  27   Friday, January 25, 2013, 15:15 Keith C NgPrimary BeamlinesRepair1A triplet repair (ground fault)Today: Uncovered 1A triplet cable chase
and reconfigured shielding. D. Preddy will
continue with diagnosing ground fault on
 20130125_tripletrepair_IMG_0071.JPG20130125_tripletrepair_IMG_0067.JPG 
  28   Monday, January 28, 2013, 16:28 Keith C NgPrimary BeamlinesRepair1A triplet repair (ground fault)Rad survey map from last Friday (25 January)
here.
 
 6x 
  29   Tuesday, January 29, 2013, 16:28 Keith C NgPrimary BeamlinesRepair1A triplet repair (ground fault)Restored shielding over 1A triplet chase.
 
Uncovered Q16 and set up RH bridge
  
  30   Wednesday, January 30, 2013, 16:46 Keith C NgPrimary BeamlinesRepair1A triplet repair (ground fault)Cut and removed asymmetric steering cables
from Q14 and 16, cables are no longer resting
on magnet power bus bars.
 20130130_tripletrepair_P1020683.JPG20130130_tripletrepair_IMG_0123.JPG20130130_tripletrepair_P1020686.JPG20130130_tripletrepair_IMG_0118.JPG20130130_tripletrepair_P1020697.JPG 
  32   Monday, February 04, 2013, 16:04 Keith C NgPrimary BeamlinesRepair1A triplet repair (ground fault)Restored 1A triplet shielding and removed
RH shielding.
 
 20130204_tripletrepair_IMG_0129.JPG20130204_tripletrepair_IMG_0130.JPG20130204_tripletrepair_IMG_0132.JPG20130204_tripletrepair_IMG_0134.JPG20130204_tripletrepair_IMG_0133.JPG 
  22   Wednesday, January 16, 2013, 17:03 Keith C NgPrimary BeamlinesRepair1A triplet repairMoved 18' blocks away from triplet area
in preparation for uncovering triplet. Plastic
laid down up stream of t2 target station
  
  23   Friday, January 18, 2013, 14:40 Keith C NgPrimary BeamlinesRepair1A triplet repairCompleted uncovering
shielding and RH setup over 1A Q14 triplet
area, see photo for RH setup.
 20130118_tripletrepair_RHB_5431-web_m.jpg 
  24   Tuesday, January 22, 2013, 16:02 Keith C NgPrimary BeamlinesRepair1A triplet repair1.5 day work delay due to plant group unavailable
on the 21st of January. Gardner air compressor
was being moved.
 20130122_tripletrepair_IMG_0018_webm.jpg 
  110   Monday, February 05, 2018, 15:40 Keith C NgPrimary BeamlinesRepair1A Q15 repair.1.) Completed covering up 1A Q15.
2.) RH flask currently contains the
8 insulators removed from Q15. 3.6 mSv/h
 20180205_1aq15repair_P1030889.JPG 