53
|
Friday, January 30, 2015, 15:02 |
Travis Cave | Cyclotron | Standard Operation | Day four of in tank work | All shields, ladders and pothole covers
are in. One rad survey left to do. |
|
|
52
|
Thursday, January 29, 2015, 14:53 |
Travis Cave | Cyclotron | Standard Operation | Day three of in tank work | Over 50% of the shields are in some 700's
left and the monitor box covers. |
|
|
51
|
Wednesday, January 28, 2015, 14:33 |
Travis Cave | Cyclotron | Standard Operation | Day two of in tank work | All copper blocker removed from the cyclotron
and first radiation survey done. Shields
start tomorrow. |
|
|
50
|
Tuesday, January 27, 2015, 14:40 |
Travis Cave | Cyclotron | Standard Operation | Day one of in tank work | Day one of RH in tank work for the cyclotron
(shields and blockers stuff like that) many
pictures were taken. |
|
|
49
|
Tuesday, January 27, 2015, 11:39 |
Grant Minor | Elevation Jack | Standard Operation | Lid-Up Report 26 Jan 2015 |
Normal
0
|
|
|
48
|
Monday, January 26, 2015, 07:57 |
maicodallavalle | Elevation Jack | Maintenance | Fall arrest Platform Railing | All of the Fall arrest Platform Railing
has been Collapsed for Cyclotron Lid up. |
|
|
47
|
Friday, January 23, 2015, 10:27 |
maicodallavalle | Elevation Jack | Maintenance | 2015 Jack Maintenance - Stations #4 and Station #9 | The Cyclotron Elevating System Shut Down
work done this year was done on Station #4
and Station #9. |
|
|
46
|
Tuesday, January 13, 2015, 16:46 |
Grant Minor | Elevation Jack | Development | Upper Bearing Fall Protect Guardrails TRH1217 Installed on Stns 8,10, 3, 4 & 5 | 5 x TRH1217 Upper Bearing Service Platform
assemblies were installed between January
6th and January 13th at Stations 8, 10, 3, |
9x |
|
45
|
Friday, July 04, 2014, 07:21 |
Dan McDonald | Elevation Jack | Standard Operation | Cyclotron lid down July-2- 2014 | Cyclotron lid down was successfully completed
on July 2 2014. Lid went partially down before
jack nine had to be jogged to catch up to |
|
|
44
|
Wednesday, July 02, 2014, 16:46 |
Grant Minor | Elevation Jack | Standard Operation | Cyclotron Lid-Up Report for 27 June 2014 | The cyclotron lid was raised on June 27th,
2014. Start time was 1:05pm end time
was 2:17pm (good!) Dan McDonald collected |
|
|
43
|
Monday, April 28, 2014, 10:20 |
Dan McDonald | Service Bridge | Maintenance | Bridge orbit reduction box | Noticed oil leaking out of reduction box,
scan and swipe, disconnect e motor and all
related cables from bridge, remove motor |
|
|
42
|
Tuesday, April 08, 2014, 10:45 |
Travis Cave | Shielding | Standard Operation | Large shield door on the RH B2 level | The large shield door on the RH B2 level
of the remote handling building has been
shut. |
|
|
41
|
Monday, March 03, 2014, 15:07 |
Grant Minor | Elevation Jack | Standard Operation | Cyclotron Lid-Down Report Monday 3-March-2014 | The Cyclotron Lid Down was successfully
completed today on Work Permit C2014-03-03-6.
The system only tripped twice on |
|
|
40
|
Monday, March 03, 2014, 13:09 |
Travis Cave | Cyclotron | Standard Operation | shields | all shields, porthole covers and ladder
out and copper blockers in. Some conmination
was found on the pads of the ladders (about |
|
|
39
|
Wednesday, February 26, 2014, 14:55 |
Travis Cave | Shielding | Standard Operation | shields | More shields have been removed from the
cyclotron only 16 remain. I was also noted
that the lift trolley is making an odd noise |
|
|
38
|
Tuesday, February 25, 2014, 15:00 |
Travis Cave | Shielding | Standard Operation | shields | Started on the removal of shields. |
|
|
37
|
Friday, February 21, 2014, 15:58 |
Bevan Moss | Cyclotron | Standard Operation | Old Monitor Box Removed, New installed | During the electrical test the was no contact.
To help investigate further the Montitor
box was removed from the Cyclotron. It was |
|
|
36
|
Friday, February 21, 2014, 11:05 |
Bevan Moss | Cyclotron | Standard Operation | Old Monitor Box Removed, New installed | One of the beam spill monitor boxes
was removed and placed into a lead coffin.
The fields around the coffin prior to the |
7x |
|
35
|
Friday, February 07, 2014, 10:50 |
Travis Cave | Cyclotron | Standard Operation | 2C install | 2C has been installed into the cyclotron. |
|
|
34
|
Friday, January 31, 2014, 10:07 |
Travis Cave | Cyclotron | Standard Operation | 2C removal | 2C has been successfully removed from the
cyclotron and is now currently sitting in
the B2 level of the RH building. A tank access |
|