Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 3     Entry time: Thursday, February 16, 2012, 08:08
Author: Keith C Ng 
Category: M20 
Type: Repair 
Subject: m20 q1 q2 repair 

Insulators # 6,7,8 removed from Q1 headers late afternoon by C Ballard. Ready for removal and re-brazing of #7 joint some time today.

Attachment 1: P1020003.JPG  5.687 MB  | Show | Hide all
Attachment 2: P1020001.JPG  5.721 MB  | Show | Hide all
ELOG V2.9.2-2455