 lid went up without
issue. Couple things to note are station |
|
120
|
Saturday, April 04, 2020, 09:47 |
Dan McDonald | Cyclotron | Standard Operation | Lid down operations | Lid down operations for 2019/2020 shutdown
went ahead as planned on March 10th 2020
with Dan Louie and Arthur Leung absent due |
|
121
|
Saturday, April 04, 2020, 10:03 |
Dan McDonald | Trolley | Development | Addition of DC motor controller mounts | Upper and lower resonator trolleys received
mounting plates and brackets to accommodate
DC motor controls for updated drive motors. |
|