173
|
Thursday, May 02, 2024, 12:42 |
Adam Newsome | Elevation Jack | Standard Operation | Lid up operation (third) - 2024 | The cyclotron lid was raised starting ~11:45am
on 2024-05-02 and finishing at ~12:12pm
under work permit C2024-05-02-5. |
|
172
|
Tuesday, April 30, 2024, 15:00 |
Adam Newsome | Cyclotron | Standard Operation | Lid down operation (second) - 2024 | A second lid down
operation took place on April 30, 2024. |
|
171
|
Wednesday, April 24, 2024, 14:26 |
Adam Newsome | Elevation Jack | Standard Operation | Lid up operation (second) - 2024 | Due to an issue with resonator latching,
there was a need to raise the cyclotron lid
a second time this shutdown. |
|
170
|
Friday, April 19, 2024, 15:18 |
Adam Newsome | Cyclotron | Standard Operation | Lid down operation - 2024 | The lid down operation
took place on April 19, 2024. |
|
169
|
Monday, February 26, 2024, 11:52 |
Adam Newsome | Cyclotron | Repair | Controls issue - CAMAC power supply | An issue was encountered on 2024-02-23
when attempting to operate the lift trolley.
|
|
168
|
Friday, February 16, 2024, 11:11 |
Adam Newsome | Trolley | Repair | Lift Trolley: vertical motion failure, motor relays replaced | Today (2024-02-16) when operating the lift
trolley to install shields in the cyclotron,
the vertical motion was observed to be intermittently |
|
167
|
Friday, February 09, 2024, 15:43 |
Adam Newsome | Elevation Jack | Standard Operation | Lid up operation - 2024 | The cyclotron lid was raised starting ~10:30am
on 2024-02-06 and finishing at ~3:30pm on
2024-02-08, under work permit C2024-02-06-4. |
|
166
|
Thursday, February 08, 2024, 08:50 |
Adam Newsome | Elevation Jack | Maintenance | Elevating system - station 10 motor contactor issue | It was observed during lid up operation
on 2024-02-08, approximately halfway through
raising the lid, that the motor contactor |
|
165
|
Wednesday, February 07, 2024, 12:04 |
Adam Newsome | Elevation Jack | Repair | Elevating system - brake master relay fuse issue | It was observed when attempting lid up
operation on 2024-02-06 that the brakes for
each of the jacks were not operating correctly. |
|
164
|
Wednesday, January 31, 2024, 15:06 |
Eric Lahe | Elevation Jack | Maintenance | Elevating System - Annual Station Swap 2023-2024 | The annual elevating system maintenance
for the 2023-2024 shutdown following Document-220322,
Work done after electrical lockout |
|
163
|
Wednesday, January 31, 2024, 11:39 |
Adam Newsome | Elevation Jack | Maintenance | Jack station 11: synchro replaced | Because of observed noise on the synchro
at jack station 11 during recent shutdown
lid up/down operations, the synchro at this |
|
162
|
Tuesday, January 23, 2024, 14:03 |
Adam Newsome | Elevation Jack | Maintenance | Inspection of elevating system motor contacts | Motor contactors for the cyclotron elevating
system jacks were inspected on 2025-01-23
by Joel Semilla under work permit C2024-01-19-1. |
|
161
|
Tuesday, November 14, 2023, 12:38 |
Nadia Jorgenson | Service Bridge | Maintenance | Bridge Orbit Counter Work in 2023 | All the bearings on both
the upper and lower wheel were replace to |
|
160
|
Tuesday, November 14, 2023, 12:13 |
Nadia Jorgenson | Service Bridge | Repair | First Festooning Car "H" channel replacement | Damaged "H" channel removed
from the first festooning car, and spare
channel was put in place. |
|
159
|
Wednesday, October 18, 2023, 12:35 |
Jason Zhang | Service Bridge | Development | O503 Bridge and Outrigger integration testing | Service bridge, Outrigger #1, and
Outrigger #2 have had the controls system
migrated to PLC controls. The 5069-AENTR |
|
158
|
Friday, September 15, 2023, 10:15 |
Adam Newsome | Trolley | Maintenance | Lift Trolley: mirror actuation mechanism repair/upgrade | The mirror actuation mechanism was observed
to be "sticky" during 2023 winter
shutdown - it occasionally did not function |
|
157
|
Thursday, September 14, 2023, 13:51 |
Adam Newsome | Trolley | Maintenance | Lift Trolley: upgrades to camera tilt mechanism | The two camera tilt mechanisms on the lift
trolley have been upgraded. Upgrades include:
For the individual camera: |
|
156
|
Thursday, September 07, 2023, 13:21 |
Jason Zhang | Service Bridge | Development | Outrigger #1 and #2 individual testing complete | Outrigger #1 and #2 have had their controls
system overhauled as part of the O503 project.
The previous controls enclosure and the elements |
|
155
|
Thursday, August 03, 2023, 10:43 |
Adam Newsome | Trolley | Development | Previous generation video trolley decommissioned | The "old" video trolley featuring
scissor mechanism and DSLR camera has officially
been decommissioned. Going forward, Video |
|
154
|
Friday, July 28, 2023, 12:05 |
Adam Newsome | Cyclotron | Development | Maintenance ladders: end caps added | The original end feet and end caps were
removed from the maintenance ladders and
replaced by new end caps (TRH1637). |
|