112
|
Tuesday, March 13, 2018, 15:36 |
Keith C Ng | M9 | Standard Operation | m9 alignment work | Set up shielding canyon for M9 laser tracker
job.
|
|
|
117
|
Tuesday, March 27, 2018, 15:08 |
Keith C Ng | M9 | Standard Operation | t2 m9 port blank off | 1.
Blank off installed 11:40 with Dan McDonald,
east spring ear looks 'deeper" than |
|
|
122
|
Tuesday, September 24, 2019, 14:37 |
Keith C Ng | Primary Beamlines | Standard Operation | lead pig radiation survey | Surveyed contents of storage flask located
at TNF. The lid was lifted off roughly 12"
up and a pole monitor was swept over the |
|
|
130
|
Friday, May 06, 2022, 11:27 |
Keith C Ng | Primary Beamlines | Standard Operation | 4V CM1 RH joint install | 2022 Apr 28 to 29:
Installed a new remote handling 4"
indium joint for new beamline 4 north section. |
|
|
1
|
Thursday, June 30, 2011, 16:58 |
John Wong | Primary Beamlines | Repair | blah blah blah | dfdfdfdfdf |
|
|
2
|
Tuesday, February 14, 2012, 16:29 |
Keith C Ng | M20 | Repair | m20 q1 q2 repair | Warm cell reconfigured for water leak repair
at coil termination. Radiation surveys done.
M20 Q1 ready for removal of insulators. |
|
|
3
|
Thursday, February 16, 2012, 08:08 |
Keith C Ng | M20 | Repair | m20 q1 q2 repair | Insulators # 6,7,8 removed from Q1 headers
late afternoon by C Ballard. Ready for removal
and re-brazing of #7 joint some time today. |
|
|
4
|
Thursday, February 16, 2012, 16:22 |
Keith C Ng | M20 | Repair | m20 q1 q2 repair | Old #7 coil fitting removed, replaced and
re-brazed today by M Good. Insulators ready
to go back on to magnet coils to be pressure |
|
|
5
|
Friday, February 17, 2012, 15:35 |
Keith C Ng | M20 | Repair | m20 q1 q2 repair | Reinstalled ceramic insulators #6 7 8 to
Q1 magnet by C Ballard. #6 and 8 went on
with no issues. The copper tubing on insulator |
|
|
6
|
Thursday, March 01, 2012, 16:01 |
Keith C Ng | Primary Beamlines | Repair | 2C Rad Hard Valve Replacement | 4" indium flanges at the 2C rad hard
valve were cleaned of the remaining indium
by C. Ballard. Both upstream and down stream |
|
|
7
|
Thursday, May 24, 2012, 18:59 |
Grant Minor | M20 | Repair | M20 front-end leak vacuum check T2/Q1/Q2/Scraper |
Normal
0
false
false
false
|
6x |
|
8
|
Thursday, October 11, 2012, 16:40 |
Keith C Ng | M9 | Repair | m9 t2 joint repair | Today:
Bridge setup complete; Noticed 12
x 3 x 3 block when placed on top of several |
|
|
9
|
Friday, October 12, 2012, 15:12 |
Keith C Ng | M9 | Repair | M9 T2 Joint Repair cont. | Joint repair continues.
Leak Check: |
|
|
10
|
Monday, October 15, 2012, 17:03 |
Keith C Ng | M9 | Repair | M9 T2 joint repair cont. | Today:
- Removed pins and removed indium
through ring. Joint fully open at 14.5 to |
|
|
11
|
Tuesday, October 16, 2012, 19:47 |
Grant Minor | M9 | Repair | Inspection of failed double-indium thru-ring TB22148 | See inspection notes attached for failed
M9T2 double-indium thru-ring TB22148, inspected
on Oct 15th 2012. |
|
|
12
|
Tuesday, October 16, 2012, 19:50 |
Grant Minor | M9 | Repair | M9T2 Joint Repair - Status Update 16 Oct 2012 | See attached. |
|
|
13
|
Thursday, October 18, 2012, 08:26 |
Keith C Ng | M9 | Repair | M9 T2 joint repair cont. | Yesterday:
Installed indium blank off at M9
T2 joint and pumped down at 15:20 to 15:45 |
|
|
14
|
Thursday, October 18, 2012, 16:28 |
Keith C Ng | M9 | Repair | M9 T2 joint repair cont. | Today:
Completed leak check of M9 T2 area:
joint(s) are He leak tight. Remote He lines |
|
|
15
|
Friday, October 19, 2012, 16:48 |
Keith C Ng | M9 | Repair | M9 T2 Joint Repair cont. | Today:
Cleaned up work site and removed
extraneous poles and tooling. Radioactive |
|
|
17
|
Monday, October 22, 2012, 15:48 |
Keith C Ng | M9 | Repair | M9 T2 clean up and shield restoration | Today;
Restoring shielding at M9 T2 area
and cleaning up RH setup. |
|