Message ID: 5
Entry time: Friday, February 17, 2012, 15:35
|
Author: |
Keith C Ng |
Category: |
M20 |
Type: |
Repair |
Subject: |
m20 q1 q2 repair |
|
|
Reinstalled ceramic insulators #6 7 8 to Q1 magnet by C Ballard. #6 and 8 went on with no issues. The copper tubing on insulator #7 had to be bent to match the new position of the re-brazed #7 fitting. This may have been due to the removal of the inner and outer conductors (the two copper plates that clamp the two coils together) during yesterdays repair which shifted the position of the coil. See photos. |
|
|
|
|
|